logo
Lack of pupils forces permanent closure of Harrogate nursery

Lack of pupils forces permanent closure of Harrogate nursery

BBC News21-04-2025
A North Yorkshire primary school is set to permanently close its maintained nursery due to a lack of demand for places.The governing board of Kettlesing Felliscliffe Community Primary School in Harrogate will remove nursery provision from 31 August, following a consultation with parents and carers.The decision will see year groups running from reception to Year 6 for pupils aged four to 11 instead of the current nursery to Year 6 for children aged between three and 11 from September.North Yorkshire Council's executive member for education, learning and skills, Annabel Wilkinson, said pupil numbers had "steadily declined" in recent years with no nursery-aged children currently enrolled.
She added: "This is not a sudden decision or something we take lightly."According to figures, 17 children were attending the nursery in October 2020, which reduced to nine in October 2022.The decision to temporarily suspend nursery provision had previously been made by the school federation's interim executive board following a consultation and took effect from September 2023.Responses to a recent consultation supported the permanent closure of the nursery and no issues or concerns were raised by local families, the council said."Based on the feedback received, it seems the sensible thing to do is to permanently change the age range at the school," Ms Wilkinson said."Despite the closure of this nursery, families still have access to good early years places within their community for their children which includes flexibility of accessing the provision during the school holidays."The school's executive headteacher, Victoria Kirkman said it was "business as usual" for pupils from reception to Year 6.
Listen to highlights from North Yorkshire on BBC Sounds, catch up with the latest episode of Look North.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Revamp of Armley Gyratory completed with new footbridges
Revamp of Armley Gyratory completed with new footbridges

BBC News

time8 hours ago

  • BBC News

Revamp of Armley Gyratory completed with new footbridges

A £40m scheme to revamp a major Leeds junction has been completed after three years of work. Newly built footbridges over Armley Gyratory have been opened, marking the end of the final phase of work on the redevelopment. It followed the earlier completion of changes to the road layout at the junction, which is one of the major access routes into and out of Leeds city centre. Leeds City Council thanked drivers for their patience during the works, which have been designed to make the gyratory safer and to reduce city centre traffic. The replacement footbridges span Wellington Road, Spence Lane and Gelderd Road. The council said the previous footbridges, which have been demolished, had been of poor standard and were approaching "expiry". More than 660 trees have also been planted in the area as part of the overall Jonathan Pryor, the local authority's deputy leader, said: "We would like to thank everyone involved in working on this scheme, along with people's ongoing patience while this essential project was carried out."Although it's great to see this project complete, we're conscious that there's still a lot of other work taking place around the city and we are working hard to deliver these as swiftly as possible while minimising disruption wherever we can." Listen to highlights from West Yorkshire on BBC Sounds, catch up with the latest episode of Look North.

Work begins on £3m refurbishment of Hilltop school
Work begins on £3m refurbishment of Hilltop school

BBC News

time3 days ago

  • BBC News

Work begins on £3m refurbishment of Hilltop school

Work has begun on a £3m project to transform a school for children with special educational needs and disabilities (SEND).Cramped and outdated classrooms at Hilltop School in Maltby, Rotherham, will be replaced with spacious and accessible facilities as part of the project, with more than 50 contractors working for free on the school, which provides specialist education for children with complex needs aged between two and 19, will remain open throughout the refurbishment work. Charlotte Farrington, founder of Yorkshire Children's Charity, which is co-ordinating the work, said it was "a life-changing project for the children and families" at the school. Half of state-funded schools in England for children with special educational needs and disabilities are oversubscribed, BBC research found in 2011, Hilltop School had just over 80 children enrolled, but that number is now more than 180, according to the Nexus Multi Academy Trust that runs it said the 1970s building did not have the space or features to properly accommodate their needs and that the school could not previously afford to update its facilities. Yorkshire Children's Charity works with SEND schools across the region, but Ms Farrington said Hilltop School was "without question, the worst I've ever been into"."I remember coming in to visit the first time, I cried all the way home from Rotherham to Leeds out of frustration - our most vulnerable children were having to make do with such poor facilities," she called it a "pressure cooker" for staff and students. As part of its transformation, new classrooms and a centre for trampoline therapy will be Sam MacDonald said he was excited to have a designated space for the school's trampolines, as using them led to "higher engagement, higher interaction, and more alertness" amongst added they also gave "massive access to the wider world" to children with physical school's ventilation system will also be Farrington said: "Outside of home and hospital, school for many of these children is all that they know, and we really have to question what kind of society we live in if we are not putting their needs first and foremost." Lee Powell, managing director of Henry Boot Construction, one of the contractors working on the project, said: "We're quite a competitive bunch in the construction and property industry."We're competing against each other for works and contracts, but for us all to join forces and do this here, it's quite rewarding."He said he was impressed by how "upbeat" the school's students and staff were despite the "run down" work is expected to be complete by September 2026. Listen to highlights from South Yorkshire on BBC Sounds or catch up with the latest episode of Look North.

World War One pillboxes in Norfolk listed by Historic England
World War One pillboxes in Norfolk listed by Historic England

BBC News

time3 days ago

  • BBC News

World War One pillboxes in Norfolk listed by Historic England

A rare semi-circular bunker-like structure is among eight World War One pillboxes in Norfolk that have been granted Grade II listed concrete buildings were built in Norfolk between 1916 and 1918, designed to protect a stretch of English coast from a potential German sea invasion, including the semi-circular one at Bacton still have their original steel doors, gun loop shutters and white-painted interiors, according to Historic East of England regional director Tony Calladine said they were "a reminder of a time when determined communities prepared to defend Britain during the Great War". Listed buildings are buildings of special architectural or historic interest with legal but one of the newly-listed pillboxes are in the North Walsham area and they are: Two defending the Common Road and Bradfield Beck crossing point at Bradfield CommonA rare semi-circular pillbox at Bacton Wood, guarding a canal bridgeTwo circular pillboxes at White Horse Common at the Edbridge Mill crossingTwo either side of Bacton Road, Little London, defending the canal bridgeThe final pillbox is another circular one at Wayford Bridge, near pillboxes were positioned along the River Ant and the North Walsham & Dilham Canal - waterways that could provided further defence in The Broads. They are all slightly inland and were part of a network of pillboxes which were designed to "provide a barrier to invading enemy troops", said Mr Calladine. Pillboxes were generally camouflaged against the landscape to hide the occupants from enemy were installed with small holes in the walls called loopholes where weapons could be fired first pillboxes were built by the German army on the Western Front, but as the threat of invasion increased in Britain, they began appearing along the east coast of."The listing of these pillboxes recognises their historic significance and exceptional durability," Mr Calladine added. Historic England hopes people will add their photographs and drawings of the pillboxes and share their stories to its Missing Pieces Project. Follow Norfolk news on BBC Sounds, Facebook, Instagram and X.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store