logo
#

Latest news with #OCPP

ELECQ Showcases Smart Energy Management System at Drive to Zero 2025
ELECQ Showcases Smart Energy Management System at Drive to Zero 2025

Yahoo

time6 days ago

  • Business
  • Yahoo

ELECQ Showcases Smart Energy Management System at Drive to Zero 2025

PARIS, June 04, 2025 (GLOBE NEWSWIRE) -- ELECQ is changing the game for EV charging in Europe. At Drive to Zero 2025, ELECQ introduced its all-in-one home energy management system — combining intelligent charging, solar integration, and dynamic load Charging Infrastructure for Dynamic Energy Needs Installing a powerful EV charger can strain older electrical panels or require expensive upgrades. ELECQ addresses this challenge with an integrated system comprising the Type 2 Home Charger, Power Monitor, and ELECQ App — forming a smart solution that adapts in real time to household energy conditions. Full Control & Smart Load Management The ELECQ Type 2 Home Charger delivers up to 22 kW of AC charging with safety, intelligence, and efficiency. Through the ELECQ App, homeowners can: Schedule charging during off-peak hours View cost breakdowns per session Export reports and receive OTA firmware updates Monitor solar vs. grid energy use ELECQ's intelligent load management ensures safe and efficient charging on both single-home and multi-charger setups. At the household level, the Power Monitor tracks real-time energy usage and wirelessly communicates with the charger via Wi-SUN. The charger then adjusts output dynamically to prevent overloads — enabling full-speed charging without upgrading the electrical panel. For multi-EV households, Dynamic Load Balancing (DLB) make intelligently distributing power across up to 30 chargers without additional equipment. This prevents grid overload, optimizes power use, and maximizes system efficiency. Solar Charging Modes ELECQ supports three charging solar charging modes — Only Solar, Solar Priority, and Unlimited. With real-time coordination between solar, battery, and EV load via the Power Monitor, the system dynamically adjusts charging. Smart phase-switching ensures optimal solar utilization even during low generation. OCPP — and Future-Proof ELECQ chargers support direct OCPP integration and are already connected to major platforms like Last Mile Solutions, CLENERGY EV and SINTIO. The system supports: OCPP 1.6J OCPP 2.0.1 Future-ready OTA upgrade to OCPP 2.1 With dual-channel architecture (Direct OCPP + ELECQ Service Protocol), it guarantees broad compatibility with both open platforms and proprietary Residential: Expanding ELECQ Ecosystem ELECQ is scaling its solution beyond residential charging. The commercial lineup includes: ELECQ Ready (pre-wired installation kits) ELECQ Biz (for businesses and fleets) ELECQ Station 60 — compact 60 kW DC fast charger with dual-port output, real-time load balancing, and stepless current control for optimized uptime. The comprehensive ELECQ software suite ensure cloud connectivity: ELECQ App (for users) ELECQ Partner App (for installers) ELECQ Cloud (for remote diagnostics, OTA, and energy analytics) Built for Europe, Ready for Partnership ELECQ is certified for the European market by TÜV Rheinland with CE, CB, and RED, and tested for RoHS, REACH, and WEEE compliance. Whether you're a homeowner, installer, or energy platform, ELECQ makes smart energy effortless. Visit us at Pavilion 5.3, Booth A22, Paris Expo Porte de Versailles. Stay Connected: Follow ELECQ on LinkedIn Become a Partner: COMPANY: ELECQEMAIL: sales@ WEB: Photos accompanying this announcement are available athttps:// in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

ELECQ Showcases Smart Energy Management System at Drive to Zero 2025
ELECQ Showcases Smart Energy Management System at Drive to Zero 2025

