logo
#

Latest news with #metallurgy

Solitario Resources Announces Favorable Golden Crest Metallurgical Results
Solitario Resources Announces Favorable Golden Crest Metallurgical Results

Associated Press

time19-05-2025

  • Business
  • Associated Press

Solitario Resources Announces Favorable Golden Crest Metallurgical Results

Drilling Expected to Start May 27, 2025 DENVER, CO / ACCESS Newswire / May 19, 2025 / Solitario Resources Corp. ('Solitario') (NYSE American:XPL)(TSX:SLR) is pleased to announce that it has received favorable metallurgical gold recovery test results for its Golden Crest project in South Dakota. Bottle roll metallurgical testing was conducted on twenty mineralized intervals from 2024 drilling. Average gold recoveries were approximately 69% for nine core samples from drill hole GC-003 and 66% for nine samples from hole GC-008. Importantly, mineralized intervals in both drill holes were all well oxidized, with oxidation extending below 362 meters in GC-008, the limit of drilling for that hole. Highlights from core holes GC-003 and GC-008 include: *All gold assay values were reported in previous news releases; Gold values in parts per billion; 1,000 parts per billion = 1.0 gram per tonne Chris Herald, President and CEO of Solitario, stated: 'This initial metallurgical test work is very encouraging. The gold we intersected in the upper limestone rocks and the deeper lower Deadwood formation is very amenable to standard industry extraction methods. We can confidently move forward with our 2025 drilling program knowing that the mineralization we have identified to date appears to be metallurgically similar to the nearby Wharf-Homestake gold district.' GC-003 and GC-008 are considered the most important mineralization intersected in the 2024 drilling program. Bottle roll tests of this type are often considered the minimum recovered values for gold due to the weak strength of the solution and the limited amount of leaching time of just 48 hours. One sample each from holes GC-010 and GC-011 were also tested and displayed lower recoveries of less than 31%. These samples are considered mineralogical outliers compared to all other mineralized intersections in the 2024 drilling program. 2025 Drilling Set to Start May 27 Drilling is scheduled to begin on May 27, 2025. This year's drilling program will occur in two phases. Phase 1 consists of offset drilling of mineralization discovered in the 2024 drilling campaign and new untested targets within the approved Golden Crest Plan of Operations. Phase 2 drilling will be conducted within the Ponderosa Plan of Operations, pending permit approvals. We anticipate two rigs will be operating concurrently towards the end of summer and into fall. Abundance of High-Quality Drilling Targets Solitario has identified ten high-priority surface targets (including both the Golden Crest area and the currently undrilled Ponderosa area) as shown in the table below. Two Golden Crest targets, Downpour and Eleventh Hour, were drilled last year. Five new targets are currently being permitted and are scheduled to be drilled in 2025. The other three high-priority targets may undergo future permitting following further review. In addition to the ten currently defined high-priority targets, Solitario has identified another dozen promising target areas that require additional early-stage surface exploration work. Solitario's future drilling will test both strong surface gold anomalies as well as the underlying and highly prolific replacement deposits of the Lower Deadwood Formation, paleo-placer mineralization at the lower contact of the Deadwood and the older Precambrian Homestake banded iron formation, all prolific geologic producers in the greater historic Homestake mining district. Solitario's 100%-owned Golden Crest properties in South Dakota constitute strategic land holdings along the western and southwestern extensions of the Homestake-Wharf mining district that has produced approximately 52 million ounces of gold and contains another 35 million ounces in resources and historical resources (not SK-1300 or NI43-101 compliant and not located on Solitario's property). The project area is in a safe jurisdiction with highly developed infrastructure, an unbroken 150-year record of continuous gold mining, a skilled mining workforce, and a history of high-grade, underground mineable gold deposits. Bottle Roll Testing Methodology, Chain of Custody, Quality Control and Assurance All Golden Crest core and bottle roll samples have been prepared and analyzed at the American Assay Laboratories in Reno, Nevada, which is independent from Solitario. Core sample preparation, QA/QC protocols and the gold assay results in this release have been detailed in previous news releases. New bottle roll testing results reported in this release consisted of samples that were originally prepped by jaw crushing, then roll crushing to >70% -2mm. A ~1kg split was taken from reject using a Jones Riffle. The split was pulverized to >85% -75 μ in a puck and bowl mill. This 1kg sample was bottle rolled for 48 hours in 2L of 0.3% NaCN / 0.3% NaOH solution. A 