Latest news with #MineralResourceEstimate


Cision Canada
13 hours ago
- Business
- Cision Canada
Arizona Metals Intersects 29.6 m @ 10.7 g/t AuEq in Kay2 Zone and Drills Third-Highest Gold Assay on the Kay Mine Project
/NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES/ TORONTO, June 24, 2025 /CNW/ - Arizona Metals Corp. (TSX: AMC) (OTCQX: AZMCF) (the "Company" or "Arizona Metals") is pleased to announce assay results from one drill hole in the Kay2 Zone at the Kay project in Arizona. Drill hole KM-25-181 intersected 29.6 m @ 10.7 g/t AuEq, including 13.6 m @ 17.8 g/t AuEq (Figure 1, Table 1). Drill hole 181 is among the most gold-rich holes drilled in the deposit to date, and includes the project's third-highest gold assay from drilling: 35.8 g/t Au (756.2-757.1 m). The hole is located approximately 90 m below and deeper in the deposit than hole KM-24-166, the discovery hole in the Kay2 Zone. This is a significant intercept and will be incorporated in the upcoming Mineral Resource Estimate ("MRE"). Duncan Middlemiss, President and CEO of Arizona Metals, comments:"The high gold grades in the Kay2 Zone continue to indicate a robust mineralized system at Kay and illustrate additional potential for the Kay2 Zone to add value to the overall deposit. Results from hole 181 will be included in the upcoming mineral resource estimate for the Kay project, which remains on track for release this month." To date, drilling in the Kay2 Zone has demonstrated dimensions of 100 m along strike and 160 m vertically, with consistently high gold grades throughout. The Kay2 Zone is located approximately 100 m north of previously drilled mineralization in the Kay deposit. With the completion of recent drill holes, Arizona Metals has drilled a total of 135,000 meters on the property. The Company is fully funded and on track to deliver a Mineral Resource Estimate this month, followed by a Preliminary Economic Assessment ("PEA") in the second half of 2025, for its Kay Mine project (the "Kay Project") located in Yavapai County, Arizona. G Mining Services Inc. ("G Mining") has been engaged to audit the MRE and complete the PEA. The current phase of resource drilling is complete, and the Company has mobilized the two drill rigs to the Kay North Extension target, to be followed by drilling on the North-Central and Western Targets. These areas will be drilled for the first time from newly-permitted and strategically-positioned drill pads, designed to optimize targeting and access. The Company plans 10,000 m of exploration drilling at these targets with holes ranging from 300 m to 900 m in depth. The Company has chosen these high-priority targets based on analysis of geologic, geochemical, and geophysical exploration data generated to date on the project. Additionally, 5,000 m of reverse circulation drilling is planned at the Company's Sugarloaf Peak Gold Project (the "Sugarloaf Peak Project") in La Paz County, Arizona. Drilling and road-construction contractors have been chosen for the project, and the Company is preparing to mobilize crews during Q3. The Company is executing on all of its previously-stated goals for 2025 and looks forward to continuing the development of the Company's strong assets. Table 1. Results of Phase 3 Drill Program at the Kay Project, Yavapai County, Arizona announced in this news release. The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (2) Assumptions used in USD for the copper and gold metal equivalent calculations were metal prices of $4.63/lb Copper, $1937/oz Gold, $25.20/oz Silver, $1.78/lb Zinc, and $1.02/lb Pb. Metal Equivalent calculations used assumed metal recoveries, based on a preliminary review of historic data by SRK and ProcessIQ, were 93% for copper, 92% for zinc, 90% for lead, 72% silver, and 70% for gold. The following equation was used to calculate copper equivalence: CuEq = Copper (%) (93% rec.) + (Gold (g/t) x 0.61)(70% rec.) + (Silver (g/t) x 0.0079)(72% rec.) + (Zinc (%) x 0.3844)(92% rec.) + (Lead (%) x 0.2203)(90% rec.). The following equation was used to calculate gold equivalence: AuEq = Gold (g/t)(70% rec.) + (Copper (%) x 1.638)(93% rec.) + (Silver (g/t) x 0.01291)(72% rec.) + (Zinc (%) x 0.6299)(92% rec.) +(Lead (%) x 0.3609)(90% rec.). Analyzed metal equivalent calculations are reported for illustrative purposes only. The metal chosen for reporting on an equivalent basis is the one that contributes the most dollar value after accounting for assumed recoveries. About Arizona Metals Corp Arizona Metals Corp owns 100% of the Kay Project in Yavapai County, which is located on 1669 acres of patented and BLM mining claims and 193 acres of private land that are not subject to any royalties. An historic estimate by Exxon Minerals in 1982 reported a "proven and probable reserve of 6.4 million short tons at a grade of 2.2% copper, 2.8 g/t gold, 3.03% zinc, and 55 g/t silver." The historic estimate at the Kay Mine Project was reported by Exxon Minerals in 1982. (Fellows, M.L., 1982, Kay Mine massive sulphide deposit: Internal report prepared for Exxon Minerals Company) The Kay Project's historic estimate has not been verified as a current mineral resource. None of the key assumptions, parameters, and methods used to prepare the historic estimate were reported, and no resource categories were used. Significant data compilation, re-drilling