logo
Amarnath Yatra 2025 to be conducted for reduced duration of 38 days for first time: Check dates

Amarnath Yatra 2025 to be conducted for reduced duration of 38 days for first time: Check dates

Minta day ago

The Amarnath Yatra 2025 will be conducted from July 3 to August 9 this year, marking a reduced duration of 38 days for the first time along with added security.
As per a report by news agency ANI, a total of 581 companies from various Central Armed Police Forces (CAPFs) will be deployed during the Shri Amarnath Yatra 2025.
'The pilgrimage, scheduled to take place from July 3 to August 9, will now be conducted over a reduced duration of 38 days for the first time,' ANI reported.
For the first time, jammers will be installed to protect the Shri Amarnath Yatra convoy during its movement, which will be escorted by Central Armed Police Forces (CAPFs). During the passage of the convoy, all roads leading to the Yatra routes and National Highways will be temporarily blocked to ensure maximum security.
In addition to these measures, a comprehensive deployment will include Road Opening Parties (ROPs) to secure and clear the routes, Quick Action Teams (QATs) for immediate response to threats,
Bomb Disposal Squads (BDS) for detecting and neutralizing explosives, K9 units (specially trained sniffer dogs), and drones for aerial surveillance.
These arrangements will be in place on both the Pahalgam and Baltal routes to the Amarnath Cave Shrine in Jammu and Kashmir.
Among other details, Shri Amarnath Ji Shrine Board has made it clear that those below 13 years and above 70 years of age will not be permitted for this Yatra despite they obtain the compulsory medical certificate. Also, pregnant women will not be permitted, even if they produce a compulsory medical certificate.
(This is a developing story. Check back for updates)

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Runway upgrade at Delhi airport to disrupt 100 flights; 57 cancelled, 43 rescheduled
Runway upgrade at Delhi airport to disrupt 100 flights; 57 cancelled, 43 rescheduled

India Gazette

time5 hours ago

  • India Gazette

Runway upgrade at Delhi airport to disrupt 100 flights; 57 cancelled, 43 rescheduled

New Delhi [India], June 6 (ANI): Delhi International Airport Limited (DIAL) CEO Videh Kumar Jaipuriar on Friday announced that Delhi Airport will temporarily shut Runway 10/28 for a three-month period to carry out critical upgrades aimed at improving fog-time operations. This will impact around 100 flights in all. Speaking to ANI, CEO of Delhi International Airport Limited (DIAL), Videh Kumar Jaipuriar, said, 'Out of the four runways that the Delhi airport has, there is one runway 10/28 that we are planning to shut down for three months because there are upgrades that are required.' As part of the degradation, DIAL will update the current ILS (Instrument Landing System), which is already out of order. DIAL will also make the runway CAT III-B compliant. CAT III-B is an advanced landing system that allows aircraft to land in extremely low visibility conditions. Due to the degradation activity undertaken by the DIAL, 100 flights are going to be affected overall, out of which over 43 flights are going to be rescheduled. 'The new schedule has already been published, and 57 departure flights are going to be cancelled. If you put it in the perspective of the percentage, then overall, for Delhi airport, about 7 per cent of the Delhi airport capacity flights will be cancelled,' said the DIAL CEO. 'We also ensure that the cancellations are not something that is impacting in a big way. So, in most of the sectors where we had multiple connectivity, their 8-9 per cent of the connectivity was reduced so that overall that sector does not get impacted badly,' he added. Global credit rating firm Fitch Ratings in April the current year upgraded Delhi International Airport Limited to BB+, kipping the outlook as stable. In its commentary, the rating firm said that the improvement in the financial profile is likely to be materially higher than its previous expectations. DIAL benefits from a stable regulatory regime with revenue and capex determined by the Airports Economic Regulatory Authority of India (AERA). The company also benefits from its position as India's largest airport by passenger traffic and the gateway to the national capital region with a catchment population of over 30 million, supporting strong long-term growth prospects despite some competition from the proposed opening of Noida International Airport in the financial year 2026. (ANI)

What is fare for Vande Bharat train that will run on Jammu and Kashmir's Chenab bridge? Ticket price for chair car, sleeper are Rs...
What is fare for Vande Bharat train that will run on Jammu and Kashmir's Chenab bridge? Ticket price for chair car, sleeper are Rs...

India.com

time7 hours ago

  • India.com

What is fare for Vande Bharat train that will run on Jammu and Kashmir's Chenab bridge? Ticket price for chair car, sleeper are Rs...

