logo
Marine Viaduct To Be Built To Link Southern Penang With Silicon Island

Marine Viaduct To Be Built To Link Southern Penang With Silicon Island

Barnama12 hours ago

GEORGE TOWN, June 6 (Bernama) -- A 380-metre marine viaduct connecting southern Penang with Silicon Island will be built and is expected to open to the public by December 2028.
Chief Minister Chow Kon Yeow said the four-lane viaduct is a key component of the Pan Island Link 2A ​​(PIL2A) project, which is a strategic infrastructure initiative aimed at strengthening connectivity between Silicon Island and the Sultan Abdul Halim Mu'adzam Shah Bridge or the Second Penang Bridge, as well as supporting the state's long-term urban growth.
He said construction work on the viaduct would begin this month, with the first phase expected to be completed by mid-2027 to support the opening of the first factory to operate on Silicon Island in the same year.
'The total cost of PIL2A phase one is RM390 million, covering the construction of 1.5 kilometres of infrastructure connecting the land area at Permatang Damar Laut to Silicon Island, including the construction of a 380-metre permanent marine viaduct.
'The components in PIL2A phase one will also connect Silicon Island with the Second Bridge at Batu Maung Roundabout and the Penang International Airport (LTAPP) through the construction of an elevated highway to improve connectivity,' he told reporters after visiting Silicon Island to see the progress of development there, which has now reached 64.75 hectares.
According to Chow, the contractor has completed the construction of a 378-metre temporary bridge to provide access for construction and infrastructure works on Silicon Island, which will have a community hub, including Medan Selera Matang, to be built at Permatang Damar Laut overlooking Silicon Island.
He said the initiative is to ensure that those affected by the development project there, especially food stall traders, can be relocated, thus reflecting the state government's commitment and concern.
"The development of the community hub on land covering approximately 0.8 hectares will also include a new Village Community Management Council (MPKK) hall, Fishermen's One-Stop Service Centre, food stalls and restaurants, as well as a shed for fishermen," he said.
Chow said to support the initial water supply needs of Silicon Island, a suction tank and pump house will be built on land adjacent to Medan Selera Matang, with construction work to commence in the third quarter of this year and is expected to be completed by the end of 2027.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

MCMC Clarifies Mobile Phone Data Collection Amid Media Reports, Ensures Privacy
MCMC Clarifies Mobile Phone Data Collection Amid Media Reports, Ensures Privacy

Barnama

time7 hours ago

  • Barnama

MCMC Clarifies Mobile Phone Data Collection Amid Media Reports, Ensures Privacy

KUALA LUMPUR, June 6 (Bernama) -- The Malaysian Communications and Multimedia Commission (MCMC) has clarified its collection of mobile phone data (MPD) from Mobile Network Operators (MNOs), assuring that no Personally Identifiable Information (PII) is accessed, processed, or disclosed. The clarification comes amid recent media reports regarding the matter. In a statement today, MCMC said MPD was used strictly for the generation of official statistics to support evidence-based policymaking in two key domains, namely the ICT Sector and the Tourism Sector. For the ICT Sector, MPD helps produce granular statistics, such as the number of active mobile broadband subscriptions and penetration rates at the state, district, mukim, parliamentary constituency, state legislative assembly (DUN), and local authority levels. For the Tourism Sector, it generates indicators such as the number of visitors and domestic tourism trips. 'The MPD data requested from MNOs is anonymised and contains no PII. 'In addition, MNOs are given the option to either process the MPD data within their own secure environment and submit the required anonymised and aggregated output to MCMC, or, for MNOs without in-house processing capabilities, to submit the anonymised data to MCMC for processing. 'In both cases, no individual subscriber can be identified through the data collected,' it said. MCMC further clarified that the use of MPD as a new source of national statistics was a strategic direction set by the government to strengthen the quality and timeliness of statistical outputs for policy and planning purposes. Implementation of MPD is through collaboration with the International Telecommunication Union (ITU) and the UN Committee of Experts on Big Data and Data Science, it added. Over the past two years, MCMC said extensive engagement with all MNOs had been carried out to ensure mutual understanding of the data requirements, processes, and privacy safeguards.

CPO Futures End Lower On Rising Output Concerns
CPO Futures End Lower On Rising Output Concerns

Barnama

time8 hours ago

  • Barnama

CPO Futures End Lower On Rising Output Concerns

By Durratul Ain Ahmad Fuad KUALA LUMPUR, June 5 (Bernama) -- The crude palm oil (CPO) futures contract on Bursa Malaysia Derivatives ended lower today due to concerns over rising production, according to palm oil trader David Ng. He said weaker soybean oil prices on the Chicago Board of Trade during Asian trading hours also weighed on market sentiment. 'The rising production is mainly due to seasonality. We see prices supported at RM3,800 per tonne and resistance at RM4,000 per tonne,' he told Bernama. At the close, the spot-month June 2025 and July 2025 contracts dropped RM42 each to RM3,904 per tonne and RM3,923 per tonne, respectively. August 2025 fell RM45 to RM3,903 per tonne, September 2025 and October 2025 declined RM47 each to RM3,890 per tonne and RM3,886 per tonne respectively, and November 2025 reduced RM40 to RM3,891 per tonne. Trading volume improved to 64,761 lots from 59,422 lots yesterday, while open interest edged up to 245,562 contracts from 245,345 contracts previously. The physical CPO price for June South decreased by RM50 to RM3,950 per tonne. -- BERNAMA

Engineer loses over RM1.5mil to online investment scam
Engineer loses over RM1.5mil to online investment scam

The Star

time8 hours ago

  • The Star

Engineer loses over RM1.5mil to online investment scam

BUKIT MERTAJAM: An engineer working in the Middle East lost over RM1.5mil to an online investment scam recently. Penang police chief Datuk Hamzah Ahmad said the victim, 40, lodged a report with the Central Seberang Perai district police headquarters commercial crimes investigation division yesterday. "In November last year the man got to know a woman through the phone and had a relationship before the woman invited him to join an investment scheme called GoldenCrimson that offered handsome returns. "The man was interested to invest and was given a customer service number and a website link to register, and he invested RM90,510 and received returns of RM108,611," he said in a statement on Friday (June 6) night. The man grew confident in the scheme and made 103 transactions to 31 different accounts totalling RM1,532,563 from Dec 2 to March 8, and realised he was scammed when he failed to withdraw RM4,131,671 through the app but was asked instead to provide additional capital to be able to withdraw his profits. The case is being investigated under Section 420 of the Penal Code. - Bernama

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store