logo
#

Latest news with #trafficimprovement

Dubai traffic solution: New project to increase road capacity by 5,000 cars per hour
Dubai traffic solution: New project to increase road capacity by 5,000 cars per hour

Gulf Business

time2 days ago

  • Business
  • Gulf Business

Dubai traffic solution: New project to increase road capacity by 5,000 cars per hour

Dubai's Roads and Transport Authority (RTA) is set to open a new entry and exit point to Al Warqa directly from Sheikh Mohammed Bin Zayed Road early next week (early June), aiming to facilitate smoother access to and from the neighbourhood. Read: Once complete, the project will increase road capacity by 5,000 vehicles per hour, reduce travel time by 80 per cent—from 20 minutes to just 3.5 minutes—and shorten trip distances from 5.7 kilometres to 1.5 kilometres, Traffic improvement works RTA has also completed traffic improvement works on Street 13 in Al Warqa 1 to serve residents and school goers. These enhancements are part of a broader internal road development project spanning approximately 8 kilometres, designed to improve traffic flow and enhance the efficiency of the local road network, ultimately boosting daily mobility and residents' quality of life. RTA reaffirms its commitment to developing an integrated infrastructure network—encompassing roads, lighting, and stormwater drainage systems—within residential areas. This initiative aligns with Dubai's urban and population growth goals and reflects RTA's dedication to creating a modern urban environment that supports sustainable mobility, enhances quality of life, and ensures residents' comfort and well-being. These efforts are in line with Dubai's vision of becoming a smart, prosperous city that meets residents' evolving needs. Internal road networks Development projects in Al Warqa also include upgrades to internal road networks in Al Warqa 3 and 4. These works involve road paving, construction of pedestrian walkways, pavements, and parking spaces, along with the implementation of cycling tracks exceeding 23 kilometres in total. The goal is to enhance connectivity with neighbouring cycle tracks and promote sustainable, alternative modes of transport. The next phase will include capacity upgrades in Al Warqa 1, converting existing roundabouts into signalised junctions with smart traffic lights. These enhancements are expected to improve traffic flow by up to 30 per cent and are scheduled for completion by the end of this year. RTA has also carried out a series of internal road development works in Al Warqa, including traffic enhancements near the School of Research Science in Al Warqa 4 and GEMS Royal Dubai School. This included building 150 additional parking spaces and providing secure entry and exit points for the new parking areas. These measures have helped reduce congestion and cut delays in the school zone by approximately 35 per cent to 50 per cent. RTA also completed internal roads supporting the Mohammed Bin Rashid Housing Establishment project in Al Warqa 4, which comprises 136 residential villas. The works included pedestrian walkways, pavements, vehicle access points, and a fully integrated lighting system, all aimed at improving road safety and mobility. A 7.4-kilometre cycling track was also constructed to encourage recreational cycling and support first-and-last-mile transport. Interactive session with residents Earlier, RTA held an interactive session with residents and frequent visitors to Al Warqa to highlight key initiatives and development projects in the district. The session also served as a platform for the public to share feedback and observations on infrastructure and the road network. This approach underscores RTA's commitment to listening to the community, addressing their suggestions, and implementing practical solutions. The engagement session was a key milestone, helping shape a series of development initiatives that translated into tangible improvements—directly enhancing traffic flow and addressing both current and future community needs.

Dubai RTA to open new entry, exit point to Al Warqa
Dubai RTA to open new entry, exit point to Al Warqa

