logo
Derby's market hall reopens after seven-year multi-million-pound renovation

Derby's market hall reopens after seven-year multi-million-pound renovation

ITV News26-05-2025

Hundreds turned out to see Derby's new Market Hall, Mark Gough reports
Derby's Market Hall has reopened after a seven-year £3.5-million renovation.
A ribbon-cutting ceremony was held on Saturday morning (May 24th) - almost 159 years to the day since its original grand opening.
Hundreds of people were seen queuing outside waiting to get inside the Grade II listed building.
The Market Hall was officially declared open on 29 May, 1866 by Mayor Frederick Longdon, where the occasion was marked with an appropriate inaugural ceremony, including a performance of Handel's Messiah.
The council said the transformed Market Hall will bring together the best of the region's independent shopping, eating, drinking, and entertainment, and will offer a variety of new features and experiences for visitors, such as:
Stallholders were setting up for the first week of trading, which began today (May 26th).
Previously, the Market Hall often had to close to customers if there was a chance of strong winds, snow, or heavy rain in case the glass windows came out of their frames.
These windows have now been replaced, and the extensive structural restoration of the roof was finished in August 2022.
The revitalised Market Hall has also been redesigned with accessibility and inclusion at its heart, making it an accessible building for all visitors.
Leader of Derby City Council and Cabinet Member for City Centre, Regeneration, Strategy and Policy, Councillor Nadine Peatfield, said: "This is a historic moment for everyone in the city to be celebrated by all.
"Derby Market Hall will be a flagship, vibrant destination that will attract visitors from across the region and beyond. I am truly excited for the opening event, and I know that visitors will enjoy everything that the revitalised Market Hall has to offer.
Located at the heart of the city centre, linking Derbion and St Peter's Quarter with the Cathedral Quarter and Becketwell, the redeveloped Market Hall will play a key role in widening the diversity of the city centre and is expected to generate £3.64m for the local economy every year. "

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Wolverhampton roadworks to last three months longer than planned
Wolverhampton roadworks to last three months longer than planned

BBC News

time2 hours ago

  • BBC News

Wolverhampton roadworks to last three months longer than planned

Roadworks in the centre of Wolverhampton will go on for three months longer than planned due to the need for emergency repairs.A six-month road closure on Darlington Street between Chapel Ash Island and Red Lion Street was due to end next month, but the council said it would now run until road was shut as part of a two-and-a-half-year £19m city-centre transformation scheme that began in companies had to intervene after recent excavations found a water main in poor condition, BT chambers that needed urgent work, and cellars that had to be filled to avoid subsidence, the council said. According to the authority, Severn Trent Water cannot start the mains work until the end of the month, a situation which has temporarily halted development on the southside delays were described by a spokesperson as "out of the council's and [developer] Taylor Woodrow's control"."We appreciate this is frustrating and we will continue to do everything in our power to minimise disruption caused by these unforeseen issues with utility providers," said the council's cabinet member for city development Chris added the works were the next steps in plans to "enable people to better enjoy our city centre" following improvements to North Street and Victoria Street. Pedestrian access to business would be maintained during the lengthened closure period, the council added the site works schedule had been adjusted and overall city centre improvements were still on course to be completed by summer revamp follows consultation with residents and businesses and aims to improve lighting, create more greenery and make the area easier to access for buses, cycles and taxis. Follow BBC Wolverhampton & Black Country on Facebook, X and Instagram.

