
Province takes metro to court over land invasion, dumping near Hennops
The area has suffered significant environmental damage due to pollution and unregulated human settlements.
Metro spokesperson Lindela Mashigo confirmed that the metro had been served with court papers relating to the matter.
He emphasised that the city is fully aware of the situation and its implications for the environment, particularly the Hennops River.
Mashigo noted that the Tshwane metro's environmental management inspectors (Green Scorpions) had already taken steps by issuing a directive under Section 28 of the National Environmental Management Act (NEMA) to the Gauteng Department of Infrastructure Development (GDID).
GDID owns the land in question.
'NEMA Section 28 requires that every person who causes, has caused or may cause significant pollution or degradation of the environment must take reasonable measures to prevent such pollution or degradation from occurring, continuing or recurring,' he said.
He added that if the harm to the environment is authorised by law or cannot be reasonably avoided, the act still obliges those responsible to minimise and rectify such pollution or degradation.
Mashigo explained that this responsibility extends to any landowner, occupier or person with control or legal rights to the land or premises.
'In light of non-compliance with the directive, the matter has been handed over to the Gauteng Department of Environment for possible criminal prosecution.
The Tshwane Metro Police Department (TMPD) also continues to enforce municipal waste management by-laws in the area.'
To prevent similar environmental degradation in the future, Mashigo said the metro is engaging with the Johannesburg and Ekurhuleni metros to manage transboundary pollution.
'The city is in the process of identifying suitable properties to establish multipurpose waste sorting facilities to ensure that waste sorting activities are conducted in an environmentally compliant manner,' he added.
This legal action from the provincial government follows a sustained campaign by the DA, which has allegedly been pushing for government intervention since 2021.
In May, DA provincial spokesperson for Environmental Affairs, Leanne de Jager, announced that the party's long-standing advocacy had led to the Gauteng government initiating legal proceedings against the Tshwane metro.
'The illegal invaders are residing on the banks of the Hennops River, which has a severe environmental impact on the water system and air quality.
'They also dump refuse inside the river, exacerbating the problem,' she said.
De Jager emphasised that ensuring the Hennops River system remains free from illegal dumping is crucial for water quality, local air quality, and preventing soil contamination on provincial land.
She explained that the party had used multiple channels to address the issue over the past four years, including tabling questions in the Gauteng Provincial Legislature, submitting petitions, and engaging provincial departments to take action.
According to De Jager, the case will be heard in court on August 13.
'This case sets an important precedent, showing that community action backed by political leadership can result in meaningful environmental accountability,' she stated.
She added that a DA-led Gauteng government would prioritise the protection of provincial land and ensure that the Green Scorpions deliver on their mandate to monitor rivers and ensure they are free from pollution.
While the legal process plays out, broader efforts to address the pollution of the Hennops River system are already underway at a local level.
Last month, Tshwane Mayor Dr Nasiphi Moya announced that the metro had officially partnered with the Johannesburg and Ekurhuleni metros to tackle one of the Hennops River's most critical upstream pollution sources, the Kaalspruit River.
The Kaalspruit River originates in Ekurhuleni and flows through Johannesburg before merging with the Hennops River.
It has been identified as a key contributor to the pollution crisis affecting the entire river system.
Moya said the collaboration among the three metros was formalised during a joint meeting on May 26, which she described as a defining moment for her administration.
'For too long, we have been plagued by the declining state of the Hennops River and overwhelmed by a sense of helplessness because of our inability to address the upstream causes of pollution,' said Moya.
She explained that urbanisation, informal settlements near riverbanks, and the dumping of raw sewage and municipal waste have all contributed to the environmental collapse of the Kaalspruit and, by extension, Hennops.
'This river system is deteriorating fast. Illegal sand mining and sewer mining have also compounded the situation, leading to excessive erosion and the silting up of the entire system, all the way past the Hennops River and down to Hartbeespoort Dam,' she said.
'It is by overcoming the blame game that the three metros can accept that we are in this together and committed to doing whatever it takes to fix it.'
Moya said the agreement between the municipalities includes the establishment of an inter-metro multidisciplinary Kaalspruit Task Team, made up of senior officials from the respective metros.
This team will regularly report to the three mayors and align existing plans into a combined proposal with technical interventions and funding requirements.
Do you have more information about the story?
Please send us an email to [email protected] or phone us on 083 625 4114.
For free breaking and community news, visit Rekord's websites: Rekord East
For more news and interesting articles, like Rekord on Facebook, follow us on Twitter or Instagram or TikTok.