and data verification may be required by a Qualified Person before the historic estimate can be verified and upgraded to be a current mineral resource. A Qualified Person has not done sufficient work to classify it as a current mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral resource. The Kay Project is a steeply dipping VMS deposit that has been defined from a depth of 60 m to at least 900 m. It is open for expansion on strike and at depth. The Company also owns 100% of the Sugarloaf Peak Project, in La Paz County, which is located on 4,400 acres of BLM claims. The Sugarloaf Peak Project is a heap-leach, open-pit target and has a historic estimate of "100 million tons containing 1.5 million ounces gold" at a grade of 0.5 g/t (Dausinger, N.E., 1983, Phase 1 Drill Program and Evaluation of Gold-Silver Potential, Sugarloaf Peak Project, Quartzsite, Arizona: Report for Westworld Inc.) The historic estimate at the Sugarloaf Peak Project was reported by Westworld Resources in 1983. The historic estimate has not been verified as a current mineral resource. None of the key assumptions, parameters, and methods used to prepare the historic estimate were reported, and no resource categories were used. Significant data compilation, re-drilling and data verification may be required by a Qualified Person before the historic estimate can be verified and upgraded to a current mineral resource. A Qualified Person has not done sufficient work to classify it as a current mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral resource. Qualified Person and Quality Assurance/Quality Control All of Arizona Metals' drill sample assay results have been independently monitored through a quality assurance/quality control ("QA/QC") protocol which includes the insertion of blind standard reference materials and blanks at regular intervals. Logging and sampling were completed at Arizona Metals' core handling facilities located in Phoenix and Black Canyon City, Arizona. Drill core was diamond sawn on site and half drill-core samples were securely transported to ALS Laboratories' ("ALS") sample preparation facility in Tucson, Arizona. Sample pulps were sent to ALS's labs in Vancouver, Canada, and Reno, Nevada, for analysis. Gold content was determined by fire assay of a 30-gram charge with ICP finish (ALS method Au-AA23). Silver and 32 other elements were analyzed by ICP methods with four-acid digestion (ALS method ME-ICP61a). Over-limit samples for Au, Ag, Cu, and Zn were determined by ore-grade analyses Au-GRA21, Ag-OG62, Cu-OG62, and Zn-OG62, respectively. ALS Laboratories is independent of Arizona Metals Corp. and its Vancouver and Reno facilities are ISO 17025 accredited. ALS also performed its own internal QA/QC procedures to assure the accuracy and integrity of results. Parameters for ALS' internal and Arizona Metals' external blind quality control samples were acceptable for the samples analyzed. Arizona Metals is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data referred to herein. The qualified person who reviewed and approved the technical disclosure in this release is David Smith, CPG, a qualified person as defined in National Instrument43-101 – Standards of Disclosure for Mineral Projects. Mr. Smith supervised the preparation of the scientific and technical information that forms the basis for this news release and has reviewed and approved the disclosure herein. Mr. Smith is the Vice-President, Exploration of the Company. Mr. Smith supervised the drill program and verified the data disclosed, including sampling, analytical and QA/QC data, underlying the technical information in this news release, including reviewing the reports of ALS, methodologies, results, and all procedures undertaken for quality assurance and quality control in a manner consistent with industry practice, and all matters were consistent and accurate according to his professional judgement. There were no limitations on the verification process. Disclaimer This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements contained in this press release include, without limitation, statements regarding the expansion potential of the Kay Project, statements regarding drill results and future drilling of the Kay2 Zone, the main Kay deposit and expansion drilling targets on the Kay Project, statements regarding Kay2 Zone mineralization, statements regarding Kay2 Zone mineralization and the contribution of the Kay2 Zone mineralization to the mineral resource estimate for the Kay deposit, and the mineral resource estimate being completed in H1 2025 or at all, statements regarding drilling and other exploration activity on the Sugarloaf Peak Gold Project, statements regarding completion of a PEA in H2 2025 or at all, statements regarding execution of the Company's plans for 2025 and the achievement of targeted milestones.. In making the forward- looking statements contained in this press release, the Company has made certain assumptions. Although the Company believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: availability of the Company to stay well funded; delay or failure to receive required permits or regulatory approvals; and general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, the Company disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward- looking statements or otherwise.