Long Eaton regeneration projects face further delays
Long Eaton regeneration projects face further delays

BBC News

time5 hours ago

  • BBC News

Long Eaton regeneration projects face further delays

Several multimillion-pound regeneration projects in Long Eaton have been delayed by several Borough Council was given £25m of government funding to rejuvenate the town more than five years all but one of the projects are still in their pre-construction for all of the schemes in the Town Deal must be spent by March 2026 or it faces being pulled back by central government. They must be completed in full by March 2027. A meeting of the Long Eaton Town Board heard that construction of the listed building next to Long Eaton Town Hall has been extended by four months because of defective designs, with completion now set for August rather than Stable Block building is set to become a modern working hub with new office and workshop space. The Britannia Mills Bridge, which will form part of an improved pedestrian and cycling network, now faces a six-month delay and will begin in September this year, with completion set for March 2026. Starting works at Broad Street Bridge, connecting West Park with the town centre over Erewash Canal, also faces delays. Work was originally mooted to begin in January but has been delayed again from July to August while further cost benefit analysis is completed but with no knock-on delay to completion expected. The project to revitalise Long Eaton's high street has faced "unexpected queries" from Derbyshire Highway Authority, according to the council, resulting in of works, estimated to cost about £10m, will not happen until July 2026, instead of June. This date however has been bought forward than the original October 2026 estimate for will begin in September this year. Meanwhile the former Galaxy Row cinema, where demolition work began in May, has also faced another round of will begin its development stage in September this year, a month after the time it was originally mooted to be latest slowdown will see the project, which will see the site turned into shops and flats, now expected to be completed in December 2026 instead of October.A project to improve lighting in West Park to encourage walking and cycling was completed last year. 'Challenges to overcome' The leader of Erewash Conservatives Wayne Major said the delays were "a real concern"."While it's positive that there's now some leeway from government on deadlines, that flexibility should be used to get projects over the line, not to drift further behind."Keeping to budget and timeline is essential if we're going to make the most of this funding." A spokesperson for Erewash Borough Council said: "The Town Deal continues to be a massive project for the borough council. Like almost all the other such schemes across the country we have had challenges to overcome along the way."The conditions set by the Towns Fund is for all projects to be in contract by the end of March 2026 – with projects completed by the end of March 2027. We are well on track to achieve this."

Contract signed to transform old Northampton bus station site
Contract signed to transform old Northampton bus station site

BBC News

time12 hours ago

  • BBC News

Contract signed to transform old Northampton bus station site

An agreement has been signed to transform the site of an old bus station that was demolished a decade Greyfriars development in Northampton will include 1,000 homes, an amphitheatre, shops and 25-acre (10.1ha) site also includes two existing car parks, a disused corn exchange, and a derelict office Northamptonshire Council said the deal would "revitalise a long-neglected area of the heart of the town centre". Ever since Northampton's Greyfriars bus station, labelled "the mouth of hell", disappeared in a huge cloud of dust in 2015, the site has been vacant and agreement that has now been signed means work could be starting soon on a project that will, according to the council, "unlock the true potential of Northampton".The signatures on the document are those of the council and ECF which is a joint venture between the government's Homes England agency and private firms Legal & General and "placemakers" Muse. As well as the bus station site, the regeneration area includes the Mayorhold and Victoria Street Car Parks and the traffic islands either side of the bus is also the Corn Exchange, built in 1851, and Belgrave House - a giant 1970s brutalist office the plans, Belgrave House is set to become a "flexible space for established and emergent businesses". The Corn Exchange is likely to be turned into art and performance space, alongside a new amphitheatre on what is now the West Island.A park is included in the plan, occupying the area which is now Lady's plans include affordable, built-to-rent and student accommodation alongside shops, restaurants and leisure council claims 7,000 full-time equivalent jobs will be created during the construction phase and "over £1bn in economic value" will be "unlocked". James Petter, cabinet member for local economy at the Reform UK-controlled council, said: "The regeneration of Greyfriars will not only revitalise a key part of our town centre but also strengthen our local economy, improve connectivity, and create a more inclusive and vibrant place to live, work, and visit."Sir Michael Lyons, who chairs ECF, said: "Entering a development agreement will enable us to take the next important step in the delivery of this important opportunity."He added that both parties would now "move at pace" to deliver a masterplan for the project. Follow Northamptonshire news on BBC Sounds, Facebook, Instagram and X.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store