Yahoo

time6 days ago

  • Business
  • Yahoo

ELECQ Showcases Smart Energy Management System at Drive to Zero 2025

PARIS, June 04, 2025 (GLOBE NEWSWIRE) -- ELECQ is changing the game for EV charging in Europe. At Drive to Zero 2025, ELECQ introduced its all-in-one home energy management system — combining intelligent charging, solar integration, and dynamic load Charging Infrastructure for Dynamic Energy Needs Installing a powerful EV charger can strain older electrical panels or require expensive upgrades. ELECQ addresses this challenge with an integrated system comprising the Type 2 Home Charger, Power Monitor, and ELECQ App — forming a smart solution that adapts in real time to household energy conditions. Full Control & Smart Load Management The ELECQ Type 2 Home Charger delivers up to 22 kW of AC charging with safety, intelligence, and efficiency. Through the ELECQ App, homeowners can: Schedule charging during off-peak hours View cost breakdowns per session Export reports and receive OTA firmware updates Monitor solar vs. grid energy use ELECQ's intelligent load management ensures safe and efficient charging on both single-home and multi-charger setups. At the household level, the Power Monitor tracks real-time energy usage and wirelessly communicates with the charger via Wi-SUN. The charger then adjusts output dynamically to prevent overloads — enabling full-speed charging without upgrading the electrical panel. For multi-EV households, Dynamic Load Balancing (DLB) make intelligently distributing power across up to 30 chargers without additional equipment. This prevents grid overload, optimizes power use, and maximizes system efficiency. Solar Charging Modes ELECQ supports three charging solar charging modes — Only Solar, Solar Priority, and Unlimited. With real-time coordination between solar, battery, and EV load via the Power Monitor, the system dynamically adjusts charging. Smart phase-switching ensures optimal solar utilization even during low generation. OCPP — and Future-Proof ELECQ chargers support direct OCPP integration and are already connected to major platforms like Last Mile Solutions, CLENERGY EV and SINTIO. The system supports: OCPP 1.6J OCPP 2.0.1 Future-ready OTA upgrade to OCPP 2.1 With dual-channel architecture (Direct OCPP + ELECQ Service Protocol), it guarantees broad compatibility with both open platforms and proprietary Residential: Expanding ELECQ Ecosystem ELECQ is scaling its solution beyond residential charging. The commercial lineup includes: ELECQ Ready (pre-wired installation kits) ELECQ Biz (for businesses and fleets) ELECQ Station 60 — compact 60 kW DC fast charger with dual-port output, real-time load balancing, and stepless current control for optimized uptime. The comprehensive ELECQ software suite ensure cloud connectivity: ELECQ App (for users) ELECQ Partner App (for installers) ELECQ Cloud (for remote diagnostics, OTA, and energy analytics) Built for Europe, Ready for Partnership ELECQ is certified for the European market by TÜV Rheinland with CE, CB, and RED, and tested for RoHS, REACH, and WEEE compliance. Whether you're a homeowner, installer, or energy platform, ELECQ makes smart energy effortless. Visit us at Pavilion 5.3, Booth A22, Paris Expo Porte de Versailles. Stay Connected: Follow ELECQ on LinkedIn Become a Partner: COMPANY: ELECQEMAIL: sales@ WEB: Photos accompanying this announcement are available athttps:// in to access your portfolio

Topband's "Cloud-PV-ESS-Charger" Solutions Shine at The Smarter E Europe 2025 in Munich, Innovative Technologies Driving Transformation in the Energy Sector
Topband's "Cloud-PV-ESS-Charger" Solutions Shine at The Smarter E Europe 2025 in Munich, Innovative Technologies Driving Transformation in the Energy Sector

Korea Herald

time10-05-2025

  • Automotive
  • Korea Herald

Topband's "Cloud-PV-ESS-Charger" Solutions Shine at The Smarter E Europe 2025 in Munich, Innovative Technologies Driving Transformation in the Energy Sector

MUNICH, May 10, 2025 /PRNewswire/ -- The highly anticipated The Smarter E Europe exhibition concluded on May 9 in Munich, Germany. Topband ( made a compelling appearance with its integrated "Cloud-PV-ESS-Charger" solution. With its cutting-edge technologies and system-level innovation capabilities, Topband attracted extensive engagement from industry experts and partners, underscoring its core competitiveness and market appeal in the digital energy sector. The presence further affirmed Topband's long-term commitment to green energy and its accelerating global expansion strategy. An End-to-End Product Ecosystem for a Smart, Safe, and Worry-Free Energy Experience As an innovative leader in digital energy, Topband relies on its core technology system of "1 Cell1Cloud 3S(Cells, Cloud Platform, BMS,EMS, PCS)", enabling a fully integrated ecosystem that spans cloud services, PV, energy storage, and EV charging system. Topband serves diverse application scenarios including outdoor portable applications, residential energy and C&I energy. Topband is consistently dedicated to developing safe, intelligent, and hassle-free one-stop energy solutions, driving the large-scale adoption of green energy, and genuinely bringing smart energy into every user. At this exhibition, Topband unveiled its latest liquid-cooled all-in-one C&I energy storage system, powered by high-performance 314Ah lithium iron phosphate (LFP) cells. With high energy density and long cycle life, the system delivers up to 90% charging efficiency and supports parallel expansion. Optimized for peak shaving, dynamic capacity enhancement, and PV consumption, it offers exceptional energy efficiency and delivers the lowest levelized cost of storage (LCOE) for commercial and industrial users. For EV charging system, Topband showcased its 60kW DC fast charger, supporting dual-vehicle charging with real-time dynamic power distribution. Engineered for outdoor reliability with IP54 protection and an operating range of -20°C to 50°C, it ensures stable performance in various conditions. With OCPP protocol support for seamless cloud integration, it helps urban commercial hubs upgrade their energy services and delivers a smarter, more convenient green mobility experience. Partnering with SAX Power to Build a Smarter, Low-Carbon Energy Future During the event, Topband signed a strategic partnership agreement with SAX Power, marking a new chapter in renewable energy collaboration. As a key technology partner of the German railway system, SAX Power brings deep expertise in high-voltage traction networks and lithium-ion energy storage systems. This partnership will integrate Topband's strengths in "four electrics and one network", energy storage products, R&D capabilities, and global supply chain with SAX Power's robust localization capabilities and influence in the European market. Looking ahead, Topband and SAX Power will join forces to expand internationally, delivering advanced energy solutions to customers across Europe and around the world. Topband looks forward to creating long-term value alongside SAX Power and driving the transformation toward a smart, low-carbon energy future. Amid the global energy transition, Topband will continue to build on its strong technological foundation and empower global customers with more efficient and intelligent energy solutions—contributing to a greener, more sustainable world.