Trade Arabia

time3 days ago

  • Business
  • Trade Arabia

Dubai RTA to open new entry, exit point to Al Warqa

Dubai's Roads and Transport Authority (RTA) is set to open a new entry and exit point to Al Warqa directly from Sheikh Mohammed Bin Zayed Road early next week (start of June), aiming to facilitate smoother access to and from the neighbourhood. Once complete, the project will increase road capacity by 5,000 vehicles per hour, reduce travel time by 80% - from 20 minutes to just 3.5 minutes - and cut trip distances from 5.7 km to 1.5 km. RTA has also completed traffic improvement works on Street 13 in Al Warqa 1 to serve residents and schoolgoers. These enhancements form part of a broader internal road development project spanning approximately 8 km, designed to improve traffic flow and enhance the efficiency of the local road network, ultimately boosting daily mobility and residents' quality of life. RTA reaffirms its commitment to developing an integrated infrastructure network—encompassing roads, lighting, and stormwater drainage systems—within residential areas, in line with Dubai's urban and population growth objectives. This reflects RTA's dedication to meeting residents' aspirations for a modern urban environment that enhances quality of life, supports sustainable mobility solutions, and ensures the highest standards of comfort and well-being. These efforts align with Dubai's vision of becoming a smart, prosperous city that meets the evolving needs of its residents while ensuring their happiness and stability. Development projects in Al Warqa also include upgrades to the internal road networks in Al Warqa 3 and 4. These works involve road paving, the construction of pedestrian walkways, pavements, and parking spaces, along with the implementation of cycling tracks exceeding 23 km in total length. The goal is to enhance connectivity with neighbouring cycle tracks and promote alternative, sustainable modes of transport. According to RTA, the next phase will include capacity enhancements in Al Warqa 1, involving the conversion of existing roundabouts into signalised junctions with smart traffic lights. This is expected to improve traffic flow by up to 30%. These improvements are scheduled for completion by the end of this year, as per the project timeline. Recently, RTA carried out a series of internal road development works in Al Warqa, including traffic enhancements around the School of Research Science in Al Warqa 4 and near GEMS Royal Dubai School. This included the construction of 150 additional parking spaces and the provision of secured entry and exit points for the new parking areas. These measures have contributed to easing congestion and reducing delay times in the school zone by approximately 35% to 50%, it stated. RTA also completed internal roads supporting the Mohammed Bin Rashid Housing Establishment project in Al Warqa 4, which comprises 136 residential villas. The works included pedestrian walkways, pavements, vehicle access points, and a fully integrated lighting system, all aimed at enhancing road safety and improving mobility for residents. In support of sustainable transport, a 7.4 km cycling track was also constructed to encourage cycling for both recreation and as a viable first-and-last-mile transport option. Earlier, RTA held an interactive session with residents and frequent visitors of Al Warqa to highlight key initiatives and development projects in the district. The session also served as a platform for the public to share feedback and observations on infrastructure and the road network. This approach demonstrates RTA's commitment to listening to community voices, addressing their suggestions, and transforming them into practical solutions. The customer engagement session with Al Warqa residents was a key milestone that helped shape a series of development initiatives and projects. These were translated into tangible improvements on the ground, directly enhancing traffic flow and addressing both current and future community needs.

New Dubai road to cut journey times from 20 minutes to just 3.5
New Dubai road to cut journey times from 20 minutes to just 3.5

Arabian Business

time3 days ago

  • Business
  • Arabian Business

New Dubai road to cut journey times from 20 minutes to just 3.5

A new road in Dubai will slash journey times in one neighbourhood from 20 minutes to less than four. The Roads and Transport Authority (RTA) is set to open a new entry and exit point to Al Warqa directly from Sheikh Mohammed Bin Zayed Road early June 2025, aiming to facilitate smoother access to and from the neighbourhood. Once complete, the project will increase road capacity by 5,000 vehicles per hour, reduce travel time by 80 per cent—from 20 minutes to just 3.5 minutes—and cut trip distances from 5.7km to 1.5km. RTA Dubai Al Warqa traffic RTA has also completed traffic improvement works on Street 13 in Al Warqa 1 to serve residents and schoolgoers. These enhancements form part of a broader internal road development project spanning approximately 8km, designed to improve traffic flow and enhance the efficiency of the local road network, ultimately boosting daily mobility and residents' quality of life. RTA reaffirms its commitment to developing an integrated infrastructure network, encompassing roads, lighting, and stormwater drainage systems, within residential areas, in line with Dubai's urban and population growth objectives. This reflects RTA's dedication to meeting residents' aspirations for a modern urban environment that enhances quality of life, supports sustainable mobility solutions, and ensures the highest standards of comfort and well-being. These efforts align with Dubai's vision of becoming a smart, prosperous city that meets the evolving needs of its residents while ensuring their happiness and stability. Development projects in Al Warqa also include upgrades to the internal road networks in Al Warqa 3 and 4 in Dubai. These works involve road paving, the construction of pedestrian walkways, pavements, and parking spaces, along with the implementation of cycling tracks exceeding 23km in total length. The goal is to enhance connectivity with neighbouring cycle tracks and promote alternative, sustainable modes of transport. The next phase will include capacity enhancements in Al Warqa 1, involving the conversion of existing roundabouts into signalised junctions with smart traffic lights. This is expected to improve traffic flow by up to 30 per cent. These improvements are scheduled for completion by the end of this year, as per the project timeline. Recently, RTA carried out a series of internal road development works in Al Warqa, including traffic enhancements around the School of Research Science in Al Warqa 4 and near GEMS Royal Dubai School. This included the construction of 150 additional parking spaces and the provision of secured entry and exit points for the new parking areas. These measures have contributed to easing congestion and reducing delay times in the school zone by approximately 35 per cent to 50 per cent. RTA also completed internal roads supporting the Mohammed Bin Rashid Housing Establishment project in Al Warqa 4, which comprises 136 residential villas. The works included pedestrian walkways, pavements, vehicle access points, and a fully integrated lighting system, all aimed at enhancing road safety and improving mobility for residents. In support of sustainable transport, a 7.4km cycling track was also constructed to encourage cycling for both recreation and as a viable first-and-last-mile transport option. Earlier, RTA held an interactive session with residents and frequent visitors of Al Warqa to highlight key initiatives and development projects in the Dubai district. The session also served as a platform for the public to share feedback and observations on infrastructure and the road network. This approach demonstrates RTA's commitment to listening to community voices, addressing their suggestions, and transforming them into practical solutions. The customer engagement session with Al Warqa residents was a key milestone that helped shape a series of development initiatives and projects.

