logo
Kacheguda Railway Station to shine with new national facade lighting from June 9

Kacheguda Railway Station to shine with new national facade lighting from June 9

HYDERABAD: Kacheguda Railway Station is gearing up for the grand inauguration of its newly installed national facade lighting on June 9. The modern lighting system, developed at a cost of Rs 2.23 crore, will be inaugurated by Union Minister for Coal and Mines G Kishan Reddy.
The addition is expected to become a visual highlight and symbol of heritage for the over 100-year-old railway station. Equipped with modern passenger amenities, the station handles an average of 103 trains and 45,000 passengers per day.
The proposal for the facade was sanctioned by the Tourism Ministry, while the entire work has been executed by the Hyderabad Division of South Central Railway. The main objective is to enhance the architectural beauty, highlight the Indo-Gothic architecture and the station's rich heritage with the right illumination.
The type of luminaires used are the latest outdoor equipment, such as Outdoor Type RGB LEDs that are IP66 rated, with an inbuilt DMX decoder that supports the 512 DMX control system and secondary optics suitable for various lighting schemes.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Deputy CM to lay foundation for Akhanda Godavari Project foundation
Deputy CM to lay foundation for Akhanda Godavari Project foundation

Hans India

time24 minutes ago

  • Hans India

Deputy CM to lay foundation for Akhanda Godavari Project foundation

Rajamahendravaram: The foundation of the prestigious Akhanda Godavari Tourism Project aimed at showcasing the historical and cultural magnificence of Godavari region, will be formally held on June 19, announced by State Tourism, Culture, and Cinematography Minister Kandula Durgesh. The ground-breaking ceremony will be jointly performed by Deputy Chief Minister Konidela Pawan Kalyan and MP Daggubati Purandeswari, with the support of the Central government, he said. The Minister conducted a field visit on Saturday to oversee the arrangements for the upcoming event, inspecting key sites like Pushkar Ghat and theHavelock Bridge alongside district officials. He issued directions to ensure the smooth execution of the programme. Speaking on the occasion, Minister Durgesh said the project is being taken up with a sanction of Rs 97 crore under the SASCI 2024–25 (Special Assistance to States for Capital Investment) scheme. The works will span across Rajamahendravaram, Dowleswaram, Kadiyam, Kovvur, and Nidadavolu, aiming for completion before the 2027 Godavari Pushkaralu. He said that the project will significantly transform several locations in East Godavari district, adding new dimensions of beauty and improved tourist amenities. District Collector P Prasanthi stated that the 127-year-old Havelock Bridge, a heritage icon, will undergo beautification and modernisation. Proposed developments include waterfalls, glass bridges, a gaming zone, a space-themed park, an urban hot craft bazaar, hanging gardens, a hologram zoo, time travel experience zones, a rail museum, and an aquarium tunnel. These attractions are expected to position the location as a major tourism hotspot. The Pushkar Ghat will also be further developed, and both the ghat and the Havelock Bridge will be integrated into a single dynamic tourist destination, she added. Joint Collector S Chinna Rammudu, Municipal Commissioner Ketan Garg, RDO R Krishna Naik, Rajamahendravaram City MLA Adireddy Srinivas,and District TourismOfficer P Venkatachalam participated.

RBI Cuts Repo Rate: Major Banks Slash Lending Rates; Know Objective Behind It
RBI Cuts Repo Rate: Major Banks Slash Lending Rates; Know Objective Behind It