Hamilton Spectator
12-06-2025
- Business
- Hamilton Spectator
Osisko Metals Intersects 0.33% Cu Over 258 Metres at Gaspé
Includes 15.6 Metres Averaging 1.47% Cu and 8.5 g/t Ag E Zone Skarn Returns 29.7 Metres Averaging 1.92% Cu and 15.2 g/t Ag Infill Drilling Continues to Extend Deposit at Depth Below 2024 MRE MONTREAL, June 12, 2025 (GLOBE NEWSWIRE) — Osisko Metals Incorporated (the 'Company or 'Osisko Metals') ( TSX-V: OM ; OTCQX: OMZNF ; FRANKFURT: 0B51 ) is pleased to announce new drilling results from the 2025 drilling program at the Gaspé Copper Project, located in the Gaspé Peninsula of Eastern Québec. Results for eight new holes are reported below, located at the southern end of the deposit defined in the 2024 Mineral Resource Estimate ('MRE', see attached map and November 14, 2024 news release ). Highlights (see Table 1 below): Table 1: Drill hole mineralized intervals, see attached map for drill hole locations. Drill hole 30-1073 was drilled to the east of the 2024 MRE limit and did not intersect significant mineralization. Previously reported drill holes 30-1062 and 30-1066 were also collared to the southeast and to the east, respectively, of the 2024 MRE limit and these holes also failed to intersect significant mineralization, indicating that the deposit does not extend towards the east. The deposit remains open to the south and southwest. All holes were drilled sub-vertically into the altered calcareous stratigraphy which dips 20 to 25 degrees to the north; true widths are estimated at 90-92% of reported widths. The L1 (C Zone) the L2 (E Zone) skarn/marble horizons were intersected in most holes, as well as intervening porcellanites (pale green to white potassic-altered hornfels) that host the bulk of the disseminated copper mineralization. The November 2024 MRE was limited at depth to the base of the L1 skarn horizon (C Zone), and all mineralized intersections below this horizon represent potential depth extensions to the deposit, to be included in the next scheduled MRE update in Q1 2026. Mineralization occurs as disseminations and veinlets of chalcopyrite and is mostly stratigraphically controlled in the area of Needle Mountain, Needle East and Copper Brook. As expected, no significant molybdenum mineralization was encountered in porcellanites in the latter areas, but high grades (up to 0.4% Mo) were locally obtained in both the C Zone and E Zone skarns. The bulk of the molybdenum mineralization occurs in veinlet stockworks further north at Copper Mountain, where true porphyry copper-style mineralization occurs, forming a distinct secondary mineralized zone that is characterized by widespread, continuous copper-molybdenum stockwork mineralization radiating from the central source of hydrothermal fluids, i.e. the Copper Mountain porphyry intrusion. At least five vein/stockwork mineralizing events have been recognized at Copper Mountain, which overprint earlier skarn/porcellanite-hosted mineralization throughout the Gaspé Copper system. The 2022 to 2024 Osisko Metals drill programs were focused on defining open-pit resources within the Copper Mountain stockwork mineralization, leading to the May 2024 MRE (see May 6, 2024 press release). Extending the resource model south of Copper Mountain into the poorly-drilled primary skarn/porcellanite portion of the system subsequently led to a significantly increased resource, mostly in the Inferred category (see November 14, 2024 press release). The current drill program is designed to convert the November 2024 MRE to Measured and Indicated categories, as well as test the extension of the system deeper into the stratigraphy and laterally to the south and southwest towards Needle East and Needle Mountain respectively. Qualified Person Mr. Bernard-Olivier Martel, P. Geo. is the Independent Qualified Person responsible for the technical data reported in this news release and he is a Professional Geologist registered in the Province of Quebec. Quality Assurance / Quality Control Mineralized intervals reported herein are calculated using an average 0.12% copper lower cut-off over contiguous 20-metre intersections (shorter intervals as the case may be at the upper and lower limits of reported intervals). Intervals of 20 metres or less are not reported unless indicating significantly higher grades. Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.'s preparation facility in Sudbury. Sample preparation details (code PREP-31DH) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for copper, molybdenum and silver. About Osisko Metals Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals sector, with a focus on copper and zinc. The Company acquired a 100% interest in the past-producing Gaspé Copper mine from Glencore Canada Corporation in July 2023. The Gaspé Copper mine is located near Murdochville in Québec ' s Gaspé Peninsula. The Company is currently focused on resource expansion of the Gaspé Copper system, with current Indicated Mineral Resources of 824 Mt averaging 0.34% CuEq and Inferred Mineral Resources of 670 Mt averaging 0.38% CuEq (in compliance with NI 43-101). For more information, see Osisko Metals' November 14, 2024 news release entitled ' Osisko Metals Announces Significant Increase in Mineral Resource at Gaspé Copper '. Gaspé Copper hosts the largest undeveloped copper resource in eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec. In addition to the Gaspé Copper project, the Company is working with Appian Capital Advisory LLP through the Pine Point Mining Limited joint venture to advance one of Canada ' s largest past-producing zinc mining camps, the Pine Point project, located in the Northwest Territories. The current mineral resource estimate for the Pine Point project consists of Indicated Mineral Resources of 49.5 Mt averaging 5.52% ZnEq and Inferred Mineral Resources of 8.3 Mt averaging 5.64% ZnEq (in compliance with NI 43-101). For more information, see Osisko Metals ' June 25, 2024 news release entitled 'Osisko Metals releases Pine Point mineral resource estimate: 49.5 million tonnes of indicated resources at 5.52% ZnEq' . The Pine Point project is located on the south shore of Great Slave Lake, Northwest Territories, close to infrastructure, with paved road access, an electrical substation and 100 kilometers of viable haul roads. For further information on this news release, visit or contact: Don Njegovan, President Email: info@ Phone: (514) 861-4441 Cautionary Statement on Forward-Looking Information This news release contains 'forward-looking information' within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as 'expects', or 'does not expect', 'is expected', 'interpreted', 'management's view', 'anticipates' or 'does not anticipate', 'plans', 'budget', 'scheduled', 'forecasts', 'estimates', 'potential', 'feasibility', 'believes' or 'intends' or variations of such words and phrases or stating that certain actions, events or results 'may' or 'could', 'would', 'might' or 'will' be taken, occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains forward-looking information pertaining to, among other things: the tax treatment of the FT Units; the timing of incurring the Qualifying Expenditures and the renunciation of the Qualifying Expenditures; the ability to advance Gaspé Copper to a construction decision (if at all); the ability to increase the Company's trading liquidity and enhance its capital markets presence; the potential re-rating of the Company; the ability for the Company to unlock the full potential of its assets and achieve success; the ability for the Company to create value for its shareholders; the advancement of the Pine Point project; the anticipated resource expansion of the Gaspé Copper system and Gaspé Copper hosting the largest undeveloped copper resource in eastern North America. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: the ability of exploration results, including drilling, to accurately predict mineralization; errors in geological modelling; insufficient data; equity and debt capital markets; future spot prices of copper and zinc; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of mining equipment and positive relations with local communities and groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company's public disclosure record on SEDAR+ ( under Osisko Metals' issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward- looking information, whether as a result of new information, future events or otherwise, other than as required by law. A photo accompanying this announcement is available at:
Yahoo
26-05-2025
- Business
- Yahoo
Gold Resource Increase on Globex's Parbec Royalty Property