Dubai: New tunnel, road upgrades to cut drive time by over 60% for commuters
Dubai: New tunnel, road upgrades to cut drive time by over 60% for commuters

Khaleej Times

time25-05-2025

  • Automotive
  • Khaleej Times

Dubai: New tunnel, road upgrades to cut drive time by over 60% for commuters

A road project aimed at easing congestion and reducing travel time between Al Khail Road and Sheikh Mohammed Bin Zayed Road is nearing completion. The Umm Suqeim Street Improvement Project, which is being developed at a cost of Dh332 million, is now more than 70 per cent complete and includes an 800-metre tunnel with four lanes in each direction. Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of Dubai's Roads and Transport Authority (RTA), conducted a site tour to inspect progress on the project which is part of a master development plan for Umm Suqeim Al Qudra corridor. Spanning 16km in total, the corridor runs from Jumeirah Street to Emirates Road. 'The project complements RTA's efforts to improve connectivity between four major arterial roads in Dubai: Sheikh Zayed Road, Al Khail Road, Sheikh Mohammed Bin Zayed Road, and Emirates Road,' he said. "It is designed to increase the corridor's capacity to 16,000 vehicles per hour in both directions, improve traffic flow, and reduce travel time between Sheikh Mohammed Bin Zayed Road and Al Khail Road by 61 per cent from 9.7 minutes to just 3.8 minutes." The project Once complete, it will serve several major residential and development zones, including Al Barsha South 1, 2, and 3, Dubai Hills, Arjan, and Dubai Science Park, with a total population exceeding one million residents. The project, which spans 4.6 km from the intersection with Al Khail Road to the intersection with Sheikh Mohammed Bin Zayed Road, includes the development of Umm Suqeim–Al Barsha South intersection, near Kings' School. This will feature the construction of an 800-metre tunnel with four lanes in each direction along Umm Suqeim Street, in addition to a an intersection with traffic signals. Previously, in 2013, RTA completed Phase I of the project, which covered the section between Sheikh Zayed Road and Al Khail Road and included the construction of two bridges, each featuring three lanes in both directions. Then, in 2020, as part of the bridges and roads development project for Dubai Hills Mall, RTA opened a main bridge along Umm Suqeim Street at the intersection with the entrance to Dubai Hills and Al Barsha South. The 500-metre bridge has four lanes in each direction and a capacity of 16,000 vehicles per hour in both directions. Smart technology Smart technologies will be used across the emirate to monitor road projects. Drones are being utilised to capture and analyse project progress data, with artificial intelligence employed to track construction milestones and performance indicators. This has improved operational efficiency on-site, made decision-making processes faster, and enabled the provision of real-time, high-precision data. The adoption of these technologies has also resulted in 100 percent increase in field presence and 60 percent reduction in the time required for site surveys. Time-lapse imaging systems are also being used to continuously monitor construction activities, contributing to 40 percent improvement in overall project monitoring efficiency.

Oman: New mountain road opens in Dhofar just in time for Khareef 2025
Oman: New mountain road opens in Dhofar just in time for Khareef 2025

Zawya

time19-05-2025

  • Business
  • Zawya

Oman: New mountain road opens in Dhofar just in time for Khareef 2025

Muscat: The Ministry of Transport, Communications, and Information Technology has inaugurated a new mountain road (Argout-Sarfait) in Dhalkut, Dhofar Governorate, as part of its efforts to enhance the efficiency of Oman's road network. The Minister, Eng. Saeed bin Hamoud Al-Maawali, stated that the road will improve connectivity to Dhalkut and the border crossing with Yemen and has been designed to meet the highest technical standards for all weather conditions. The project included construction work and a revised route to ensure sustainability while avoiding landslide-prone areas. A local contracting firm was responsible for the project, which involved a 13.5 km road, retaining walls, drainage systems, and safety signage. Additionally, the ministry has begun work on several major infrastructure projects in Dhofar, including: - Raysut-Mughsail dual road (33 km), - Mughsail bridge project (11% completion), - Atin Tunnel project in Salalah (75% completion, expected to ease traffic congestion during the khreef season), - Sultan Taimur Road dualization (6.8 km, 31% completion), - Farouq Road dualization (7.6 km, 35% completion). The ministry remains committed to improving Oman's road network and enhancing traffic safety while supporting economic growth and development. © Muscat Media Group Provided by SyndiGate Media Inc. (

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store