50mL aliquot was decanted and centrifuged for analysis by ICP-OES. Qualified Person The scientific and technical information contained in this news release has been reviewed and approved by Walter Hunt, who is a qualified person as defined by NI 43-101, Standards of Disclosure for Mineral Projects. About Solitario Solitario is a natural resource exploration company focused on high-quality Tier-1 gold and zinc exploration projects. The Company is traded on the NYSE American ('XPL') and on the Toronto Stock Exchange ('SLR'). In addition to its South Dakota property holdings, Solitario holds a 50% joint venture interest (Teck Resources 50%) in the high-grade Lik zinc deposit in Alaska and a 39% joint-venture interest (Nexa Resources 61%) in the high-grade Florida Canyon zinc project in Peru. At Florida Canyon, Solitario is carried to production through its joint-venture arrangement with Nexa. Solitario's Management and Directors hold approximately 9.2% (excluding options) of the Company's 82.8 million shares outstanding. Solitario's cash balance and marketable securities stand at approximately US$5.4 million. Additional information about Solitario is available online at Solitario has a long history of committed Environmental, Social and Responsible Governance ('ESG') of its business. We realize ESG issues are also important to investors, employees, and all stakeholders, including communities in which we work. We are committed to conducting our business in a manner that supports positive environmental and social initiatives and responsible corporate governance. Importantly, we work with joint-venture partners that not only value the importance of ESG issues in the conduct of their business on our joint-venture projects, but are leaders in the industry in this important segment of our business. For More Information Please Contact: Chris Herald, President and CEO Solitario Resources Corp. Tel. 303-534-1030 ext. 1 Cautionary Statement Regarding Forward Looking Information This press release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933 and the U.S. Securities Exchange Act of 1934, and as defined in the United States Private Securities Litigation Reform Act of 1995 (and the equivalent under Canadian securities laws),that are intended to be covered by the safe harbor created by such sections. Forward-looking statements are statements that are not historical facts. They are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and address activities, events or developments that Solitario expects or anticipates will or may occur in the future, and are based on current expectations and assumptions. Forward-looking statements involve numerous risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Solitario's Golden Crest land position does not cover any of the areas of historical gold production or historical unmined resources. Certain historical information concerning exploration and gold production in the Black Hills region has been obtained through both public and private sources and are believed to be substantially factual, but Solitario can give no assurances of the accuracy of such information. The existence of historic mines and resources adjacent to Solitario's land position do not necessarily support the existence of economic mineral deposits on Solitario's land position. Such forward-looking statements include, without limitation, statements regarding the Company's expectation of the projected timing and outcome of engineering studies; expectations regarding the receipt of all necessary permits and approvals to implement an exploration or mining plan, if any, at any of its mineral properties. Important factors that could cause actual results to differ materially from those in the forward-looking statements include, among others, risks relating to risks that Solitario's and its joint venture partners' exploration and property advancement efforts will not be successful; risks relating to fluctuations in the price of zinc, gold, lead and silver; the inherently hazardous nature of mining-related activities; uncertainties concerning reserve and resource estimates; availability of outside contractors, and other activities; uncertainties relating to obtaining approvals and permits from governmental regulatory authorities; the possibility that environmental laws and regulations will change over time and become even more restrictive; and availability and timing of capital for financing the Company's exploration and development activities, including uncertainty of being able to raise capital on favorable terms or at all;as well as those factors discussed in Solitario's filings with the U.S. Securities and Exchange Commission (the 'SEC') including Solitario's latest Annual Report on Form 10-K and its other SEC filings (and Canadian filings) including, without limitation, its latest Quarterly Report on Form 10-Q. The Company does not intend to publicly update any forward-looking statements, whether as a result of new information, future events, or otherwise, except as may be required under applicable securities laws. SOURCE: Solitario Resources Corp. press release