ROUYN-NORANDA, Quebec, May 26, 2025 (GLOBE NEWSWIRE) -- GLOBEX MINING ENTERPRISES INC. (GMX – Toronto Stock Exchange, G1MN – Frankfurt, Stuttgart, Berlin, Munich, Tradegate, Lang & Schwarz, LS Exchange, TTMzero, Düsseldorf and Quotrix Düsseldorf Stock Exchanges and GLBXF – OTCQX International in the US) is pleased to inform shareholders that Renforth Resources Inc. (RFR-CSE, RFHRF-OTC, 9RR-FSE) has published a new NI 43-101 Resource Estimate Technical Report as regards the Parbec Property in Malartic Township, Quebec. Globex retains a 3% Gross Metal Royalty on all mineral production from the property which is located 5 kilometres west of the large open pit Agnico Eagle Malartic Gold Mine along the gold localizing Cadillac Break. Renforth announced a 29% increase in the resource estimate with 73% of the new mineral resource now in the Measured and Indicated categories. The resource data summary by SGS Canada Inc. is reproduced below. April 2025 Parbec Gold Deposit MRE(1) Mineral Resources are reported at a cut-off grade of 0.27 g/t Au for the open-pit mining scenario and 1.40 g/t Au for the underground mining scenario(2) The cut-off grades were determined at a gold price of 2,100 US$ per ounce.(3) The mineral resources were estimated in compliance with Canadian Institute of Mining, Metallurgy and Petroleum standards. These mineral resources were reported in accordance with the NI 43-101 standards.(4) Mineral resources do not constitute mineral reserves because they have not demonstrated economic viability.(5) Inferred resources are exclusive of measured and indicated resources.(6) The effective date of these mineral resources is April 4, 2025.(7) Assumptions used are a mining recovery of 95%, a mining dilution of 5%, processing recovery of 95%, processing cost of 12.75 US$/t, general and administration of 1.50 US$/t, open-pit mining cost of 2.5 US$/t for ore, 2 US$/t for waste and underground mining cost of 66 US$/t.(8) All resources are presented in-situ and undiluted.(9) All $ values are in US$ unless specifically noted.(10) All figures are rounded to reflect the relative accuracy of the estimate. Numbers may not add due to rounding. 173 NQ drill holes totalling 46,144 metres and 28,404 assayed samples totalling 31,483 metres were incorporated into the new resource calculation, undertaken by Yann Camus, at SGS Canada Inc. and a qualified person as defined by National Instrument 43-101, in a NI 43-101 report titled Technical Report on the Mineral Resource Estimate Updated for the Parbec Gold Deposit, Abitibi-Temiscamingue Region, Québec, Canada, May 22, 2025. The NI-43-101 may be accessed on Sedar or on Globex's web site. The Renforth press release may be accessed by clicking through here. Globex is pleased with the progress by Renforth in upgrading the resource both in number of gold ounces and in the upgrading of the quality much of the resource into the Measured and Indicated categories. This press release was written by Jack Stoch, P. Geo., President and CEO of Globex in his capacity as a Qualified Person (Q.P.) under NI 43-101. We Seek Safe Harbour. Foreign Private Issuer 12g3 – 2(b) CUSIP Number 379900 50 9LEI 529900XYUKGG3LF9PY95 For further information, contact: Jack Stoch, & CEOGlobex Mining Enterprises Inc.86, 14th StreetRouyn-Noranda, Quebec Canada J9X 2J1 Tel.: 819.797.5242Fax: 819.797.1470 info@ Forward-Looking Statements: Except for historical information, this news release may contain certain 'forward-looking statements'. These statements may involve a number of known and unknown risks and uncertainties and other factors that may cause the actual results, level of activity and performance to be materially different from the expectations and projections of Globex Mining Enterprises Inc. ('Globex'). No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, or if any of them do so, what benefits Globex will derive therefrom. A more detailed discussion of the risks is available in the 'Annual Information Form' filed by Globex on A photo accompanying this announcement is available at in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

National Post
25-04-2025
- Business
- National Post
Lomiko Metals Inc. Warrants Re-Pricing Extension and Accelerated Provisions
Article content MONTREAL — Lomiko Metals Inc. (TSX.V: LMR) ('Lomiko Metals' or the 'Company') announces that further to its press release dated April 3, 2025, in order to reduce the exercise price of the warrants, the TSX Venture Exchange requires that the Company include an accelerated exercise period provision in the amended warrants. The accelerated exercise period provision will provide that, if the closing price of the Company's shares is $0.18 or higher for 10 consecutive trading days (the 'Premium Trading Days'), warrant holders will have 30 calendar days, commencing 7 calendar days after the last Premium Trading Day. The proposed amendments to the Warrants are subject to acceptance by the TSX Venture Exchange. Article content In addition, the Company will extend the early incentive program pursuant to which the Company will offer holders of the above-noted outstanding warrants the opportunity to exercise to May 15, 2025. Refer to the Company's press release dated April 3, 2025. Article content About Lomiko