
MTDC plans to install EV charging points across state
Maharashtra Tourism Development Corporation
(MTDC), in order to support tourism and encourage the use of electric vehicles, is installing EV charging stations at its Boat Club and Grape Park resorts, both situated on the Gangapur dam backwaters near Nashik.
These two locations are part of a larger initiative to establish charging facilities at 49 MTDC resorts across Maharashtra. The MTDC plans to lease out the space to contractors who will be responsible for setting up, managing, operating, and maintaining these EV charging stations. The corporation has already sought Expressions of Interest (EoI) from interested firms for this project.
According to an MTDC official, there will be two charging stations at one location with the capacity to charge four vehicles at a time. The MTDC took this decision considering the rise in EV vehicles and to facilitate tourists coming to their properties.
The MTDC will lease out its spaces, around 50 square metres, to the contractors for a period of 10 years, which will later be extended for another 10 years.
In the Nashik region, the charging stations are to be set up at four locations, including two each in Nashik and Ahilyanagar districts. In Ahilyanagar, the EV charging stations are to be set up at the MTDC resorts in Bhandardara and Shirdi.
The maximum number of EV charging stations will be set up at 13 locations in the Nagpur region, followed by 10 locations in Ratnagiri/Sindhudurg, nine in Pune, seven in the Chhatrapati Sambhajinagar, and six in the Mumbai region.
The last date for filing EoIs is June 4.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 days ago
- Time of India
Pradhan Mantri Kisan Sampada Yojana boost: Centre clears Rs 6,520 crore for PMKSY expansion, 50 irradiation units and 100 food labs in pipeline
AI image The Union Cabinet has approved a total outlay of Rs 6,520 crore — including an additional Rs 1,920 crore — for the Central Sector Scheme Pradhan Mantri Kisan Sampada Yojana (PMKSY) during the ongoing 15th Finance Commission cycle (2021–22 to 2025–26), the government said in an official release said. The allocation includes Rs 1,000 crore to support the setting up of 50 multi-product food irradiation units under the Integrated Cold Chain and Value Addition Infrastructure (ICCVAI) scheme, and 100 NABL-accredited food testing laboratories (FTLs) under the Food Safety and Quality Assurance Infrastructure (FSQAI) component. An additional Rs 920 crore has been approved for 'sanctioning projects under various component schemes of PMKSY during the 15th FCC,' according to the release. Highlighting the scope of the investment, the Cabinet said 'The implementation of the proposed 50 multi-product food irradiation units is expected to create total preservation capacity ranging from 20 to 30 Lakh Metric Tonnes (LMT) per annum, based on the type of food products irradiated under these units.' The food irradiation units are aimed at increasing shelf life and reducing post-harvest losses, while the 100 new food labs — to be set up by private players — will ensure 'compliance with food safety standards and supply of safe foods,' the release said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Up to 70% off | Libas Purple Days Sale Libas Undo The schemes are demand-driven and will follow the Expression of Interest (EOI) route. 'The proposals received against the EOI would be approved after proper scrutiny as per eligibility criteria as per the extant scheme guidelines,' it added. Stay informed with the latest business news, updates on bank holidays and public holidays . Discover stories of India's leading eco-innovators at Ecopreneur Honours 2025


Indian Express
3 days ago
- Indian Express
BMC extends deadline on EOI to set up textile museum in Kalachowki
The Brihanmumbai Municipal Corporation's (BMC) plans to rope in an external agency to restore the old mill structures and develop a textile museum at Kalachowki in Byculla East has drawn feeble responses from eligible parties, nudging the civic body on Wednesday to extend the deadline on its Expression of Interest (EOI) by 15 days to August 13. Earlier on July 3, the BMC's heritage conservation cell department floated an Expression of Interest (EOI) inviting eligible and reputed public companies, charitable trusts or society to develop the textile museum. According to officials, the scope of work for the agency will include the redevelopment of the old structures earmarked for restoration as well as overlooking its operation and maintenance over the next 20 years. Estimated at a cost of between Rs 80 and 100 crore, the entire project cost will be borne by 'a reputed company or charitable trust or society' who can invest through their CSR model. However, civic officials said the project EOI has presently received response from only one external agency. Owing to insufficient response, the BMC has revised its EOI deadline upto August 13, in a corrigendum issued Wednesday. As per the initial tender, the deadline was expected to close for bidders on July 28. Sprawled over an area of 44,000 square metre within the compound of the India United Mill No. 2 and 3 at Kalachowki, the civic body in 2019 charted plans to redevelop the space as a textile museum. The project aimed at restoring the old mill buildings–whose history dates back as early as 1869–into a textile museum while also developing recreational spaces within the compound with the aim of educating the citizens about Mumbai's rich industrial history. So far, the BMC has launched work on the establishment of a musical fountain over a pond, murals, amphitheatre among other recreational spaces within the compound of the mill. With the first phase of works nearing completing, the civic body has now taken up the cudgels to restore the old, dilapidated structures into a museum.


Time of India
21-07-2025
- Time of India
In the past four years, 20,000 tourists have toured the historic building of the Brihanmumbai Municipal Corporation (BMC) headquarters
MUMBAI: Around 20,000 tourists from Mumbai and around the world have toured the historic BMC headquarters building from January 2021 to July 2025. The tours are organised jointly by the BMC, MTDC, and Khaki Tours every Saturday and the first meeting of the BMC was held on September 4, 1873, the current main building of the headquarters began operations on January 16, 1893. Since then, the municipal corporation has been effectively overseeing Mumbai's governance in the magnificent building, constructed in the Indo-Saracenic architectural style. You Can Also Check: Mumbai AQI | Weather in Mumbai | Bank Holidays in Mumbai | Public Holidays in Mumbai The design of the municipal headquarters was created by the renowned architect of the time, SW Stevens, and the construction was completed on July 31, 1893. The BMC building is a testament to the city's civic service and development.A total of six tours of the building are conducted every Saturday and Sunday. On Sunday, July 20, 2025, the tour welcomed its 20,000th tourist. During these tours, information about Mumbai's development stories, the rich history of the corporation, and the architectural detail of this grand building is provided.