Canadian Critical Minerals Generates USD$167,000 in Revenue from Bull River Mine
Calgary, Alberta--(Newsfile Corp. - January 28, 2025) - Canadian Critical Minerals Inc. (TSXV: CCMI) (OTCQB: RIINF) ("CCMI" or the "Company") is pleased to report revenues for the Company from the sale of stockpiled copper, gold and silver mineralized material at the Bull River Mine ("BRM") project near Cranbrook, BC. During the month of December 2024, the Company trucked 424 dry metric tonnes ("dmt") of sorted mineralized material to New Afton and the Company received a provisional payment of approximately USD$167,000 for the December 2024 shipments. The mineralized material sent to New Afton graded 5.43% Cu, 0.80 g/t Au and 59.2 g/t Ag.
Ore sorting throughput was adversely affected by winter conditions and vacations for BRM employees and contract truckers over the holiday period, resulting in less material produced for shipment and delivered to New Afton. However, grades for copper, gold and silver were the highest yet achieved through sorting operations. To-date, the Company has shipped approximately 6,255 tonnes of mineralized material to New Afton under the Ore Purchase Agreement ("OPA"). Shipped material includes 5,055 tonnes of sorted material and 1,200 tonnes of unsorted fines. Rejects from the sorting process continue to grade between 0.4% Cu and 1.0% Cu, hence, they can be economically processed in future at the BRM once the Company has received permission to restart the mill. Additionally, the Company has stockpiled approximately 60,000 tonnes of fine material that is too fine to be sent to the sorter. Fine material is expected to grade at 1.39% copper, 0.29 g/t gold and 11 g/t silver representing the average run of mine material in the original surface stockpile.
Ian Berzins, President and CEO of CCMI commented, "While the total tonnes sent to New Afton during December 2024 were lower than planned, we did achieve the highest grades yet for ore sorting at the Bull River Mine."
Qualified person
CCMI's disclosure of a technical or scientific nature in this news release has been reviewed and approved by Gary Low P.Geo., who serves as a Consultant to the Company and is a Qualified Person under the definition of National Instrument 43-101.
About Canadian Critical Minerals Inc.
CCMI is a mining company primarily focused on copper production assets in Canada. CCMI's main asset is the 100% owned Bull River Mine project near Cranbrook, British Columbia which has a Mineral Resource containing copper, gold and silver. CCMI also owns a 10.4% interest in XXIX Metal Corp. which holds a 100% interest in the Thierry Mine copper project near Pickle Lake, Ontario and a 100% interest in the Opemiska Mine copper project near Chapais-Chibougamau, Quebec.
Contact InformationCanadian Critical Minerals Inc.Ian BerzinsPresident & Chief Executive OfficerM: +1-403-512-8202E: iberzins@canadiancriticalmineralsinc.com Website: www.canadiancriticalmineralsinc.com
Caution Regarding Forward-Looking Information
This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, future work programs and objectives and expected results from such work programs. Forward-looking information necessarily involve known and unknown risks, including, without limitation, risks associated with general economic conditions; inability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favourable terms; and other risks.
Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information and the risks identified in the Company's continuous disclosure record. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this news release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this new release.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/238663
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hamilton Spectator
18 minutes ago
- Hamilton Spectator
NowVertical Group to Participate in Bristol Capital–Hosted Webinar to Showcase Business Overview
TORONTO, June 18, 2025 (GLOBE NEWSWIRE) — NowVertical Group Inc. (TSXV: NOW) ('NowVertical' or the 'Company'), a leading data and AI solutions provider, is pleased to announce its participation in an upcoming investor webinar hosted by Bristol Capital Ltd. Webinar: Overview of NowVertical's Business Strategy Featured Speakers: How to Register: Investors, analysts, media, and other stakeholders are invited to register via the Bristol Capital webinar registration link: A replay will be made available on NowVertical's investor relations page following the live event. About NowVertical Group Inc. NowVertical is a global data and analytics company which helps clients transform data into tangible business value with AI, fast. Offering a comprehensive suite of solutions and services, the Company enables clients to quickly harness the full potential of their data, driving measurable outcomes and accelerating potential return on investment. Enterprises optimize decision-making, improve operational efficiency, and unlock long-term value from their data using the Company's AI-Infused first party and third-party technologies. NowVertical is growing organically and through strategic acquisitions. For further details about NowVertical, please visit . Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. For further information, please contact: Andre Garber, CDO IR@ Investor Relations: Bristol Capital Ltd. Stefan Eftychiou stefan@ +1(905)326-1888 x60 Forward-Looking Statements This news release contains forward-looking information and forward-looking information within the meaning of applicable Canadian securities laws (together 'forward-looking statements'), including, with respect to the availability of funds under the Facilities, the ability of NowVertical to utilize funds under the Facilities, the effect of the Facilities on NowVertical's operations contemplated in this press release on NowVertical's business, finances and operations. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, and contingencies, certain of which are unknown. Forward-looking statements generally can be identified by the use of forward-looking words such as 'may', 'should', 'will', 'could', 'intend', 'estimate', 'plan', 'anticipate', 'expect', 'believe' or 'continue', or the negative thereof or similar variations. Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause future results, performance, or achievements to be materially different from the estimated future results, performance or achievements expressed or implied by the forward-looking statements and the forward-looking statements are not guarantees of future performance. Forward-looking statements are qualified in their entirety by inherent risks and uncertainties, including: adverse market conditions; risks inherent in the data analytics and artificial intelligence sectors in general; regulatory and legislative changes; that future results may vary from historical results; inability to service the Company's debt; any inability to realize the expected benefits and synergies of acquisitions or dispositions; that market competition may affect the business, results and financial condition of the Company and other risk factors identified in documents filed by the Company under its profile at , including the Company's management's discussion and analysis for the year ended December 31, 2024. Further, these forward-looking statements are made as of the date of this news release and, except as expressly required by applicable law, the Company assumes no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.
Yahoo
21 minutes ago
- Yahoo
VIZSLA SILVER PROVIDES AN UPDATE ON THE COPALA TEST MINE AT ITS PANUCO PROJECT IN MEXICO
VANCOUVER, BC, June 18, 2025 /CNW/ - Vizsla Silver Corp. (TSX: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) ("Vizsla Silver" or the "Company") is pleased to provide an update on the ongoing development of its Copala test mine at its 100%-owned Panuco silver-gold project, located in Sinaloa, Mexico. The test mine program marks a major step forward in de-risking the Panuco Project, as the Company transitions from exploration to development. The Copala portal, established as part of this program, is expected to serve as the primary access to underground mining operations following a construction decision. "We're now testing underground at Panuco and executing the test mine development according to plan, at the historic Copala district," commented COO Simon Cmrlec. "Our crews are performing well, advancing safely, installing all required ventilation and ground support, and we are meeting planned development rates. Our team is currently focused on optimising advance rates and testing contractor capabilities. This portal will ultimately become the main access for future mining. Every meter brings us closer to the 10,000-tonne bulk sample location and positions us for efficient resource conversion/expansion drilling from underground, and for the ultimate mine development and ramp-up. We are on track to complete the fully funded test mine program by year-end." Test Mine Progress Vizsla Silver has now advanced approximately 125 metres along the Copala decline. The decline is advancing in favorable ground conditions at a 15% grade with dimensions of 5.5 metres wide by 5.5 metres tall. A 10,000-tonne bulk sample will be taken from the 460 level which is approximately 70 metres vertically below the surface. The decline is currently progressing at a rate of 4 metres per day, with drilling and mucking currently being optimised to achieve two blasts per day and advance rates of around 8 metres per day. Bulk Sampling & Technical Program Upon reaching the ore zone, Vizsla Silver will extract a 10,000-tonne bulk sample and stockpile it on surface without impacting the environment by utilising previously disturbed areas. This material will ultimately be used for: Paste fill and cemented rockfill (CRF) testing to support backfill planning. Rock competency and structural consistency analysis to optimize mine design and cost models related to support requirements. Grade reconciliation with the block model. Technical Observations & Future Opportunities The Copala test mine portal is situated approximately 300 metres north of the proposed processing facility. Waste stockpiles and ore staging areas are located within 200 metres of the portal, with all current activities using existing roads and confined to previously disturbed areas from historic mining. Underground access will enable low-cost drilling from underground stations, supporting the conversion of existing resources to higher-confidence categories. Several high-priority targets have already been outlined and are expected to be tested as the decline advances. Mapped parallel structures on the surface highlight near-mine exploration upside. The onsite workforce continues to grow, with an emphasis on hiring from the local community. Newly constructed infrastructure – including first aid facilities, staff buildings, and workshops – not only supports operational efficiency, but also enhances safety protocols and emergency response capabilities. About the Panuco Project The newly consolidated Panuco silver-gold project is an emerging high-grade discovery located in southern Sinaloa, Mexico, near the city of Mazatlán. The 7,189.5-hectare, past producing district benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads, power, and permits. The district contains intermediate to low sulfidation epithermal silver and gold deposits related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation. On January 6, 2025, the Company announced an updated mineral resource estimate for Panuco which includes an estimated in-situ combined measured and indicated mineral resource of 222.4 Moz AgEq and an in-situ inferred resource of 138.7 Moz AgEq (please refer to Vizsla's press release dated January 6, 2025). About Vizsla Silver Vizsla Silver is a Canadian mineral exploration and development company headquartered in Vancouver, BC, focused