logo
What makes the NASA-ISRO NISAR satellite special?

What makes the NASA-ISRO NISAR satellite special?

The Hindua day ago
The story so far: The Indian Space Research Organisation (ISRO) is planning to launch the NISAR satellite from Sriharikota on July 30 onboard a GSLV Mk-II rocket. 'NISAR' stands for NASA-ISRO Synthetic Aperture Radar and is a joint mission of the two space agencies. It is a sophisticated earth-observation satellite designed to study changes on the earth's surface in fine detail, covering earthquakes, volcanoes, ecosystems, ice sheets, farmland, floods, and landslides.
What's the need for NISAR?
NISAR is the first major earth-observing mission with a dual-band radar, which will allow it to observe changes more precisely than any other satellite. It will be able to see through clouds, smoke, and even thick vegetation, both at day and night, in all weather conditions. The three-tonne machine costs more than $1.5 billion, making it one of the most expensive earth-observing satellites to date.
The earth's surface is constantly changing. Natural disasters, human-driven changes, and climate shifts all affect environments and human societies. Satellites provide critical information by taking snapshots of these changes from space, helping scientists, governments, and relief agencies prepare for, respond to or study them. To this end, NASA and ISRO have created a powerful global mission that also allows ISRO guaranteed access to a stream of high-resolution data tailored to India's needs.
NISAR's science and application goals span six areas: solid earth processes, ecosystems, ice dynamics, coastal and ocean processes, disaster response, and additional applications (including tracking groundwater, oil reservoirs, and infrastructure like levees, dams etc.). The planned mission lifetime is three years although its design lifetime is at least five years. Notably, the mission's data policy entails that the data NISAR produces will be freely available to all users (typically) within a few hours.
How does NISAR work?
Once it is launched, NISAR will enter into a sun-synchronous polar orbit at 747 km altitude and an inclination of 98.4°. From here, instead of snapping pictures, NISAR's synthetic aperture radar (SAR) will bounce radar waves off the planet's surface and measure how long the signal takes to come back and how its phase changes. The ability of a radar antenna to resolve smaller details increases with its length, called its aperture. In orbit, deploying an antenna hundreds of metres long is impractical. SAR gets around this by mimicking a giant antenna. As the spacecraft moves forward, it transmits a train of radar pulses and records the echoes. Later, a computer coherently combines all those echoes as if they had been captured simultaneously by one very long antenna, hence the 'synthetic aperture'.
NISAR will combine an L-band SAR (1.257 GHz), which uses longer-wavelength radiowaves to track changes under thick forests and soil and deformations on the ground, and an S-band SAR (3.2 GHz), which uses shorter-wavelength radiowaves to capture surface details, such as crops and water surfaces.
Although NISAR will operate globally at L-band, ISRO has reserved routine, planned acquisitions with the S-band SAR over India. The latter acquisitions have extended sensitivity to biomass, better soil-moisture retrieval, and mitigate ionospheric noise — all capabilities tuned to India's needs in agriculture, forestry, and disaster management. Because the L-band radar is the principal tool for NASA's mission goals, the instrument is expected to operate in up to 70% of every orbit. This said, operating both radars together is an official implementation goal so that mode conflicts over the Indian subcontinent are minimised.
