
At global meet, India, others discuss progressive taxation, carbon levies to deal with hazardous waste
BRS COPs 2025 held in Geneva
NEW DELHI: Many countries, including India, at an ongoing global convention in Geneva have discussed the importance of predictable international financing mechanisms and the mobilization of domestic resources through tools such as 'progressive taxation and carbon levies' to deal with the often-unseen threats of hazardous chemicals and waste, particularly in nations with constrained fiscal capacity.
The summary of their discussion — ministerial roundtable on 'means of implementation' — was presented by environment minister Bhupender Yadav at the Conference of the Parties (COPs) to the Basel, Rotterdam and Stockholm (BRS) Conventions in Geneva on Thursday.
The COPs, being held from April 28 to May 9, is a joint meeting of countries that focus on global efforts to manage hazardous chemicals and waste in an environmentally sound manner.
The roundtable also discussed the need for innovative financing solutions, including 'green bonds,
debt-for-nature swaps
, chemical certificates, and green loans', as critical tools to attract private investment to deal with the issues of hazardous chemicals and waste.
Yadav at the roundtable highlighted that the effective execution of the
BRS Conventions
relies significantly on access to finance, technology transfer, capacity-building and technical assistance, and strengthened international cooperation.
He outlined India's integrated approach to implementing the conventions through national legislation such as the Environment (Protection) Act, the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, and the E-Waste Management Rules, 2016, which are supported by sustained investments in institutional and technical infrastructure.
'The necessity of coherent and transparent regulatory frameworks that incentivize private sector engagement through supportive policies such as bans on single-use plastics and tax incentives for green technologies was suggested,' said a statement released by the environment ministry on Friday.
It said, 'Ministers also agreed on the importance of regional cooperation, including the strengthening of regional centres to enable technical exchange, shared infrastructure, and capacity development.'
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


United News of India
an hour ago
- United News of India
Notice drama won't shake us, everything has been explained: BRS Working Prez
Hyderabad, June 9 (UNI) A few hours after appearing before Justice Pinaki Chandra Ghose Commission probing the alleged irregularities in the execution of Kaleshwaram Lift Irrigation Project (KLIP) by former Irrigation Minister and BRS MLA T. Harish Rao, the party on Monday evening denounced as "politically motivated harassment" the issuance of notices by investigating bodies. The Commission had earlier also served notice to BRS President and former Chief Minister K Chandrashekar Rao (KCR) to appear before it on Wednesday. In a statement, KTR said 'These notices are simply attempts to irritate and distract us'. We have already stated everything that needs to be said. Today, Harish Rao presented all the facts before the commission in full detail'. "Commission has nothing new to ask KCR — everything that needed to be said has already been said,' KTR, the son of KCR, declared. "KCR achieved in four years what Congress couldn't in decades', he pointed out. Drawing comparisons, KTR noted that while Congress governments took decades to construct major projects like Bhakra Nangal, Nagarjuna Sagar, Narmada, and SRSP, KCR completed Kaleshwaram in record time. 'This is no small accomplishment. Had this occurred in another country, KCR would have been decorated with the highest awards. But here, the very parties that failed to deliver for decades are trying to demonize a leader who delivered the impossible,' he said. Criticising the Congress regime under Chief Minister Revanth Reddy, KTR said, 'They came to power by making 420 fake promises, only to betray the public'. 'This Congress government is leading the state down a dangerous, destructive path,' he said He further accused Revanth Reddy of using media manipulation to mislead the public. 'This media-management trickery cannot cover up their incompetence forever,' he added. UNI KNR NST SSP