India.com

time28 minutes ago

  • India.com

RBI Cuts Repo Rate: Major Banks Slash Lending Rates; Know Objective Behind It

RBI Repo Rate Cut: In a bid to boost economic momentum, several major banks have followed the Reserve Bank of India's (RBI) lead after it cut the repo rate by 50 basis points. Among them, Punjab National Bank (PNB), Bank of India, and UCO Bank have announced reductions in their lending rates. The RBI's move is aimed at making borrowing easier and more affordable for both individuals and businesses. Wasting no time, Punjab National Bank was quick to respond, bringing down its repo-linked lending rate from 8.85% to 8.35%, setting the tone for others to follow. Bank of India Repo Rate: Bank of India responded to the RBI's repo rate cut by lowering its repo-linked lending rate from 8.85% to 8.35%, as disclosed in a stock exchange filing. However, the bank chose to keep its base rate and marginal cost of funds-based lending rate (MCLR) unchanged. UCO Bank Reduces MCLR Across All Loan Tenures Taking a slightly different path, UCO Bank opted to reduce its MCLR by 10 basis points across all loan tenures. This move, effective from June 10, aims to ease borrowing costs for various types of loans, including home and personal loans. Specifically, UCO Bank trimmed its overnight MCLR from 8.25% to 8.15%, the one-month rate from 8.45% to 8.35%, and the three-month rate from 8.6% to 8.5%. The six-month and one-year MCLRs were also adjusted to 8.8% and 9%, respectively. Bank of Baroda Repo Rate: Adding to the trend, Bank of Baroda announced a 50 basis point cut in its repo-linked lending rates for select loan tenures. These rate revisions follow the RBI's latest decision—announced by the Monetary Policy Committee led by Governor Sanjay Malhotra—to lower the repo rate, the key policy rate at which the central bank lends to commercial banks. The broader goal: to ease borrowing costs and stimulate economic activity. Objective Behind Cut In Repo Rate The objective behind the rate cut is to energise the economy by encouraging spending and investment through cheaper loans. In addition to the repo rate cut, the RBI also reduced the Cash Reserve Ratio (CRR) by 100 basis points, from 4 per cent to 3 per cent. Repo Rate Reduction In Four Phases This reduction will be rolled out in four phases and is expected to inject Rs 2.5 lakh crore of liquidity into the banking system. The CRR is the portion of bank deposits that must be maintained with the RBI, and lowering it allows banks to lend more. (With Inputs From IANS)

Chhattisgarh high court declines to intervene in tata projects and CHiPS bank guarantee dispute
Chhattisgarh high court declines to intervene in tata projects and CHiPS bank guarantee dispute

Time of India

time29 minutes ago

  • Time of India

Chhattisgarh high court declines to intervene in tata projects and CHiPS bank guarantee dispute

RAIPUR: The Chhattisgarh high court disposed of a writ petition filed by Tata Projects Limited, directing the company to seek remedy before the Commercial Court. The petition concerned the encashment of a performance bank guarantee of Rs 167.46 crore by the Chhattisgarh Infotech Promotion Society (CHiPS), the nodal agency for driving IT growth and implementing IT and e-Governance initiatives in the state. A division bench of Justice Narendra Kumar Vyas and Justice Amitendra Kishore Prasad heard the petition filed by Tata Projects. The company sought restoration of the status quo ante, asking for the return of the Rs 167.46 crore to State Bank of India and the issuance of an identical bank guarantee. Alternatively, Tata Projects requested CHiPS to deposit the amount in an interest-bearing account until the dispute's resolution. According to court records, CHiPS issued a Request for Proposal (RFP) for the selection of a Master System Integrator (MSI) for the BharatNet Phase-II Project in Chhattisgarh. A dispute arose between Tata Projects and CHiPS during the commercial contract. Previously, Tata Projects filed a writ petition, in which a single bench of the high court on 2 July 2024, granted interim protection, restraining respondents from encashing the performance bank guarantee. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like American Investor Warren Buffett Recommends: 5 Books For Turning Your Life Around Blinkist: Warren Buffett's Reading List Undo This writ petition was later disposed of on 30 April 2025, with the court re-delegating the parties to approach the Commercial Court. Subsequently, Tata Projects filed an application under Section 9 of the Arbitration and Conciliation Act, 1996. The Commercial Court, on 3 May 2025, ordered an interim status quo regarding the invocation of the bank guarantee. However, after the respondents filed their reply, the Commercial Court disposed of the application on 6 May 2025, vacating the status quo order. The initiation of the bank guarantee encashment process led Tata Projects to approach the highcourt. Senior Counsel Kishore Bhaduri, appearing for Tata Projects, argued that CHiPS's conduct was fraudulent and high-handed, misleading the court and misusing its power by attempting to invoke the bank guarantee. Counsel for the respondents and the state argued that the writ petition was not maintainable, as Tata Projects had remedies available under Section 9 of the Arbitration and Conciliation Act, 1996, or under the Chhattisgarh Madhyashtham Adhikaran Act, 1983. The high court observed that an arbitration clause existed in the agreement and that Tata Projects already approached the Commercial Court. The court ruled that the writ petition was not maintainable at this juncture. However, it granted Tata Projects the liberty to pursue statutory remedies before the Commercial Court. The court also clarified that the respondents were free to raise objections regarding the maintainability of any application. The high court directed the Commercial Court to consider and decide any interim application or application under Section 9 of the Arbitration and Conciliation Act, 1996, filed by the petitioner expeditiously and in accordance with the law. The high court also made it clear that it did not express any opinion on the merits of the case, leaving it to the Commercial Court to decide independently.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store