
Maharashtra govt accuses PMC of polluting Ujjani dam
The state water resource department minister Radhakrishna Vikhe-Patil had convened a meeting to discuss the issues of his department with the PMC. This was attended by state minister Madhuri Misal and other city legislators including Hemant Rasane, Siddarth Shirole, Sunil Kamble, Bhimrao Tapkir and Bapu Pathare.
The state minister pointed out that the state government had approved 14 TMC water for Pune city to meet the demand of 80 lakh population, but the civic body was using 22 TMC water in a year. 'The consumption of water by Pune city is far above the set per capita use. This is leading to less water availability for irrigation purposes and 40,000 hectares of agricultural land in the rural part of Pune district is getting affected due to less water for irrigation,' said Vikhe Patil.
He said the PMC should recycle 80 percent of water it is consuming every year and make it available for irrigation and industries but it was only recycling 30 percent of the total consumption. 'The PMC has also admitted to leakage of water so it should reduce that. It should also recycle the water which will help it in reducing additional water consumption of 8 TMC,' minister said.
'Moreover, the PMC by releasing untreated sewage water in Mutha river is polluting the Ujjani dam downstream of the river. So, the pending dues of Rs 722 crore with PMC includes charges for additional use of water and penalty for polluting the river,' he alleged, adding that the urbanisation around Pune city is also polluting the dam water for which the state government is planning project to set up Sewage Treatment Plants for rural part villages alongside the river.
Pune city's water demands are increasing and the civic body is supplying water through 2000 tankers to the recently merged 32 villages in PMC limits, he said.
The PMC has different opinions on the issues so it has been decided to constitute a task force with top officials of PMC and the state water resource department to carry out detailed study and resolve the differences.
The study of leakages, steps for recycling more water, fixing the amount of pending dues, additional use of water will be discussed by the task force, Vikhe-Patil said adding that the encroachment of land by the state water resource department will also be studied and the land would be cleared to use for another purpose.
The district collector will take action against illegal structures alongside the Mutha river that are polluting the water body and the water resource department would take up desilting of dams, he also said that the state government would seek 10 TMC water from Mulshi dam to meet the increasing water demand of other areas witnessing rapid urbanisation.
The project for saving water through leakage, evaporation and theft from the canal has been taken up, and the environmental clearance for it will be obtained soon, Vikhe-Patil said, adding that the land that will be free after a tunnel canal is constructed.
BJP legislator Hemant Rasane said that there is a dispute between PMC and the state water resource department on the amount of water used by the civic body. 'It has been going on for a long time so we demanded a task force to study and resolve it. The PMC will soon set up sufficient capacity sewage treatment plants to only release treated water in Mutha river. However, there is urbanisation outside city limits which is also contributing to pollution,' he said.
Ajay Jadhav is an Assistant Editor with The Indian Express, Pune. He writes on Infrastructure, Politics, Civic issues, Sustainable Development and related stuff. He is a trekker and a sports enthusiast.
Ajay has written research articles on the Conservancy staff that created a nationwide impact in framing policy to improve the condition of workers handling waste.
Ajay has been consistently writing on politics and infrastructure. He brought to light the lack of basic infrastructure of school and hospital in the hometown of Maharashtra Chief Minister Eknath Shinde even as two private helipads were developed by the leader who mostly commutes from Mumbai to Satara in helicopter.
Ajay has been reporting on sustainable development initiatives that protects the environment while ensuring infrastructure development. ... Read More

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
18 minutes ago
- Time of India
Govt considering subsidy for agri labour: CM
Porvorim: Chief minister Pramod Sawant on Friday said that state govt, under its agriculture policy, is considering providing a subsidy to engage labour to cultivate fields in the state. Sawant noted that some people in Goa cultivate their fields manually, and govt — under the Amrit Kaal Agriculture Policy — will consider offering the labour subsidy to help them. Saligao MLA Kedar Naik said that harvesting machines are charged on a per-hour basis in his constituency, and it requires at least one and a half hours to complete work in a field. Farmers have to pay an additional amount for the machines, he said. Naik said that in some areas of Saligao, machines cannot be used, and manual cultivation is necessary. As for harvesting machines, Naik demanded that govt increase the subsidy to cover usage for one and a half hours. Agriculture minister Ravi Naik said that he will increase the subsidy for longer machine use. He said state govt will provide a subsidy to grow mancurad trees in the state. 'We provide Rs 600 to dig a pit to plant one of these mango trees,' he said. Sawant said that Goans do not grow mancurad mangoes and should start doing so to increase mango production in the state. He said that the mancurad mangoes we eat today are from the trees planted by our ancestors. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Kentucky: These Companies Are Overcharging You for Car Insurance OTTO Insurance Read Now Undo 'Young people should take up agriculture in the state,' he said. Sawant said that a Rs 2 lakh per hectare subsidy is provided to mancurad mango growers in rocky areas. 'We are in the final stages of getting the GI tag for the mancurad mango,' he said. The chief minister said govt policy is clear about saving land for agriculture. Benaulim MLA Venzy Viegas said that rice cultivation has not increased in the state. Viegas said, 'Providing a Rs 2 per kg subsidy is not a practical solution.' Sawant said that govt provides subsidies for plantation, harvesting, and irrigation and has decided to set up a rice mill in the state so that farmers do not have to travel to other states. 'We provide the additional Rs 2 per kg support price on top of the state govt subsidy,' the chief minister said. Mandrem MLA Jit Arolkar said that when he sells coconuts for Rs 30 per piece, the department provides a subsidy of Rs 15. He asked if the subsidy would be increased. The agriculture minister said he will consider doing so.


