logo
179 Killed In Monsoon Fury In Himachal, Mandi, Kullu, Chambal Remain Worst-Hit

179 Killed In Monsoon Fury In Himachal, Mandi, Kullu, Chambal Remain Worst-Hit

NDTV4 days ago
Shimla:
Himachal Pradesh continues to reel under the devastating impact of the monsoon season, with severe disruptions across vital public utilities and a mounting death count.
According to the State Disaster Management Authority (SDMA), Himachal Pradesh, a total of 179 people have lost their lives since June 20, including 101 in rain-related incidents such as landslides, flash floods, and cloudbursts, and 78 in road accidents attributed to treacherous weather conditions.
As of the evening of August 3, the disaster has rendered 296 roads impassable, 134 power distribution transformers out of service, and 266 water supply schemes disrupted, highlighting the widespread infrastructural damage caused by torrential rains across the hill state.
Among the worst-hit districts are Mandi, Kullu, and Chamba, which together account for a major share of road blockages and public service breakdowns. National Highway-505 in Lahaul-Spiti also remains closed due to landslides and flash floods, cutting off vital access routes.
The SDMA report noted that the cumulative damage to public property, including roads, power lines, water systems, health infrastructure, and schools, exceeds Rs 1,71,495 lakh, with over 88,800 hectares of crops affected, primarily in agriculture and horticulture.
Officials are working round-the-clock to restore access and resume services, but continuous rainfall and terrain instability are hampering rescue and relief operations. The SDMA has advised residents to remain alert, avoid travel in vulnerable zones, and adhere to weather advisories as more rains are forecast in the coming days.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Delhi On Alert: Yamuna Breaches Warning Level As North India Faces Widespread Monsoon Floods, Fatalities
Delhi On Alert: Yamuna Breaches Warning Level As North India Faces Widespread Monsoon Floods, Fatalities

India.com

time40 minutes ago

  • India.com

Delhi On Alert: Yamuna Breaches Warning Level As North India Faces Widespread Monsoon Floods, Fatalities

The Yamuna River in Delhi breached its warning level, standing at 204.79 meters at 7 AM on Thursday, August 7, a season's high. A warning has been sounded for a flood-like situation as relentless monsoon rains pound various regions of the country, driving river levels to alarming levels. The water level of the Yamuna has increased due to heavy rainfall during a phase of continuous showers that already resulted in extensive flooding and waterlogging. North Indian Rivers Swell Heavy rain in Uttar Pradesh has triggered a flood situation in Prayagraj district, causing everyday life to be critically disrupted due to widespread waterlogging and overflowing drains. All the way downstream, the Ganga River at Varanasi is also witnessing a steady escalation in its water level. The river was at 69.98 meters as of Saturday, perilously near its danger level of 71.26 meters, due to incessant rains from the hills to the plains. The floodwaters have already overspread some areas of Tulsi Ghat at Varanasi, leading officials to prohibit all boat operations on the Ganga as a precautionary measure. The Ganga has swelled tremendously in Rishikesh, with water seen reaching the idol of Lord Shiva at Aarti Sthal of Parmarth Niketan Ashram, a grim sign of the increased current. Himachal Pradesh Devastation Mounts While that was happening, Himachal Pradesh continued to suffer from the fury of the monsoon. According to a report by the State Disaster Management Authority (SDMA), the state has so far reported 199 deaths and an aggregate financial loss of more than ₹1905.5 crore (nearly USD 229 million) between June 20 and August 6, 2025, during the monsoon. Of the 199 deaths, 108 were reported as direct rain-related disaster causalities due to landslides, flash floods, cloudbursts, and electrocutions. The other 91 were road accidents during the same duration, indicating the hazardous travel environment.

Delhi: Yamuna crosses warning mark after heavy monsoon rainfall
Delhi: Yamuna crosses warning mark after heavy monsoon rainfall

Time of India

timean hour ago

  • Time of India

Delhi: Yamuna crosses warning mark after heavy monsoon rainfall

Amid the ongoing monsoon season and continuous rainfall, the water level of the Yamuna River in Delhi rose to 204.79 metres at 7 am on Thursday, crossing the warning mark of 204.50 metres and reaching the highest level of the season so far, officials said. The rise in water level comes amid continuous rainfall during the ongoing monsoon season, which has led to flooding and waterlogging in several parts of the country. Persistent downpours have pushed river levels close to or beyond danger marks. Productivity Tool Zero to Hero in Microsoft Excel: Complete Excel guide By Metla Sudha Sekhar View Program Finance Introduction to Technical Analysis & Candlestick Theory By Dinesh Nagpal View Program Finance Financial Literacy i e Lets Crack the Billionaire Code By CA Rahul Gupta View Program Digital Marketing Digital Marketing Masterclass by Neil Patel By Neil Patel View Program Finance Technical Analysis Demystified- A Complete Guide to Trading By Kunal Patel View Program Productivity Tool Excel Essentials to Expert: Your Complete Guide By Study at home View Program Artificial Intelligence AI For Business Professionals Batch 2 By Ansh Mehra View Program In Uttar Pradesh, heavy rainfall has led to a flood situation in Prayagraj district, severely affecting daily life due to waterlogging and overflowing drains. At the same time, the water level of the River Ganga is continuously rising following heavy rainfall in Varanasi. On Saturday, the Ganga River reached close to the danger mark because heavy rains have been happening from the mountains to the plains for several days. Floodwaters reached the top of Tulsi Ghat in Varanasi. In response to the deteriorating situation, all boats running on the Ganga have been banned. According to the Central Water Commission, the river was currently flowing at 69.98 metres on Saturday, which is very close to the 71.26-metre danger mark in Varanasi. Live Events In Rishikesh, continuous heavy rainfall has caused the water level of the River Ganga to rise significantly at Parmarth Niketan Ashram, with water seen touching the idol of Lord Shiva at the ashram's Aarti Sthal. While Himachal Pradesh has reported a total of 199 deaths and a cumulative loss of over Rs 1905.5 crore during the monsoon season from June 20 to August 6 this year, according to a report by the State Disaster Management Authority (SDMA). The State Disaster Management Authority (SDMA) said that the death toll from June 20 to August 6, 2025, has reached 199, with 108 fatalities caused by rain-related disasters such as landslides, flash floods, cloudbursts, and electrocutions. An additional 91 people have died in road accidents during the same period.

Traffic will resume on old Pandameru bridge today
Traffic will resume on old Pandameru bridge today

Hans India

time2 hours ago

  • Hans India

Traffic will resume on old Pandameru bridge today

Anantapur: Vehicular movement on the old Pandameru bridge near RDT cricket stadium and TV tower in Anantapur city will resume from Thursday, following the completion of major repairs. The bridge was closed for the past eight months after heavy rains in October last year caused severe flooding in the stream below and damaged bridge bearings, making travel unsafe. MLA Paritala Sunitha inspected the site with engineering officials at that time and instructed that traffic be diverted to the adjacent new bridge in one-way mode to avoid disruption. A repair proposal costing Rs 1 crore was sent to the Union Ministry of Road Transport and Highways and the project was sanctioned on March 27 this year. The contract was awarded on April 29 to Mumbai-based Tech Fast Rebuild Pvt. Ltd, which was expected to be completed in six months at an estimated cost of Rs 85 lakh. But, under the supervision of MLA Sunitha and NH engineers, the project was finished within three months. MLA Sunitha stated that though the closure caused inconvenience to commuters, it was necessary for safety.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store