P2 Gold Announces Management, Metallurgical Testwork Updates
P2 Gold Announces Management, Metallurgical Testwork Updates

Globe and Mail

time12-05-2025

  • Business
  • Globe and Mail

P2 Gold Announces Management, Metallurgical Testwork Updates

VANCOUVER, BC , /CNW/ - P2 Gold Inc. ("P2" or the "Company") (TSX-V:PGLD) (OTCQB:PGLDF) reports that its management team has been retained to augment the leadership at Tudor Gold Corp. ("Tudor Gold") and; ongoing metallurgical testwork from a sample collected and assayed from the Sullivan Zone at its wholly-owned, gold-copper Gabbs Project has demonstrated an increase in copper and gold recoveries. P2's senior management team has been retained by Tudor Gold in support of the advance their flagship gold-copper Treaty Creek Project located roughly 10 kilometers north of the Brucejack Mine in British Columbia's Golden Triangle. P2's wholly-owned Gabbs Project in Nevada will continue to be advanced as planned, with senior management and Board owning 23% of the Company's issued and outstanding shares. Members of P2's team were instrumental in the discovery, permitting, construction, and operation of the Brucejack Mine while at Pretium Resources Inc. and have the capacity and capability of driving the Treaty Creek Project and Gabbs Project forward concurrently. 2025 Metallurgical Testwork The Phase Three Metallurgical Program underway at Gabbs is focused on increasing copper, silver and gold recoveries of the oxide mineralization and providing a marketing sample of the copper-silver SART (sulphidization, acidification, recycling and thickening) concentrate. Results to date indicate far superior kinetics to prior test work, with recoveries for gold, silver and copper exceeding recoveries of prior test work at this stage of the program. The Phase Three Metallurgical Program is expected to be completed early in the third quarter of this year. The Company has retained Kappes, Cassiday & Associates ("KCA") in Reno, Nevada to carry out the Phase Three Metallurgical Program. As reported on April 3, 2025 , a 338-kilogram panel sample (the "Panel Sample"), measuring approximately 1 meter by 30 meters, was collected across the exposed oxide mineralization in a 10-meter-deep historic excavation at the Sullivan Zone at Gabbs. In addition, the remaining low, medium, and high-grade samples from drill core used in the previous metallurgical programs were composited into one sample (the "Composited Sample"). The Phase Three Metallurgical Program consists of leach testing approximately 150 kilograms of the Panel Sample in a 20-centimeter diameter column and approximately 20 kilograms of the Composited Sample in a 10-centimeter column. (See news release dated April 3, 2025 .) Preliminary Economic Assessment Economics at Spot Prices Using existing recoveries (78% for oxide gold mineralization and 54% for oxide copper mineralization) Gabbs has an internal rate of return of 54.9% and net present value at a 5% discount rate of over US$1.6 billion at May 9, 2025 spot metal prices of $3,335 gold, $32.67 silver and $4.30 copper. ( See the Company's preliminary economic assessment announced on May 22, 2024 and described in the Gabbs Technical Report dated May 17, 2024 available under the Company's profile on SEDAR+ at ) Qualified Person Ken McNaughton , Chief Exploration Officer, P2 Gold, is the Qualified Person, as defined by National Instrument 43-101, responsible for the Gabbs Project. Mr. McNaughton has reviewed, verified, and approved the scientific and technical information in this news release. About P2 Gold Inc. P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada. A positive preliminary economic assessment has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces gold and 13,500 tonnes copper over a 14.2-year mine life. The Gabbs Project has excellent infrastructure with access via paved Hwy 361, and power and water on site. Additional metallurgical testing is underway, and a water permit is expected in the second quarter of this year. All zones on the property remain open and additional exploration targets, near surface and at depth, are drill ready. Neither the TSX Venture Exchange (the "Exchange") nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release. Forward Looking Information This press release contains "forward-looking information" within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking information" includes statements that use forward-looking terminology such as "may", "will", "expect", "anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or comparable terminology. Such forward-looking information includes, without limitation, information with respect to the Company's expectations, strategies and plans for its Gabbs Project including the Company's planned expenditures and exploration activities. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made, including without limitation, the estimated internal rate of return and net present value at a 5% discount rate of the Gabbs Project, as well as the other assumptions disclosed in this news release. Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking information, including without limitation, the estimates and assumptions contained in the Gabbs Technical Report dated May 17, 2024 , and risks associated with mineral exploration, including the risk that actual results and timing of exploration and development will be different from those expected by management. See "Risk Factors" in the Company's annual information form for the year ended December 31, 2024 , dated March 21, 2025 filed on SEDAR+ at for a discussion of these risks. The Company cautions that there can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, investors should not place undue reliance on forward-looking information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to forward-looking information contained in this press release to reflect events or circumstances after the date hereof.