At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Citizen
3 hours ago
- The Citizen
Councillor demands metro fixes traffic lights before lives are lost
Ward 83 councillor, Andrew Lesch, has launched a petition demanding urgent action from the metro to address the dangerous neglect of traffic lights in his ward. With more than 100 signatures from concerned residents, the petition highlights repeated failures in maintenance that have reportedly already led to serious and fatal accidents. Lesch warned that, within Ward 83 alone, several traffic lights remain unrepaired after vehicle collisions, including intersections at: – Mante Road (previously called 'Mantis' Road), – Garstfontein and Lois Road – Garstfontein and January Masilela Road – Nossob and Jochemus Street – Delmas and Nossob Street. Lesch also said that beyond lights, critical warning signs such as chevrons and road markings are missing, especially at Rubenstein and Rutgers Streets in Moreleta Park, which he identified as the most notorious of the affected locations. He added that inadequate street lighting compounds the safety risks, arguing that residents of his ward cannot be further exposed to unnecessary and preventable dangers caused by the lack of service delivery by the metro. 'The petition calls for immediate replacement of the missing traffic lights and signage and proper maintenance as required by law.' In response, metro spokesperson. Lindela Mashigo said reference numbers for the petition exist in the system, but there is no clear record of when the issues were first lodged, so their initial lodgement dates remain undetermined. He added that no road safety risk assessments have been carried out regarding the missing signage. On the financial side, Mashigo explained that the metro does not allocate maintenance budgets per ward. 'Instead, the metro receives a collective allocation of approximately R6.6-million to maintain all 1 014 signalised intersections across the metro.' When asked which intersections in Ward 83 are scheduled for repair and their timelines, Mashigo provided the following status updates, as of August 12: – Garstfontein and [Mantis] Road, where a pole is missing, has been made safe and operational, and pole replacement was scheduled for August 12–15 – At Garstfontein and Lois Road, two totem poles are down, but the site has been made safe, and removal of the old poles was also scheduled for August 12–15 – Garstfontein and January Masilela Road has a skewed pole, which has been made safe and operational, but replacement awaits the awarding of a materials tender – Nossob and Jochemus Street has a missing overhead pole; it has been made safe, but the replacement similarly awaits a tender award – At Delmas and Nossob, a pole has been cut down, likely stolen, but again the site is made safe, and the replacement awaits a tender award – Solomon Mahlangu Road and Lois Avenue has a skewed pole made safe, but replacement is pending the same tender process – At Solomon Mahlangu and January Masilela Road, an accident-damaged pole has been made safe and awaits replacement through the same tendering procedures. Asked if any of these intersections are part of any broader upgrade works, Mashigo said that none from the traffic signal unit are scheduled for inclusion. He said the initial damage was caused by vehicle collisions, yet no further accidents have been reported at those sites since the intersections were made operational again. 'The metro traffic signal teams respond daily to minor damages to ensure intersections remain safe. 'Major repairs, including full pole replacements or trenching for cable replacements, require additional funding and labour and are often paused until minor faults are addressed due to limitations in manpower and resources. 'Supply chain processes are underway to appoint outsourced service providers for additional labour and to supply the necessary materials for traffic light and signage restoration.' Mashigo said to prevent further delays and restore safety, the traffic signals maintenance team prioritises isolating faults and making intersections safe. ALSO READ: Atteridgeville crime sweep nets hundreds of suspects for various crimes Do you have more information about the story? Please send us an email to [email protected] or phone us on 083 625 4114. For free breaking and community news, visit Rekord's websites: Rekord East For more news and interesting articles, like Rekord on Facebook, follow us on Twitter or Instagram or TikTok.


The Citizen
12 hours ago
- The Citizen
City says debt relief working, critics warn of looming crisis
The metro has defended its controversial debt relief programme, maintaining that consumer debt has declined. This comes after criticism from opposition parties who claim it encourages non-payment and threatens the metro's financial health. Opposition claimed that despite the debt relief programme, residents' outstanding debt increased by more than R700-million in the previous financial year. The Freedom Front Plus said it was particularly concerned about a 600% increase in new defaults within the 31-60-day payment period. However, metro spokesperson Lindela Mashigo argued that consumer debt has been decreasing since the launch of the incentive in May. 'Between February and March, the debtors' book fell by 13.56%, with a further drop from R26.6-billion to R25.8-billion over the next two months,' Mashigo said. He said these figures prove the initiative is working, allowing residents to settle arrears and keep their accounts in good standing. 'The plan offers ratepayers a 70% discount on outstanding municipal bills if they pay the balance in full, and was introduced to address a historic R30-billion debtor's ledger.' Mashigo dismissed claims of a 600% spike in new defaults as 'factually incorrect'. 'Nevertheless, the city remains committed to addressing all arrear accounts, particularly those that are 30 days and more in arrears.' He said intensified credit control measures are being implemented to reduce the debtors' book and to improve the overall payment levels. 'These measures include stricter enforcement of credit control policies, targeted customer engagement, and proactive monitoring of payment patterns to prevent accounts from falling into longer-term arrears.' Mashigo stressed that the metro maintains a structured payment arrangement with Eskom, honoured in full and on time. 