logo
West Midlands city develops new driverless tram technology

West Midlands city develops new driverless tram technology

BBC News09-04-2025

Coventry's tram network, like much of the city, was destroyed during World War Two.Now, 85 years since the last tram ran in the city, they may be set to return, thanks to new technology called Very Light Rail (VLR).It's hoped the technology, parts of which have been developed in the West Midlands, could make trams affordable for other towns and cities across the world. Here we explain more.
What is Very Light Rail?
It's like a tram but with different technology that will likely make it more cost effective and greener. Rather than the train-like systems we currently see in cities like Manchester and Birmingham, VLR involves single, battery-powered cars that can each transport around 50 people.At first, they will require drivers – but the aim is for the system to be autonomous. Tram cars will be recharged regularly, rather than relying on overhead power cables or electrified lines seen on other transport systems.And, with the latest iteration devised in partnership with Coventry City Council, it will work with specially engineered concrete slabs embedded into the road surface with tracks laid on top.
Why not just use normal trams?
For medium-sized cities like Coventry, full size tram networks are simply unaffordable.For comparison, the one-mile long Eastside Metro extension in Birmingham has a budget of £245m.Coventry City Council aims to demonstrate that VLR can be delivered at a cost of around £16m per mile.
One of the main reasons it could be more cost effectiveness is that the VLR system requires engineers to dig just under 1ft (30cm) into roadways – compared to around 3ft (1m) for traditional trams.This means there is rarely any need to interfere with underground utilities, significantly reducing costs and the amount of time it takes to install. There is also no need to electrify routes, making the technology much cheaper.Therefore, a VLR track should take less than half the time it would to install a traditional tram system.
Why are Coventry doing this?
The idea was originally formulated by Coventry City Council as a way of linking up the city with the proposed HS2 stop in Solihull. Trams were seen as a possible solution but, as well as the cost, the city's layout was seen as prohibitive.However, since then the system has shown potential to be a cross-city transport solution instead, but will need to secure funding in order to be delivered.Previous iterations of VLR systems were not suitable for use in urban environments. But new technology changes that by using special weight bearing concrete slabs and vehicles specially designed for tight corners.The new system has been developed by the council in partnership with WMG at the University of Warwick and the Black Country Innovative Manufacturing Organisation, which runs the Dudley Very Light Rail National Innovation Centre (VLRNIC).
Councillor Jim O'Boyle, Labour cabinet member for regeneration, said: "It's smaller than a bus and it fits very comfortably into a relatively small road area."The good thing, as well, is that it goes around very tight corners and that makes it completely unique."There's no other rail-based system anywhere in the world that can turn the tight corners that this system can – and that is why it's ideal for a city the size of Coventry."
Where and when could the trams run?
A 220m demonstrator track running between Greyfriars Road and Queen Victoria Road is already under construction and is due to be up and running by the end of May.Members of the public will be able to apply to ride on the demonstrator, with details due to be published in the coming weeks.Other lines in the proposed network would link the city centre with the Coventry Building Society Arena to the north, University Hospital to the east, Coventry Airport in the south east and Warwick University to the south west.The city council is targeting 2027 for the first full route to be installed in the city – with the airport route likely to now be prioritised.
How much has been spent on the project?
A total of £32.1m of public money has been committed to the project since it was first publicly discussed in 2017.Around £26.5m has been spent to date, with that funding being provided by the Government's Department for Transport via the West Midlands Combined Authority.The money has been spent on developing the vehicles at a facility in Dudley, as well as the track technology.
Why aren't other cities doing this?
The main reason this hasn't happened before is because the technology to make it hasn't existed.Ironically, it's now been made possible by a mode of transport it could partly replace.Christopher Micallef, Coventry City Council's VLR programme lead, said: "Battery technology that has been developed in the automotive world is what makes a battery-powered tram possible.
"In the same way, the concrete that makes our slabs possible is an innovation only available in these last years."He said "the whole point" of the project was to make tram technology affordable for smaller towns and cities.Coventry City Council also has a vested interest in making the technology a success as it owns the intellectual property rights to it, which means taxpayers could stand to benefit if it becomes mainstream. There has already been international interest too, with active discussions taking place with interested parties in Canada, New Zealand, Argentina and The Philippines.
Is it environmentally friendly?
Adding to the technology's appeal are the potential environmental benefits as cities look to cut emissions, as well as costs.Firstly, introducing a tram network should reduce the amount of vehicles on the road - assuming it is well used.While there would be some environmental impact associated with the production of the batteries and the wider system, those responsible for delivering VLR believe its green credentials are still strong.
Hamish Falconer is project manager at Colas Rail, which is installing the demonstrator track. He said: "With efficiency comes time, comes money, comes cost, comes reduction in labour as well."So less people, less machines, less material removed from site - makes this a really green way to deliver light rail."(There is) a lot less imported material as well. The fewer amount of materials we remove, and the fewer amount of materials we bring in, ultimately means a greener construction."
Is everyone convinced?
While Coventry City Council advocates for the benefits of VLR, not everyone has fully bought into the idea. The Government, which has provided funding to date, seems reluctant to fully back the project at a time when money is tight.Even the length of the city's demonstrator track has had to be scaled back - with the plan originally for it to run half a mile (800m) between Coventry railway station and Pool Meadow bus station.But it's hoped a successful trial on the 720ft (220m) demonstrator track could unlock more funding and allow VLR to be rolled out across the city.
Councillor Gary Ridley is the Conservative opposition leader on the council. He said: "There are lots of questions now within local transport circles, and within the local community, about whether this project does represent value for money."He added: "At this moment in time, people are starting to say will this represent value for money, does it actually solve the problems we need to solve?"They were quoting something like £100m just for one leg of it a few years ago, and people have asked the question would that money be better off spent on bus services?"

