
Kelana Jaya LRT service disrupted between Pasar Seni and Bangsar stations due to track switch disruption, repairs underway
In a statement, Rapid Rail Sdn Bhd said the issue was detected at around 5.30 am, affecting trains travelling from Pasar Seni towards Putra Heights. As a safety measure, train operations between the two stations are being carried out manually, resulting in slower movement.
'Manual operation was implemented to ensure passenger safety, which has led to delays between the two stations,' the statement read.
Rapid Rail's engineering team is currently on site to carry out repair and restoration work to resume normal service as soon as possible.
To assist passengers and maintain safety, auxiliary police and station staff have been deployed at platforms and concourse areas.
'Announcements regarding train schedules are being made periodically at stations, and passengers are advised to check Rapid KL's social media channels for the latest updates,' it added.
Rapid Rail apologised for the inconvenience and thanked passengers for their patience and cooperation. — Bernama
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Barnama
4 hours ago
- Barnama
250 High-Powered Motorcycles To Join Kembara Merdeka Akar Umbi 2.0 In N.Sembilan
SEREMBAN, Aug 20 (Bernama) -- A total of 250 high-powered motorcycles will participate in the Kembara Merdeka Akar Umbi 2.0 at Negeri Sembilan level, accompanied by state leadership and department heads, to welcome this year's National Month on August 30. State senior exco Datuk Seri Jalaluddin Alias said the journey will pass through seven districts starting in Jempol and ending at Dataran Budaya Seri Menanti, Kuala Pilah with a culmination event on the eve of Merdeka which will also be enlivened by a fireworks display. He said the journey will be escorted by 50 cars involving a journey of more than 300 kilometres and at each stop, various activities will also be held, including donations to the needy in the districts involved.

Barnama
7 hours ago
- Barnama
- First Impressions Of Beijing: Roads, Resilience And Renewal
20/08/2025 02:33 PM Opinions on topical issues from thought leaders, columnists and editors. By : Rohani Mohd Ibrahim Setting foot in Beijing, the heart of China, for the first time – although I had previously visited other cities in the Land of the Great Wall – I was immediately struck by the immaculate condition of the roads leading from Beijing Capital International Airport to Jianguomenwai Diplomatic Residence Compound in Chaoyang District. The journey was exceptionally smooth. Not once did I encounter a bump, pothole, or even the usual signs of construction and repair work. 'Wow, this feels less like driving on city streets and more like gliding along an airport runway,' I found myself thinking. What made this impression even more powerful was the knowledge that, only weeks earlier, Beijing had endured devastating rainstorms at the end of July. The floods claimed 30 lives, damaged roads, disrupted electricity supply, and forced mass evacuations. According to Xinhua News Agency, more than 80,000 people were relocated, 31 road sections were damaged, and power was cut off in 136 villages. I recalled telling a good friend, after watching the reports on television, that I would be travelling to Beijing soon despite the severe flooding. My friend reassured me, 'Things will be fine by the time you arrive' – and indeed, his words proved true. Despite the scale of the disaster, the city's major roads had been swiftly restored, leaving a lasting impression on first-time visitors like myself. Curious about what makes Beijing's roads so durable and smooth, I began looking up reports on the subject. notes that China has been addressing urban challenges by using rubberised asphalt in road construction, particularly in rapidly growing cities. These 'rubber roads' not only enhance durability but also help mitigate the urban heat island effect, where city areas become significantly warmer than their rural surroundings. In addition, rubberised asphalt reduces noise pollution in crowded urban spaces, demonstrating its versatility in both new developments and the upgrading of existing infrastructure. Beyond the roads, I was equally impressed by how pedestrian-friendly Beijing is, with its wide sidewalks and thoughtfully designed crossings. As my first impressions suggest, Beijing is a city of resilience and innovation. I look forward to discovering more of its many facets in the days ahead. -- BERNAMA Rohani Mohd Ibrahim, a journalist with BERNAMA, is currently in Beijing to attend the China International Press Communication Centre (CIPCC) Programme from 18 August to 15 December 2025. The initiative, organised by the China Public Diplomacy Association (CPDA), serves as a platform for practical cooperation between Chinese media organisations and those from emerging markets and developing economies. The programme also provides foreign journalists with the opportunity to gain a comprehensive and in-depth understanding of China's society, development and international engagement. This marks BERNAMA's eighth participation in the CIPCC programme since 2018. (The views expressed in this article are those of the author(s) and AWS and do not reflect the official policy or position of BERNAMA)

Malay Mail
9 hours ago
- Malay Mail
Malaysia needs 100,000 more engineers to meet development goals, says works minister
KUALA LUMPUR, Aug 20 — Malaysia is currently facing a shortage of approximately 100,000 engineers to meet the country's development needs, said Works Minister Datuk Seri Alexander Nanta Linggi. He said the current number of registered engineers has yet to achieve the ideal ratio of one engineer for every 100 Malaysians. 'At present, we have only 200,000 registered engineers, and we still need about 100,000 more to meet demand,' he said after officiating the 2025 National Engineering Convention (NEC 2025) here today. Nanta highlighted that efforts to address this shortage are already underway, particularly through the enhancement of Technical and Vocational Education and Training (TVET) programmes. 'I welcome the announcement by Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi to expand TVET programmes, with a target of 60,000 participants. We are confident this initiative will help us meet the 100,000 engineer target soon,' he added. He also stressed the importance of retaining engineering graduates within the field, noting the challenge of attracting them to other sectors due to higher starting salaries. 'We do not want engineering graduates to switch careers. The government is exploring ways to ensure they remain motivated and committed to pursuing engineering careers,' Nanta said. The Ministry of Works (KKR) is examining strategies to make the engineering profession more appealing, including creating an environment that offers better job prospects for graduates. On the recent motorcycle accident on Persiaran Mokhtar Dahari here, Nanta added that the incident occurred in an area under the responsibility of the state government and its appointed concessionaire. 'If the accident was caused by road damage, I urge the concessionaire to take swift action to prevent similar incidents in the future,' he said. A report by Infrasel Sdn Bhd and the Selangor Public Works Department (JKR) indicated that the accident took place near a housing project, where road conditions had become sandy. As an immediate measure, the concessionaire is undertaking cleaning operations and will soon begin road grading to ensure the safety of the route. — Bernama