'We have never defaulted on our commitments to Eskom and disciplined financial management has kept essential services running.' Despite the metro's reassurances, opposition parties remain unconvinced. Freedom Front Plus Councillor Mark Surgeon warned that outstanding debt climbed by more than R700-million in the past financial year, even with the debt relief scheme in place. He accused the ANC-led coalition of using the policy as a quick political fix rather than a long-term financial strategy. 'The FF Plus has always maintained that general debt write-offs foster a culture of non-payment,' said Surgeon. Surgeon also cited a R2.28-billion increase in the city's own debt in 2024/25 and a 43% rise in what it owes Eskom, warning of looming fiscal collapse. He said underspending on projects further erodes public trust, calling the budget a 'political wish list' rather than a binding service delivery plan. Surgeon argued that without structural reforms, the debt crisis will only deepen, worsening service delivery and public confidence in municipal governance. The DA shared similar concerns. Former MMC for Finance Jacqui Uys said the policy benefits residents who can pay but choose not to, while doing little for struggling households or for restoring payment discipline. 'The processes followed by the coalition do not ensure the inclusion of defaulting ratepayers back into the payment net,' she said. Uys said the DA had proposed alternative repayment models to help those who want to pay but cannot, but these were rejected. 'The debtors' book might even be closer to R28-billion,' said DA caucus leader in Tshwane Cilliers Brink. Brink said it is clear that there hasn't been an uptake by residents of the incentive scheme of the city. 'The DA warned that the scheme is inadequate, but the bigger problem is that credit control is not happening.' He said other measures, such as rolling out smart meters to indigent residents, are also not happening. 'Instead of collecting what is already due to the city, the ANC coalition has sought to introduce a new tax, the so-called city cleansing levy. Now that the High Court has set the levy aside, it means that there is about R500-million shortfall on top of the R850-million shortfall from the financial year ending in June,' said Brink. Mashigo insists that the metro's approach, combined with stronger credit control and targeted revenue collection campaigns, will stabilise its finances and support long-term service delivery. He said the underspending experienced in the 2024/25 financial year can largely be attributed to delays in project implementation, procurement processes, and the finalisation of contractor appointments. 'In some cases, unforeseen technical challenges and compliance requirements also contributed to slower capital expenditure. While underspending may temporarily affect the pace of certain service delivery projects, the city is actively working to fast-track delayed initiatives and reallocate resources where possible to ensure service delivery targets are met.' He said the city has instituted a 'war room' initiative led by the mayor. 'In this forum, service delivery departments are required to report regularly on the progress of their respective capital programmes and others.' According to Mashigo, the political leadership provides oversight, ensuring accountability and alignment with strategic priorities. 'Importantly, this process operates in conjunction with the statutory oversight functions of the Section 79 Committees and the city's council, which continues to hold the administration accountable for sound budget planning, disciplined execution, and prudent financial management. This layered oversight structure mitigates the risk of undue political interference.' Mashigo said the metro has adopted an approved service delivery budgetary implementation plan that outlines clear performance targets for each department. 'This plan is supported by a funding plan aimed at ensuring financial viability, achieving strategic financial objectives, and strengthening the city's liquidity position. By enhancing revenue collection and optimising expenditure, the city can sustainably deliver essential services to communities, thereby restoring public trust and reinforcing confidence in its financial stability.' He denied that the debt relief programme has fostered a culture of non-payment, saying on the contrary, it has provided much-needed financial reprieve to residents across the city, enabling them to settle arrears and remain in good standing. Do you have more information about the story? Please send us an email to [email protected] or phone us on 083 625 4114. For free breaking and community news, visit Rekord's websites: Rekord East For more news and interesting articles, like Rekord on Facebook, follow us on Twitter or Instagram or TikTok.


The Citizen
12 hours ago
- The Citizen
Pull the plug and start dialogue over
It's time to pull the plug on this whole thing… and start again. While the National Dialogue saga seems destined to generate little more than more hot air – as if we don't have enough already from our verbose politicians – it does provide some fascinating material for pondering our parlous political situation. First, the foundations associated with the elders of recent South African history – those who negotiated the way towards ending apartheid – have pulled out of the process. What the National Dialogue should've been One of the prominent critics of the dialogue process is former president Thabo Mbeki. He was the man who set in motion this idea of a national dialogue, and, in his own words, it should have been civil society in the driving seat, not President Cyril Ramaphosa and the ANC. That would seem, at first glance, to be noble and wise, as befitting Mbeki's status as an elder statesman. However, what if Mbeki realised that his own legacy – despite the collapse which followed after he left office – was going to be less than shining? Even ignoring the Aids debacle, where an estimated 250 000 people died while he dithered about antiretroviral medications, Mbeki is regarded by many critics as having moved the country onto a neocolonial, capitalist-friendly course, failing to deal with critical issues like land restitution. Perhaps he needs the dialogue to rebuild his legacy into one of 'the man who saved South Africa'. Yet, whatever his motive may be, Mbeki is correct – and so are the others who withdrew – that this dialogue should not be steered by Ramaphosa and the ANC. People, not political parties, should air their views on the future. That is why it is concerning that organisations like the DA and Freedom Front Plus, which represent many in the white community, have also chosen to stay away. It's time to pull the plug on this whole thing… and start again. READ NEXT: Mazibuko reaffirms that the National Dialogue will be in the hands of South Africans