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Inside UK's new £189,000,000 revolutionary ‘very light' transport system
Inside UK's new £189,000,000 revolutionary ‘very light' transport system

Metro

time14 hours ago

  • Metro

Inside UK's new £189,000,000 revolutionary ‘very light' transport system

To view this video please enable JavaScript, and consider upgrading to a web browser that supports HTML5 video The motor capital of the UK has received a transport makeover – and it's already going to be expanded. Coventry has spearheaded the Very Light Rail network, which has been described as being like a tram, but better. The vehicles, which can carry 60 passengers, are cheaper and more flexible than traditional railways, and passengers started using the vehicles last month. But it's now been announced that the project, currently in use on two streets in the city centre, is set to be expanded to six new areas. The Department for Transport has released £12million to expand the project into 'growth areas' across the city, including the Coventry Gigafactory at Coventry Airport. Speaking to CoventryLive, Cllr Jim O'Boyle said: 'Coventry passengers deserve a choice of how they travel around our city. 'Sheffield, Manchester, Nottingham, Birmingham, London, Glasgow, Edinburgh, all of those have choice, so we should have that choice as well.' The transport system, currently in place along Queen Victoria Road and Greyfriars Road, could also expand to Coventry Railway Station, University Hospital Coventry and Warwickshire, Antsy Park, the University of Warwick, and Coventry University. The expansion should be completed by the end of next year, and it's hoped this will bring new jobs to the city centre. Local father and son Graham and Joe Dibbins are train drivers at RailAdventure UK and were among the first to drive the new vehicles. Graham said: 'It's an extraordinary feeling to be involved in such an innovative project and at the same time to be working with my son for the first time in a professional capacity as train drivers.' Joe added: 'It seems unbelievable that I am working with the one person I respect more than anyone else – my dad. The fact that Coventry Very Light Rail is so technologically advanced is simply the icing on the cake.' Cllr O'Boyle, cabinet member for jobs, regeneration and climate change at the city council, said the 'green' CVLR system will 'revolutionise transport in Coventry.' He said: 'Very Light Rail is just the beginning of our plans to revolutionise transport in our city, tackle climate change, improve air quality, and provide a reliable and accessible travel option.' The cost of construction is the first thing that sets it apart from traditional trams. The estimated cost per kilometre (0.6 miles) is £10million, compared to £30million for the same distance for tram tracks. The new track sits just under 11 inches (30cm) within the road surface, minimising expensive and time-consuming works to relocate pipes and cables. The VLR system is powered by batteries, meaning that, unlike trams, there is no need for overhead wires. The electric, very light rail system has been touted as a way to bring disused railway lines back into action. There are no definite plans to build ultra-light rail systems in London, but TfL and the London Assembly have discussed and reviewed the option over the years. Major rail operators are said to have shown interest in the very light rail systems, and further trials are planned to start in 2026. In London, the closest to the new train system is the tram network, which still runs across the southern boroughs. The history of London trams goes back to more than 200 years, but there were times it almost disappeared for good. The very light rail bears some similarity to the Docklands Light Railway (DLR), a driverless train operating in London since the 1980s on a 24-mile track. DLR is a light metro train, which uses purpose-built tracks, which run mostly outdoors, connecting Canary Wharf, the City, Stratford, Lewisham and Woolwich. Whereas very light rail uses batteries, the DLR gets its power from a bottom-contact third rail system underneath the train. Self-driving vehicles are expected to be on the UK roads by 2026, the government has said, opening the door for more autonomous rail systems. More Trending The Coventry very light rail has been developed to allow autonomous operation in the future. Pedestrians, cyclists and disabled passengers will have 'sufficient provision' on the new routes when they open, the council confirmed. A version of this article was first published on May 7, 2025 Get in touch with our news team by emailing us at webnews@ For more stories like this, check our news page. MORE: Inside the new £2,500,000,000 Leeds tram system with airport connection MORE: Donald Trump's travel ban doesn't make sense – here's why MORE: Double decker bus roof ripped off after crashing into railway bridge in South Norwood

