
Air India Flight Ai2017 To London Aborts Take-Off, Returns To Bay Due To Technical Issue
"Flight AI2017 operating from Delhi to London on 31 July returned to bay due to a suspected technical issue. The cockpit crew decided to discontinue the take-off run following standard operating procedures and brought the aircraft back for precautionary checks. An alternative aircraft is being deployed to fly the passengers to London at the earliest. Our ground staff is extending all support and care to the guests to minimise inconvenience caused due to this unexpected delay. At Air India, the safety and well-being of our passengers remain the top priority," the Air India spokesperson said.
The airline has confirmed that efforts are underway to dispatch another aircraft to ensure that the affected passengers reach their destination with minimum further delay. Ground staff have been mobilised to provide assistance and support to those impacted.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
an hour ago
- Hindustan Times
IndiGo to operate Mumbai to Tashkent, Almaty direct flights from September
IndiGo will commence four weekly flights each from Mumbai to Tashkent and Almaty in September, introducing new overseas routes. Since April, IndiGo has temporarily suspended flights from the national to Almaty and Tashkent due to constraints in the wake of the Pakistan airspace closure.(PTI) Recently, the carrier started flights from Mumbai to Tbilisi (Georgia). In a release on Tuesday, the airline said it will start "direct, four weekly flights connecting Mumbai to major Central Asian cities -- Tashkent (Uzbekistan) and Almaty (Kazakhstan), effective September 1 and 2, 2025 respectively". Since April, IndiGo has temporarily suspended flights from the national to Almaty and Tashkent due to aircraft operational range constraints in the wake of the Pakistan airspace closure. Also read: Why is Air India suspending direct flights to Washington DC? Check all details on rebooking, full refunds after Sept 1 With a fleet of over 400 planes, the airline has services to more than 40 international and 90 domestic destinations. It operates over 2,200 flights daily.

Mint
4 hours ago
- Mint
What Air India's new timeline for full retrofit of its planes means
Air India has given yet another timeline to complete its retrofit programme. The airline said the complete refit programme for its wide-body planes will now be completed in October 2028, over three years from today. The airline also informed that the first of 26 B787s is now in Victorville, California (United States) for a retrofit and would return to service in December this year. The two class 787s, currently configured with 18 business and 238 economy class seats, are being converted to three-class, which will see the introduction of a premium economy class. This includes the installation of brand-new seats in each cabin, advanced in-flight entertainment (IFE) systems, new carpeting, curtains, upholstery, lavatories, galleys and more—all aligned with the new Air India product and customer experience standards. Ten-year-old VT-ANT is the first aircraft undergoing the retrofit. The 787s have been in the news more often after the crash of VT-ANB in Ahmedabad in June, whereas earlier, the 777s made headlines for diversions, chocked washrooms and other issues. The airline has subsequently conducted a thorough check of its fleet, reduced flying to maintain schedule integrity and taken other measures to boost customer confidence. The airline will also upgrade the avionics and other critical components of all legacy 787s to the latest industry standards. This is not the first announcement for the retrofit; rather, this is one of the many announcements which have given different timelines, each missed and blamed on supply chain constraints. The airline unveiled a five-year transformation plan named in September 2022. When first announced in December 2022, the airline said the first aircraft would be back in service in mid-2024. In April 2023, the airline announced that the first of three phases of was complete. This first phase, called Taxi, focused on addressing legacy issues of the airline at scale and laying the foundation for future growth. In August 2023, when the new brand was unveiled, Air India announced that the refurbishment programme would start in mid-2024. Early this year, in March, the airline announced that the first of the widebody aircraft would fly out for retrofit in April, with the VT-ANT eventually leaving in July. If the airline manages to adhere to its latest announced timeline of 2028, when it expects all 13 legacy 777s to be back in the fleet post-refit, the oldest 777 in the fleet will be 22 years old. Air India had 16 legacy B777s at the time of privatisation, with three B777-200LRs now out of the fleet, the refit is necessary for 13 planes. With delays in the refit programme, the airline started a revamp of the aircraft with new upholstery, carpets and fixing of seats along with IFE. A handful of these planes are already in service. The cancellation of up to 15% of the airline's schedule following the Ahmedabad crash has helped improve its On-Time Performance, especially at a time when it must fly a circuitous route to avoid Pakistani airspace, which has been closed since the end of April. Air India's narrowbody retrofit programme for its 27 legacy A320neo aircraft commenced last September and is expected to be completed by September this year, with a delay of only three months from the originally stated timeline. The airline has parallelised the activity by adding a third line at GMR's MRO in Hyderabad, expediting the process. The other two lines are at Hosur and Nagpur. The Tata group took over the airline from the government in January 2022. The initial announcements and subsequent changes indicate either a rush to make announcements without knowing the actual timelines, the airline not getting priority or not being able to crack the right deals. It is a known fact that the aviation sector has been facing supply chain headwinds in just about everything, and seats and MRO slots are part of the shortage. However, many other airlines around the world have rolled out new products in recent years, with refreshed and revamped aircraft entering service. Air India has to introspect on what went wrong with its multiple announcements and whether it was better off not making any announcements until the first plane moved for retrofit? For a brand with global ambitions, such announcements that are not followed up with action suggest a lack of seriousness on multiple fronts or a lack of operational ability. It looks like a case of being far too optimistic or a disconnect from reality.


The Hindu
18 hours ago
- The Hindu
Air India to stop flights to Washington DC from Sept. 1 over planned retrofit
Air India will stop its flights to Washington DC from September 1, 2025 due to shortage of aircraft as it undertakes retrofitment of its legacy widebody aircraft starting with Boeing 787-8s. Last month, the airline sent first of its 26 Boeing 787-8 aircraft which will be unavailable for flying till December 2025. Multiple aircraft will remain unavailable over a prolonged period until at least the end of 2026, according to a statement from Air India. The retrofitment of the 787s is expected to conclude by June 2027. The airline will continue to fly to other four U.S. destinations – New York, Newark, Chicago and San Francisco. Last week, Air India CEO Campbell Wilson announced in a townhall that the retrofitment of the legacy Boeing 777 aircraft is once again delayed till mid-2027, three years behind the initial schedule of mid-2024. The retrofit for Boeing 777 is now likely to conclude by October 2028 as per the latest timeline. After taking the delivery of 6 A350s, the next widebody delivery of a new aircraft a Boeing 787 is expected by the end of 2025. The 7th A350 is expected to join Air India only in the third quarter of financial year 2026.