Prime Minister Narendra Modi on Friday flagged off two Vande Bharat Express trains from Katra Railway Station, directly connecting the Jammu division with Kashmir. This marks a significant milestone in Jammu and Kashmir's railway connectivity. The Prime Minister has flagged off the Katra-Srinagar Vande Bharat train. One of the main aspects is that this Vande Bharat train will pass over the world's highest Chenab Bridge, which Prime Minister Narendra Modi inaugurated on Friday, June 6, 2025. But did you know what the fare will be for this new Vande Bharat? What is fare for Vande Bharat train that will run on Jammu and Kashmir's Chenab bridge? Ticket price for chair car, sleeper are Rs… The new Vande Bharat train will pass over India's—and the world's—tallest Chenab Bridge. According to the Aajtak report, booking a seat in the CC (Chair Car) class will cost Rs 715 for a one-way journey. The Vande Bharat train also includes Executive Class (EC) coaches, where a one-way ticket costs Rs 1,320. These prices apply to the train departing from Katra to Srinagar at 8:10 AM. For those traveling on the evening service, the fares vary: the Chair Car (CC) ticket costs Rs 660, while the Executive Class (EC) ticket is priced at Rs 1,270. According to the news agency ANI report, the new Vande Bharat Express service will reduce the travel time between Katra and Srinagar from the current 6-7 hours by road to just about 3 hours. The trains aim to provide a fast, comfortable, and reliable travel option for residents, tourists, and train will run through the Anji Khad Bridge, which is India's first cable-stayed railway bridge, and the Chenab Bridge, which is the highest railway bridge in the world. These trains have been specially designed to operate in the cold climatic conditions of the Kashmir Valley. The Udhampur-Srinagar-Baramulla Rail Link (USBRL) project is 272 km long USBRL project, constructed worth around Rs 43,780 crore, includes 36 tunnels (spanning 119 km) and 943 bridges. The project establishes all-weather, seamless rail connectivity between the Kashmir Valley and the rest of the country, aiming to transform regional mobility and drive socio-economic integration. (With Inputs from ANI)

"Historic day": Union Minister Ashwini Vaishnaw after PM Modi ianugurates Chenab bridge
"Historic day": Union Minister Ashwini Vaishnaw after PM Modi ianugurates Chenab bridge

India Gazette

time9 hours ago

  • India Gazette

"Historic day": Union Minister Ashwini Vaishnaw after PM Modi ianugurates Chenab bridge

Katra (Jammu and Kashmir) [India], June 6 (ANI): Calling this day 'historic', Railway Minister Ashwini Vaishnaw on Friday said that the Chenab bridge part of the Srinagar-Baramulla Railway Line (USBRL) was constructed working in harmony with nature. Addressing the public during the inauguration of the Chenab bridge, Vaishnaw said, 'Today is a historic day. Another gem has been added to Jammu and Kashmir. Today, PM Modi has inaugurated the railway line connecting Jammu to Srinagar. The country had cherished the dream of this railway line for decades. There were great challenges in its construction... Instead of trying to conquer nature, working in harmony with nature, this railway line has become a reality today through this network of bridges and tunnels. This was made possible due to the steely determination, hard work and laser-sharp focus of our Prime Minister.' Prime Minister Modi today inaugurated the world's highest railway arch bridge - the 'Chenab Railway Bridge' - and India's first cable-stayed 'Anji Bridge' in Jammu and Kashmir's Reasi district. Prime Minister Narendra Modi on Friday also flagged off two Vande Bharat Express trains from Katra Railway Station, directly connecting the Jammu division with Kashmir. This marks a major milestone in Jammu and Kashmir's railway connectivity. Before flagging off the trains, Prime Minister Modi interacted with schoolchildren on board and also spoke with railway staff members present on the train. The new Vande Bharat Express service will reduce the travel time between Katra and Srinagar from the current 6-7 hours by road to just about 3 hours. The trains aim to provide a fast, comfortable, and reliable travel option for residents, tourists, and pilgrims. The train will run through the Anji Khad Bridge, which is India's first cable-stayed railway bridge, and the Chenab Bridge, which is the highest railway bridge in the world. These trains have been specially designed to operate in the cold climatic conditions of the Kashmir Valley. In a remarkable gesture, Prime Minister Modi waved the Tiranga, the Indian national flag and carried it forward on the deck of the bridge on the Chenab River. Jammu and Kashmir Lieutenant Governor Manoj Sinha and Chief Minister Omar Abdullah were present during the inauguration. These bridges are part of the ambitious Udhampur-Srinagar-Baramulla Railway Link (USBRL) project in Jammu and Kashmir. The iconic Chenab Railway Bridge, the world's highest railway arch bridge, is part of the Katra-to-Sangaldan stretch, connecting New Delhi directly with Kashmir via Katra. Situated in the Reasi district of Jammu and Kashmir, the Chenab Bridge is an engineering marvel standing at a height of 359 metres above the riverbed. It will officially connect the Kashmir Valley with the rest of India via rail for the first time in history. The project faced numerous engineering and logistical challenges due to the region's difficult terrain and seismic sensitivity. Yet, after years of meticulous work, the bridge now stands as a testament to India's technological prowess and commitment to inclusive development. It marks a transformative chapter in India's infrastructural landscape, promising greater connectivity, economic growth, and social integration in the region. The Udhampur-Srinagar-Baramulla Rail Link (USBRL) project is a 272 km long USBRL project, constructed at a cost of around Rs 43,780 crore, which includes 36 tunnels (spanning 119 km) and 943 bridges. The project establishes all-weather, seamless rail connectivity between the Kashmir Valley and the rest of the country, aiming to transform regional mobility and drive socio-economic integration. (ANI)

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store