Metals Inc. Article content The Company holds mineral interests in its La Loutre graphite development in southern Quebec. The La Loutre project site is within the Kitigan Zibi Anishinabeg (KZA) First Nation's territory. The KZA First Nation is part of the Algonquin Nation, and the KZA traditional territory is situated within the Outaouais and Laurentides regions. Located 180 kilometers northwest of Montreal, the property consists of one large, continuous block with 76 mineral claims totaling 4,528 hectares (45.3 km2). Article content The Property is underlain by rocks from the Grenville Province of the Precambrian Canadian Shield. The Grenville was formed under conditions that were very favorable for the development of coarse-grained, flake-type graphite mineralization from organic-rich material during high-temperature metamorphism. Article content Lomiko Metals published an updated Mineral Resource Estimate (MRE) in a NI 43-101 Technical Report and Mineral Resource Estimate Update for the La Loutre Project, Quebec, Canada, prepared by InnovExplo on May 11th, 2023, which estimated 64.7 million tonnes of Indicated Mineral Resources averaging 4.59% Cg per tonne for 3.0 million tonnes of graphite, a tonnage increase of 184%. Indicated Mineral Resources increased by 41.5 million tonnes as a result of the 2022 drilling campaign, from 17.5 million tonnes in 2021 MRE with additional Mineral resources reported down-dip and within marble units resulted in the addition of 17.5 million tonnes of Inferred Mineral Resources averaging 3.51% Cg per tonne for 0.65 million tonnes of contained graphite; and the additional 13,107 metres of infill drilling in 79 holes completed in 2022 combined with the refinement of the deposit and structural models contributed to the addition of most of the Inferred Mineral Resources to the Indicated Mineral Resource category, relative to the 2021 Mineral Resource Estimate. The MRE assumes a US$1,098.07 per tonne graphite price and a cut-off grade of 1.50% Cg (graphitic carbon). The Company also holds interest in seven early-stage projects in southern Quebec, including Ruisseau, Tremblant, Meloche, Boyd, Dieppe, North Low and Carmin, covering 328 claims in total on 7 early-stage projects covering 18,622 hectares in the Laurentian region of Quebec and within KZA territory. Article content Article content The stage graphite portfolio consists of 328 claims in total on 7 early-stage projects covering 18,622 hectares in southern Quebec. Article content Ruisseau–grades up to 27.9 percent carbon graphite ('% Cg') from four distinct high grade mineralized zones that are over 3km long; Meloche –grades up to 13.3% Cg from two distinct mineralized clusters; Tremblant –grades up to 11.6% Cg from numerous, widespread spot anomalies; and Dieppe –grades up to 6.82% Cg from numerous, widespread spot anomalies and a distinct mineralized cluster. Boyd–8 samples grades range from 5.61% Cg to 17.10% Cg with all samples above 5.00% Cg Article content In addition to La Loutre, Lomiko has earned-in its 49% stake in the Bourier Project from Critical Elements Lithium Corporation as per the option agreement announced on April 27 th, 2021. The Bourier project site is located near Nemaska Lithium and Critical Elements south-east of the Eeyou Istchee James Bay territory in Quebec, which consists of 203 claims for a total ground position of 10,252.20 hectares (102.52 km2), in Canada's lithium triangle near the James Bay region of Quebec that has historically housed lithium deposits and mineralization trends. Article content The Yellow Fox Property is located approximately 10 km southwest of the Town of Glenwood NL, and south of the Trans-Canada Highway. The Property occurs within NTS map sheets 02D/14 and 15 with excellent access along several logging and skidder roads originating from Glenwood. The main Yellow Fox showing is located in the central part of License 027536M, 5km from the western end of Gander Lake. The property is centered at approximately UTM (NAD 27) grid coordinates 5,419,400m North and 645,300m East. Article content This property is on the same trend as the past-producing antimony mine Beaver Brook, which is located 25km southwest of the property. Yellow Fox is an early-stage exploration property prospective in antimony, gold, and silver where historic works returned samples anomalous in gold (Au), antimony (Sb), lead (Pb), zinc (Zn), and silver (Ag). The trenching exposed the rocks, resulting in grab samples to 59.43g/t Au, 11.10% Sb, 7.00% Zn, 72.90g/t Ag, and 5.50% Pb in arsenopyrite-stibnite veins within altered monzogranite. (See Metals Creek assessment report at