Polarisation is the direction in which the electric field of some electromagnetic radiation, like radiowaves, oscillates. SAR can transmit and receive radar signals with horizontal or vertical polarisation. Using different combinations will allow the instruments to identify the structure and types of different surface materials, like soil, snow, crop or wood.
The swath width, that is, the breadth of the bands on the ground the SARs will scan, is an ultra-wide 240 km. The radars' SweepSAR design will transmit this beam and, upon its return, digitally steer multiple small sub-apertures in sequence, synthesising beams that sweep across the ground track. This scan-on-receive method allows the 240-km swath without compromising resolution.
The resulting scans will have a spatial resolution of 3-10 m and centimetre-scale vertical mapping — enough to spot impending land subsidence in cities, for example — depending on the mode. Each spot on the ground will be scanned once every 12 days. The satellite also features a large 12-m-wide mesh antenna. NISAR will produce annual maps of aboveground woody biomass of 1 ha resolution and quarterly maps of active and inactive cropland. High-resolution maps of flooded versus dry areas will be available as well. During a disaster, NISAR can also be directed to collect data for 'damage proxy maps' to be delivered in under five hours.
This said, for certain acquisition modes, NISAR won't be able to achieve full global coverage at the highest resolution. Above roughly 60° latitude, every alternative observation will be skipped due to converging ground tracks. Similarly, some 10% of the surface may not be mapped from either direction (of the satellite's passage over the ground) in any given 12-day cycle.
How was NISAR built?
At the time the two space organisations agreed to build NISAR, NASA and ISRO decided each body would contribute equivalent-scale hardware, expertise, and funding.
ISRO supplied the I-3K spacecraft bus, the platform that houses the controls to handle command and data, propulsion, and attitude, plus 4kW of solar power. The same package also included the entire S-band radar electronics, a high-rate Ka-band telecom subsystem, and a gimballed high-gain antenna. The S-band electronics were designed and built at the Space Applications Centre in Ahmedabad.
NASA's biggest contribution was the complete L-band SAR system. NASA's Jet Propulsion Laboratory (JPL) supplied all radio-frequency electronics, the 12-m antenna, a 9-m carbon-composite boom, and the instrument structure that carries both radars. The agency also fabricated the L-band feed aperture and provided the supporting avionics, including a high-capacity solid-state recorder, a GPS receiver, an autonomous payload data system, and a Ka-band payload communications subsystem. The spacecraft was to be integrated at the ISRO Satellite Centre in Bengaluru after the two radars were mated at JPL. Following observatory-level tests, the mission will lift off from Sriharikota onboard a GSLV Mk-II rocket, with ISRO providing end-to-end launch services.
While the mission operations are to be centred at the JPL Mission Operations Center, day-to-day flight operations will be led from the ISRO Telemetry, Tracking and Command Network in Bengaluru.
Once NISAR is in orbit, most of its data will be sent through NASA's Near Earth Network facilities in Alaska, Svalbard (Norway), and Punta Arenas (Chile), which can together receive around 3 TB of radar data per day. They will be complemented by ISRO's ground stations in Shadnagar and Antarctica. After the raw data arrive, India's National Remote Sensing Centre will process and distribute all products required for Indian users, mirroring NASA's pipeline.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