Stoke-on-Trent council explores AI to speed up EHCPs
Stoke-on-Trent council explores AI to speed up EHCPs

BBC News

time12-05-2025

  • BBC News

Stoke-on-Trent council explores AI to speed up EHCPs

Artifical intelligence (AI) is being used by a council in a bid to cut lengthy waiting times for children's special needs City Council produces hundreds of education, health and care plans (EHCPs) each year and has been struggling to issue them on time because of increased demand, but delays can leave families waiting for extra 2023-24, 43% of the council's EHCPs were completed within 20 weeks, compared with a national target of 60%.Members of a scrutiny committee were told AI tools had been trained to extract information from documents such as psychological reports and write it into a plan - completing the task faster than a human. Delyth Mathieson, assistant director of education and family support, said each young person received a range of different reports and until now, individual case workers pulled elements said: "What we're looking at is a process whereby we can upload those reports, securely obviously, so that the information is collated and dropped into the format automatically and intelligently."The process still involved a case worker who knows the children, she told the children and family services overview and scrutiny case worker went through each individual report to check for any misunderstandings by the AI, she Mathieson said the approach also freed up case workers to "focus on the quality of that report, rather than a cut-and-paste exercise".Committee member Laura Carter, welcomed the move, adding: "If we have the option of bringing in technology, then why not use it?"The council said it had cleared its backlog and provisional figures for April showed 83% of EHCPs were issued within 20 authority has also recruited more educational psychologists, changed how applications are processed, and increased early intervention to reduce demand. This news was gathered by the Local Democracy Reporting Service, which covers councils and other public service organisations. Follow BBC Stoke & Staffordshire on BBC Sounds, Facebook, X and Instagram.

Bury New Road closed after hole appears affecting M60 traffic
Bury New Road closed after hole appears affecting M60 traffic

BBC News

time07-05-2025

  • BBC News

Bury New Road closed after hole appears affecting M60 traffic

Major route closed after hole appears in road The hole opened up on Tuesday evening A major commuter road has been closed to traffic in Greater Manchester after a hole appeared. Part of Bury New Road, Bury, which takes traffic to the M60, Whitefield and towards Manchester city centre, has collapsed. It is thought that a sewage pipe has burst. A diversion is in place with drivers advised to avoid junction 17 of the M60.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store