
First Town Vending Committee meet held in Vijayawada
VIJAYAWADA: Vijayawada Municipal Corporation (VMC) Commissioner HM Dhyanachandra held the first meeting of the Town Vending Committee on Thursday, aiming to address street vendors' issues and reduce conflicts with traders.
Formed as per the Supreme Court's directives, the 19-member committee includes the commissioner as chairman, along with the medical officer, planning officer, town project officer, police officials, bankers, a legal advisor, an insurance representative, seven street vendors from various sectors, two corporators, and NGOs.
During the meeting, he cited a 2018 survey that identified approximately 17,000 street vendors across the city. He directed officials to conduct a fresh survey to ascertain the current number of vendors. He emphasised that under the Street Vendors Act, VMC will provide necessary facilities to vendors, allowing them to operate in designated Red, Green, and Amber zones.
He assured the panel would work to resolve vendors' concerns and support their livelihoods. Chief City Planner Sanjay Ratna Kumar and other senior officials were present.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
04-06-2025
- Time of India
Andhra Pradesh government revives anti-plastic drive with new incentives
Vijayawada: In a renewed effort to combat plastic pollution, authorities in Andhra Pradesh are reviving past initiatives to drastically reduce the use of single-use plastic, particularly in major urban centres like Vijayawada, Visakhapatnam, Tirupati, and Kurnool. Tired of too many ads? go ad free now These initiatives aim to protect the environment while also creating new employment opportunities, especially for women and rural communities. The state's municipal department estimated in 2018 that over 70% of single-use plastic in cities could be eliminated by replacing plastic bags and food packaging with eco-friendly alternatives. Although a formal ban was imposed that year, enforcement weakened over time, especially during the COVID-19 pandemic, when the use of plastic surged again due to hygiene concerns. In Vijayawada alone, 150 metric tons of garbage is generated daily—over 90% of which is single-use plastic. To curb this, the Vijayawada Municipal Corporation (VMC) initially encouraged the use of cloth and jute bags and promoted food packaging in lotus or banana leaves. The initiative gained initial support but later lost momentum due to cost and availability issues. With the new NDA govt in place, the anti-plastic campaign is being re-energised. The govt now plans to provide training and subsidies to women-led self-help groups under the MSME programme for manufacturing biodegradable items such as banana-leaf plates and wooden spoons. Lotus leaves cultivated in ponds near urban areas are also being promoted for use in hotels and meat shops, aligning with both environmental goals and rural employment generation. To further encourage public participation, the municipal department plans to convince sellers to offer discount-based incentives. Hotels offering takeout will give concessions to customers who bring their own containers, while meat shops will provide a 3% discount for those avoiding plastic bags. The AP pollution control board (APPCB) and voluntary organisations are also working together to develop a sustainable plan to eliminate plastic use through public awareness campaigns and competitions.


Time of India
04-06-2025
- Time of India
VMC revives proposal for new bridge at Kamatibaug Zoo
Vadodara: The Vadodara Municipal Corporation (VMC) will go ahead with the construction of a new bridge for visitors at the Kamatibaug Zoo. The existing bridge, built during the reign of Maharaja Sayajirao Gaekwad III, was shut to the public in 2023 due to safety concerns. The bridge, which links the aviary with the main zoo premises, was first closed to heavy and four-wheel vehicles in 2022, after signs of structural ageing were noted. Following the Morbi bridge collapse later that year, authorities decided to completely bar public access to the old bridge. For a while, it was used only by zoo and garden officials, but even that was stopped after the VMC's bridge department raised fresh red flags over its safety. Plans to build a parallel bridge have been under consideration since last year. However, the civic body's standing committee initially rejected the proposal when the lowest bid for the construction turned out to be 35% higher than the estimated cost. Even after negotiations, the revised bid stood 32.3% above the Rs 11.64 crore estimate. The contractor had quoted Rs 14.62 crore, which the committee found too steep. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch vàng CFDs với mức chênh lệch giá thấp nhất IC Markets Đăng ký Undo The proposal was then returned with a suggestion to explore the possibility of strengthening or restoring the heritage bridge. A report by Sardar Vallabhbhai National Institute of Technology (SVNIT), Surat, later confirmed that the existing bridge could not be strengthened or rehabilitated. Zoo officials, meanwhile, have been pushing for a new bridge, pointing out that the lack of direct access has disrupted daily operations. Staff now have to take longer routes to transport food and other supplies. Visitors — especially schoolchildren and senior citizens — are also facing inconvenience as they have to walk extra distances to access different sections of the zoo due to the closure of the old bridge. In light of the SVNIT findings and the challenges faced by zoo personnel and the public, a new proposal has been drafted. Sources said the same contractor who submitted the original bid last year has now agreed to maintain the quoted price and extend the validity of the tender. The revised proposal has once again been submitted to the standing committee and is expected to come up for discussion later this week.


Time of India
02-06-2025
- Time of India
Bioengineering work to stabilize river banks begins
Vadodara: The Vadodara Municipal Corporation (VMC) started extensive work using bioengineering to stabilise the banks of the Vishwamitri following the extensive dredging done there for its resectioning. Geotextile, coir and vetiver grass are being used to stabilize the banks. The effort began on an experimental basis in April, after which work was awarded to a contractor for an area of 1.34 lakh square metres last month for the first phase of the process of stabilizing the bank. If the results are satisfactory, more work will be taken up. For the first phase, VMC will spend Rs 4.9 crore. The VMC standing committee chairman, Sheetal Mistry, said that the geotextile is fixed over the layer of coir, and vetiver grass is planted through the geotextile and the coir. The process ensures moisture is retained in the soil and helps the growth of the grass. Water is being sprinkled on the geotextile to keep it moist. Mistry said that so far, work was taken up on a 2.3km stretch of the river. Mayor Pinky Soni, municipal commissioner Arun Mahesh Babu, Mistry, and other officials visited the site where work was being carried out. They checked the progress of work on the stabilization process. Mistry said 92% of the dredging work has been completed.