Time of India
an hour ago
- Time of India
BRS govt followed engineers' advice on KLIS: Harish to Ghose panel
1 2 Hyderabad: Former irrigation minister T Harish Rao has staunchly defended the BRS govt's decisions on Kaleshwaram project, asserting they were backed by technical recommendations, cabinet approvals, and driven by ground realities, including inter-state constraints. Deposing before the Justice (retired) PC Ghose Commission of Inquiry on Monday, Harish Rao, who held the irrigation portfolio between 2014 and 2018, clarified that the former BRS govt had shifted the Kaleshwaram project location from Tummidihatti to Medigadda based on expert committee advice, water availability, and political hurdles with neighbouring Maharashtra. "The Central Water Commission itself said the proposed water availability at Tummidihatti was not feasible. Of the 160 tmcft expected, 63 tmcft had already been allocated to upstream states. The CWC even wrote to the state to reconsider the proposal," Harish Rao said during the 40-minute hearing, conducted in English and Hindi. He supported his statements with a line diagram of the project. He added that an expert committee of retired engineers had also flagged concerns over Tummidihatti's viability. "The idea was to irrigate 16 lakh acres, but even the engineering committee recommended creating artificial reservoirs instead," he said. The ex-minister also highlighted Maharashtra's strong opposition to the barrage at 152 metres elevation due to submergence and local resistance. "Despite several rounds of meetings with Maharashtra ministers and even their then CM Devendra Fadnavis, who candidly remarked that even when the Congress was in power, both in state and at the Centre, they could not push this project through for seven years. How could we have succeeded where they failed, given the local anger," Harish Rao said. He maintained the eventual decision to shift to Medigadda and reconfigure Annaram and Sundilla barrages was guided by a Water and Power Consultancy Services (WAPCOS) survey and recommendations from both serving and retired engineers. "Even major projects like Nagarjuna Sagar, SRSP, and the recent Kanthanpally saw location changes after field surveys — so such revisions were not unprecedented," he said. On the barrage failures, Harish Rao distanced the political executive from operational decisions. "Filling up of barrages was entirely a decision of field-level engineers and the irrigation department. The govt had no role in that," he claimed. When asked about the Kaleshwaram Lift Irrigation Corporation, Harish Rao confirmed that it was created as a special purpose vehicle to raise loans. "The initial plan was to generate revenue through water tariffs from industries, but Covid-19 disrupted that. The state then stepped in with budgetary support, and the govt never defaulted," he said. Harish Rao also pointed out that all decisions regarding Kaleshwaram—barrage locations, project structure, and KLIC formation—had cabinet backing. "Some decisions, especially on technical grounds, were made on the advice of engineers. Govts cannot override technical feasibility," he reiterated. His deposition comes at a time when the BRS is under political fire following structural failures in the prestigious multi-purpose Kaleshwaram project, which was often showcased by the party as a symbol of Telangana's irrigation resurgence.


Time of India
2 hours ago
- Time of India
Telangana govt to issue clear norms on formation of new panchayats
Hyderabad: The Telangana govt has decided to frame clear and streamlined guidelines for the creation of new panchayats, citing the need to balance administrative feasibility with community benefit. Tired of too many ads? go ad free now Officials said that upgrading villages with populations below 500 into independent panchayats has proven to be a financial burden without offering significant public advantages. Since the Congress govt came to power, the panchayat raj department has received nearly 250 proposals from across the state, primarily pushed by ministers, MLAs, MPs, and other elected representatives. Most of these leaders are keen to fulfil promises made during the assembly election campaign, where commitments were made to grant panchayat status to smaller settlements. Sources said the department has compiled data on the requests. Of the 250 applications, only 37 villages meet the minimum population requirement of 500, as mandated under the Panchayat Raj Act. The rest fall short — in some cases, by a wide margin. In one instance, a village with just 90 families has been recommended for panchayat status. According to current norms, a village must have at least 500 people and be located at least three kilometres away from the nearest existing panchayat to be eligible for upgradation. Given these legal stipulations, officials have currently put all proposals on hold. They also clarified that the formation of new panchayats is unlikely before the upcoming local body elections. Apart from legal hurdles, the govt is also wary of the financial implications. New panchayats require infrastructure, staff, and budgetary support — all of which place a strain on state resources, especially when created without adequate population base or planning. Tired of too many ads? go ad free now The previous BRS govt had created over 3,000 new village panchayats, including many small hamlets and tribal thandas, drawing criticism for bypassing norms. Most of these were established at the behest of MLAs and other leaders, ignoring the demographic and economic viability of such administrative units.