Time of India
23 minutes ago
- Time of India
Ensure ashram-like compassionate atmosphere in jails: Gujarat HC to authority
Ahmedabad: The Gujarat high court on Friday directed the Inspector General of Prisons to ensure that "a friendly and compassionate atmosphere, akin to an 'ashram' is required to be created within the jails". Justice H D Suthar, while ordering the release of a convict detained in Vadodara's central jail for over two months longer than his punishment and awarding him compensation, stated in his order, "It is hoped that the jail authorities will treat all inmates with humanity and sensitivity, following the Model Jail Manual, and do the needful for the rehabilitation of convicts and prisoners. The Inspector General of Prisons shall ensure that a friendly and compassionate atmosphere, akin to 'ashram,' is required to be created within the jails. " Expressing this hope, the judge quoted Mahatma Gandhi's statement, "The best way to find yourself is to lose yourself in the service of others." This happened in a petition filed by a prisoner, Raju Ninama, through advocate A A Zabuawala, who complained that his client was not released from prison even after he served his sentence. The HC summoned the jail officials, including the superintendent Usha Rada, and reprimanded them for this lapse. It ordered the immediate release of the prisoner and said, "In this case, the jail authorities, instead of following the clear directions in the warrant, unilaterally reduced the set-off period, resulting in the petitioner undergoing an additional 2 months and 8 days of illegal detention, which amounts to wrongful confinement and a violation of Articles 19 and 21 of the Constitution of India. Such wrongful confinement, stemming from arbitrariness and highhandedness, reflects a complete disregard for the fundamental rights of the convict." You Can Also Check: Ahmedabad AQI | Weather in Ahmedabad | Bank Holidays in Ahmedabad | Public Holidays in Ahmedabad The jail superintendent agreed to pay Rs 50,000 compensation to the prisoner. The HC further stated, "Article 51A of the Constitution enjoins all citizens to show compassion toward living beings. Jail inmates, although convicts, do not lose their fundamental rights. Despite repeated opportunities, the authorities failed to act with empathy and continued with their illegal and arbitrary approach." The HC directed all judicial officers, who are jail visitors, that "…they must verify jail records to ensure that no undertrial prisoners or convicts remain illegally detained even for a minute beyond the completion of their sentence or granting of bail." Further, the authorities are directed "to undertake a comprehensive exercise to recalculate the set-off period for all convicts as per their respective conviction warrants. After due verification, updated admission cards/tickets of convicts and relevant jail records shall be prepared in accordance with the circular dated Aug 1, 2025."


Time of India
23 minutes ago
- Time of India
Centre clears Itarsi-Nagpur fourth rail line project
Bhopal: The PM Narendra Modi-led Cabinet Committee on Economic Affairs has approved the Itarsi-Nagpur fourth railway line project. CM Mohan Yadav expressed gratitude to Modi for sanctioning this initiative. The approved railway line, stretching approximately 297 km between Itarsi and Nagpur, will strengthen railway connectivity in central India. According to Yadav, this development will benefit Narmadapuram, Betul, Pandhurna (Madhya Pradesh), and Nagpur (Maharashtra). The project will facilitate easier access for pilgrims travelling to the Jyotirlinga temples from Mahakaleshwar, Omkareshwar to Srisailam and Rameswaram. The 339 km track will encompass 37 stations, 36 major bridges, 415 minor bridges, 2 road over bridges, 74 road under bridges, four tunnels, and two rail over bridges. The connection will link four Jyotirlinga temples: Mahakaleshwar and Omkareshwar in Madhya Pradesh, Srisailam in Andhra Pradesh, and Rameshwaram in Tamil Nadu, enhancing the pilgrim experience and regional tourism. At Nagpur, the fourth line will join the Mumbai-Howrah High Density Network, complementing the existing double line and partially finished third line. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Hanoi: Unsold Furniture Liquidation 2024 (Prices May Surprise You) Unsold Furniture | Search Ads Learn More Undo The Itarsi-Nagpur section experiences significant congestion, especially in the Ghat section (Maramjhiri-Dharakhoh). This addition aims to increase capacity, decrease delays, and improve train frequency, supporting National Infrastructure Pipeline and Gati Shakti initiatives. The ongoing third line construction, valued at Rs 2,525.73 crore, includes 27 stations, 361 bridges/culverts, and four tunnels covering 1.4 km in the Ghat section. The fourth line's implementation may require land acquisition from 40 villages in Betul district, similar to the 16.036 hectares acquired from 290 farmers for the third line. The railway line will establish improved transport connections across significant districts, benefiting passenger and freight services. Regional industries will gain from enhanced logistics capabilities. The infrastructure will incorporate contemporary signalling systems and safety protocols. The construction phase will create substantial employment opportunities, continuing through operational stages.