Topband and Ecosolex Make Debut at Solartech Indonesia 2025: Full-Stack Innovation Powers a New Energy Future in Southeast Asia
Topband and Ecosolex Make Debut at Solartech Indonesia 2025: Full-Stack Innovation Powers a New Energy Future in Southeast Asia

Korea Herald

time25-04-2025

  • Business
  • Korea Herald

Topband and Ecosolex Make Debut at Solartech Indonesia 2025: Full-Stack Innovation Powers a New Energy Future in Southeast Asia

JAKARTA, Indonesia, April 25, 2025 /PRNewswire/ -- Topband Co., Ltd. (Stock Code: together with its sub-brand Ecosolex, made a high-profile debut at Solartech Indonesia 2025, one of Southeast Asia's largest and most influential renewable energy exhibitions. Under the theme "Full-Stack Innovation for a Smarter Energy Future," Topband showcased its comprehensive energy solutions designed for both residential and commercial-industrial applications. As a key platform in Southeast Asia's energy transition, the exhibition drew widespread attention from global energy companies, government agencies, and industry experts. Backed by its robust capabilities in energy storage, Topband presented its signature "One Core, One Cloud, 3S" full-stack technology ecosystem—including self-developed battery cells, BMS, PCS, EMS, and a proprietary cloud platform. From cell to complete system, this vertically integrated approach demonstrated Topband's end-to-end innovation capabilities. Combined with its ongoing localization strategy, the company quickly became a focal point at the event, securing multiple partnership intentions and underscoring its leadership in the new energy sector. Full-Stack Technology for High-Value Energy Scenarios At the exhibition, Topband emphasized its vertically integrated "component-to-system" development path by unveiling a series of tailored solutions for diverse use cases across the residential and commercial-industrial segments. Designed with the high heat, humidity, and grid instability of Southeast Asia in mind, Topband introduced its 215kWh and 100kWh C&I liquid-cooled energy storage cabinets. These systems, equipped with high-performance battery cells and advanced fire safety mechanisms, are well-suited for factories, shopping centers, hotels, and industrial parks—offering stable, 24/7 power supply. Topband also showcased its 50kW and 100kW three-phase PV inverters, which deliver peak conversion efficiencies of up to 98.6%. These units are optimized for compatibility with a variety of PV modules and grid characteristics specific to Indonesia, enabling users to significantly reduce levelized cost of electricity (LCOE). In the EV charging segment, Topband introduced its 60kW DC fast-charging solution, supporting dual-vehicle charging and real-time dynamic power allocation. With IP54 protection and an operating temperature range from -20°C to 50°C, it is engineered for outdoor reliability. OCPP protocol support allows seamless integration with customer cloud platforms, providing an efficient energy replenishment solution for electric commercial fleets and public charging infrastructure. Localized Innovation to Support Indonesia's Energy Transition During the concurrent high-level forum, Riko Sugiyanto, Country Manager of Topband Indonesia, delivered a keynote titled "Trends in Energy Storage Battery Technology and Applications in Southeast Asia." He emphasized the importance of safety and efficiency in storage systems, especially under Indonesia's unique climate and geographical conditions. Riko highlighted Topband's commitment to understanding the practical needs of local C&I energy users and offering adaptable solutions, such as modular system design, to respond rapidly to real project demands. Drawing on years of global market experience and a responsive customer service framework, Topband is rapidly building a localized service and support network across Indonesia. This includes technical assistance, operations, and maintenance—ensuring quick response times and reliable aftersales care. These initiatives are in strong alignment with Indonesia's national sustainability goals, including its "Net Zero Emission by 2060" commitment and the "Program Kepulauan Surya"("Solar Archipelago")development vision. With its full-stack R&D capabilities and deep adaptation to local market needs, Topband is taking firm steps to participate in the transformation of Southeast Asia's energy landscape. The company is playing a key role in accelerating the region's transition to clean power—injecting long-term momentum into global sustainable energy development.

Head of Oregon ‘think tank' on continuing fight for ‘economic justice'
Head of Oregon ‘think tank' on continuing fight for ‘economic justice'

Yahoo

time20-04-2025

  • Business
  • Yahoo

Head of Oregon ‘think tank' on continuing fight for ‘economic justice'

PORTLAND, Ore. (KOIN) — When we hear the term 'think tank,' we normally think of the big public policy research institutes that you might find on K Street in Washington D.C. But D.C. isn't the only place you'll find think tanks. We have several in Oregon, including the Oregon Center for Public Policy (OCPP). The OCPP, which is celebrating 25 years as an organization, bills itself as being in 'the fight for economic justice for all Oregonians.' Alejandro Queral, the Executive Director of OCPP, joined Eye on Northwest Politics to discuss their goals to have an economic system that works for everyone, as well as potential impacts to the state of Oregon after the recent passage of the federal congressional budget. Watch the full interview in the video above. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store