on advancing its flagship, 100%-owned Panuco silver-gold project located in Sinaloa, Mexico. The Company recently completed a Preliminary Economic Study for Panuco in July 2024 which highlights 15.2 Moz AgEq of annual production over an initial 10.6-year mine life, an after-tax NPV5% of US$1.1B, 86% IRR and a 9-month payback at US$26/oz Ag and US$1,975/oz Au. Vizsla Silver aims to become the world's leading silver company by implementing a dual track development approach at Panuco, advancing mine development, while continuing district scale exploration through low-cost means. Quality Assurance / Quality Control Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico and in North Vancouver, Canada for sample preparation and for analysis at the ALS laboratory in North Vancouver and rock samples were shipped to SGS Lab in Durango Mexico for sample preparation and analysis. The ALS Zacatecas, North Vancouver facilities and SGS lab are ISO 9001 and ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with AA finish. Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's quality assurance / quality control protocol. Qualified Person In accordance with NI 43-101, Jesus Velador, Ph.D., MMSA QP, Vice President of Exploration, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release. Information Concerning Estimates of Mineral Resources The scientific and technical information in this news release was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC"). The terms "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which definitions have been adopted by NI 43-101. Accordingly, information contained herein providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder. You are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures. Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7. Effective February 25, 2019, the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the "SEC Modernization Rules"), with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources". Information regarding mineral resources contained or referenced herein may not be comparable to similar information made public by companies that report according to U.S. standards. While the SEC Modernization Rules are purported to be "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral resources that the Company may report as "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules. SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS This news release includes certain "Forward–Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward–looking information" under applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions, identify forward–looking statements or information. Forward–looking statements and forward–looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for Vizsla and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of silver, gold, and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Vizsla's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms. These statements reflect Vizsla's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward–looking statements or forward-looking information and Vizsla has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on one mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities in Mexico; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption "Risk Factors" in Vizsla's management discussion and analysis. Readers are cautioned against attributing undue certainty to forward–looking statements or forward-looking information. Although Vizsla has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. Vizsla does not intend, and does not assume any obligation, to update these forward–looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law. View original content to download multimedia: SOURCE Vizsla Silver Corp. View original content to download multimedia:


Business Wire
28 minutes ago
- Business Wire
Quantum to Release Fiscal Fourth Quarter and Full Year 2025 Financial Results on Monday, June 30, 2025
SAN JOSE, Calif.--(BUSINESS WIRE)--Quantum ® Corporation (NASDAQ: QMCO) ("Quantum" or the "Company") today announced it will release financial results for its fiscal fourth quarter and full year 2025 on Monday, June 30, 2025, after the markets close. Newly appointed Chief Executive Officer, Hugues Meyrath, and Chief Financial Officer, Lewis Moorehead, will host a Business Update conference call and review of the Company's fiscal 2025 financial results on Thursday, July 3, 2025 at 8:30 a.m. Eastern Time (5:30 a.m. Pacific Time). Analysts and investors are invited to join the conference call using the following information: A telephone replay of the conference call will be available approximately two hours after the conference call and will be available through July 10, 2025. To access the replay dial 1-877-660-6853 and enter the conference ID 13754479 at the prompt. International callers should dial +1-201-612-7415 and enter the same conference ID. Following the conclusion of the live call, a replay of the webcast will be available on the Company's website for at least 90 days. About Quantum Quantum delivers end-to-end data management solutions designed for the AI era. With over four decades of experience, our data platform has allowed customers to extract the maximum value from their unique, unstructured data. From high-performance ingest that powers AI applications and demanding data-intensive workloads, to massive, durable data lakes to fuel AI models, Quantum delivers the most comprehensive and cost-efficient solutions. Leading organizations in life sciences, government, media and entertainment, research, and industrial technology trust Quantum with their most valuable asset – their data. Quantum is listed on Nasdaq (QMCO). For more information visit Quantum and the Quantum logo are registered trademarks of Quantum Corporation and its affiliates in the United States and/or other countries. All other trademarks are the property of their respective owners.