NASA plans a 21% workforce reduction
NASA plans a 21% workforce reduction

Time of India

time4 minutes ago

  • Time of India

NASA plans a 21% workforce reduction

Advt By , Agencies NASA is set to reduce its civil servant workforce by approximately 21%, with around 3,780 employees opting into two voluntary resignation schemes, the agency confirmed this week. The programs are part of NASA's efforts to streamline operations while maintaining its capability to drive upcoming space exploration initiatives, including Moon and Mars Cheryl Warner stated the move aims to strike a balance between efficiency and readiness for what NASA calls a ' Golden Era of exploration and innovation.' The agency anticipates retaining around 14,000 employees after accounting for the resignations and an additional 500 departures through routine voluntary exit programs offer financial incentives or concessions to encourage staff to resign. The agency stressed that while the forecasted figures are approximate, further changes in headcount may occur depending on future operational significant workforce reduction follows broader federal downsizing efforts under the administration of US President Donald Trump. Elon Musk, previously head of the Department of Government Efficiency (DOGE), had been involved in driving such agency-level workforce reduction signals a shift in how NASA plans to staff future missions, leaning on a smaller core team while likely expanding collaboration with private aerospace contractors and commercial partners. This approach reflects changing workforce dynamics within the federal science and technology sector.

ISRO-NASA Earth Observation Satellite Set For July 30th Launch, Says ISRO Chief
ISRO-NASA Earth Observation Satellite Set For July 30th Launch, Says ISRO Chief

India.com

time4 minutes ago

  • India.com

ISRO-NASA Earth Observation Satellite Set For July 30th Launch, Says ISRO Chief

The Earth Observation Satellite jointly developed by ISRO and NASA will be launched into space on July 30 aboard India's GSLV-F16 rocket, ISRO Chairman Dr. V Narayanan announced today. Speaking to reporters at the Chennai International Airport, Dr. Narayanan said that the satellite will be placed in orbit at an altitude of 740 km and is equipped with state-of-the-art radar imaging technology. 'This advanced satellite can capture images of Earth 24 hours a day, even during cloud cover and rain. It will play a crucial role in detecting landslides, supporting disaster management, and monitoring climate change. Its benefits will extend not only to India and the United States but to the global community as a whole,' he said. Providing updates on other key missions, the ISRO Chairman said the Aditya-L1 solar satellite, launched earlier with a 1.5 kg payload, has begun transmitting solar research data. Scientists are currently analyzing this information for deeper insights into solar activity. On the much-anticipated Gaganyaan human spaceflight mission, Dr. Narayanan said that three uncrewed test missions are planned before astronauts are sent into space. 'The first vehicle is being readied at Sriharikota and will be launched this December with a humanoid payload. If that succeeds, two more missions will follow next year. The first manned mission is scheduled for March 2027, as announced by the Prime Minister,' he said. Dr. Narayanan also shared progress on India's upcoming lunar missions. He expressed confidence that Chandrayaan-4, designed to land on the Moon and bring back soil samples, will be a success. 'This mission will mark a significant step for ISRO in lunar exploration,' he said. He added that Chandrayaan-5, a joint mission with Japan, is expected to operate for 100 days on the Moon. ISRO currently manages 55 satellites and is working to reorganize them into three categories over the next four years. Dr. Narayanan emphasised that ISRO's research is national in scope and not tailored to individual states. 'Our focus is on what the people of the country need, irrespective of the region,' he said.

Nisar launch on July 30: Why it will not work for the first 90 days
Nisar launch on July 30: Why it will not work for the first 90 days

India Today

time4 minutes ago

  • India Today

Nisar launch on July 30: Why it will not work for the first 90 days

The Indian Space Research Organisation (Isro) is all set to launch the billion-dollar NASA-ISRO Synthetic Aperture Radar (NISAR) mission from India on July satellite is set to become a cornerstone of Earth observation as it unfolds in the vacuum of space after lift-off from the Satish Dhawan Space Centre in Sriharikota on the spacecraft will not begin its much-anticipated science operations until 90 days after launch. Initial activities focus on verifying the health and status of the satellite's main systems. (Photo: Isro) advertisementWHY WILL IT NOT WORK FOR 90 DAYS IN SPACE? This measured approach is due to the critical commissioning or In-Orbit Checkout (IOC) phase, a period dedicated to preparing the satellite and its sophisticated instruments for their full two space agencies have set a three month period for the commissioning of the satellite before it begins mapping the planet for minutest changes and shifts. Once in orbit, NISAR will spend its first three months undergoing a series of meticulous checks and calibrations. The IOC period is split into several activities focus on verifying the health and status of the satellite's main systems. Following this, engineers will concentrate on the payload and instrument checkout. This process is aimed at validating the performance of NISAR's state-of-the-art sensors. NISAR mission's primary objectives are to study land & ice deformation, land ecosystems. (Photo: Isro) A highlight of the commissioning phase is the deployment of NISAR's impressive 12-meter diameter reflector, one of the largest ever flown on an Earth observation satellite. Attached to a 9-meter-long boom, the reflector must be unfurled with extreme precision in orbit, a task made possible by a multi-stage deployable mechanism designed by NASA's Jet Propulsion Laboratory (JPL).'Commissioning is essential to ensure the observatory operates as intended and delivers high-quality data,' a senior Isro official explained. "Any missteps now could compromise years of upcoming scientific research."Only after this commissioning period will the satellite transition into full science operations, where it will collect groundbreaking data on Earth's surface using its dual-frequency L- and S-band radars. The spacecraft will not begin its much-anticipated science operations after launch. (Photo: Isro) During this phase, the satellite's orbit will be carefully maintained, with manoeuvres scheduled to minimise interference with scientific observations. Extensive calibration and validation (CalVal) activities, along with early data releases, will further ensure data for observation schedules and engineering tasks, including upcoming manoeuvres and sensor updates, is already underway through close coordination between JPL and NISAR, patience in the early days is critical, laying the foundation for years of transformative Earth science.- EndsMust Watch

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store