P2 Gold Announces Management, Metallurgical Testwork Updates
P2 Gold Announces Management, Metallurgical Testwork Updates

Yahoo

time12-05-2025

  • Business
  • Yahoo

P2 Gold Announces Management, Metallurgical Testwork Updates

VANCOUVER, BC, May 12, 2025 /CNW/ - P2 Gold Inc. ("P2" or the "Company") (TSX-V:PGLD) (OTCQB:PGLDF) reports that its management team has been retained to augment the leadership at Tudor Gold Corp. ("Tudor Gold") and; ongoing metallurgical testwork from a sample collected and assayed from the Sullivan Zone at its wholly-owned, gold-copper Gabbs Project has demonstrated an increase in copper and gold recoveries. Management Update P2's senior management team has been retained by Tudor Gold in support of the advance their flagship gold-copper Treaty Creek Project located roughly 10 kilometers north of the Brucejack Mine in British Columbia's Golden Triangle. P2's wholly-owned Gabbs Project in Nevada will continue to be advanced as planned, with senior management and Board owning 23% of the Company's issued and outstanding shares. Members of P2's team were instrumental in the discovery, permitting, construction, and operation of the Brucejack Mine while at Pretium Resources Inc. and have the capacity and capability of driving the Treaty Creek Project and Gabbs Project forward concurrently. 2025 Metallurgical Testwork The Phase Three Metallurgical Program underway at Gabbs is focused on increasing copper, silver and gold recoveries of the oxide mineralization and providing a marketing sample of the copper-silver SART (sulphidization, acidification, recycling and thickening) concentrate. Results to date indicate far superior kinetics to prior test work, with recoveries for gold, silver and copper exceeding recoveries of prior test work at this stage of the program. The Phase Three Metallurgical Program is expected to be completed early in the third quarter of this year. The Company has retained Kappes, Cassiday & Associates ("KCA") in Reno, Nevada to carry out the Phase Three Metallurgical Program. As reported on April 3, 2025, a 338-kilogram panel sample (the "Panel Sample"), measuring approximately 1 meter by 30 meters, was collected across the exposed oxide mineralization in a 10-meter-deep historic excavation at the Sullivan Zone at Gabbs. In addition, the remaining low, medium, and high-grade samples from drill core used in the previous metallurgical programs were composited into one sample (the "Composited Sample"). The Phase Three Metallurgical Program consists of leach testing approximately 150 kilograms of the Panel Sample in a 20-centimeter diameter column and approximately 20 kilograms of the Composited Sample in a 10-centimeter column. (See news release dated April 3, 2025.) Preliminary Economic Assessment Economics at Spot Prices Using existing recoveries (78% for oxide gold mineralization and 54% for oxide copper mineralization) Gabbs has an internal rate of return of 54.9% and net present value at a 5% discount rate of over US$1.6 billion at May 9, 2025 spot metal prices of $3,335 gold, $32.67 silver and $4.30 copper. (See the Company's preliminary economic assessment announced on May 22, 2024 and described in the Gabbs Technical Report dated May 17, 2024 available under the Company's profile on SEDAR+ at Qualified Person Ken McNaughton, Chief Exploration Officer, P2 Gold, is the Qualified Person, as defined by National Instrument 43-101, responsible for the Gabbs Project. Mr. McNaughton has reviewed, verified, and approved the scientific and technical information in this news release. About P2 Gold Inc. P2 Gold is a mineral exploration and development company focused on advancing its gold-copper Gabbs Project on the Walker Lane Trend in Nevada. A positive preliminary economic assessment has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces gold and 13,500 tonnes copper over a 14.2-year mine life. The Gabbs Project has excellent infrastructure with access via paved Hwy 361, and power and water on site. Additional metallurgical testing is underway, and a water permit is expected in the second quarter of this year. All zones on the property remain open and additional exploration targets, near surface and at depth, are drill ready. Neither the TSX Venture Exchange (the "Exchange") nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release. Forward Looking Information This press release contains "forward-looking information" within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking information" includes statements that use forward-looking terminology such as "may", "will", "expect", "anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or comparable terminology. Such forward-looking information includes, without limitation, information with respect to the Company's expectations, strategies and plans for its Gabbs Project including the Company's planned expenditures and exploration activities. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made, including without limitation, the estimated internal rate of return and net present value at a 5% discount rate of the Gabbs Project, as well as the other assumptions disclosed in this news release. Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking information, including without limitation, the estimates and assumptions contained in the Gabbs Technical Report dated May 17, 2024, and risks associated with mineral exploration, including the risk that actual results and timing of exploration and development will be different from those expected by management. See "Risk Factors" in the Company's annual information form for the year ended December 31, 2024, dated March 21, 2025 filed on SEDAR+ at for a discussion of these risks. The Company cautions that there can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, investors should not place undue reliance on forward-looking information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to forward-looking information contained in this press release to reflect events or circumstances after the date hereof. SOURCE P2 Gold Inc. View original content to download multimedia: Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store