logo
Going green: Power Cement to install 7.5MW wind plant

Going green: Power Cement to install 7.5MW wind plant

In a significant step toward sustainability, Power Cement Limited (POWER) has announced plans to set up a 7.5MW wind power project, which is expected to go live by FY2026.
The listed cement maker shared the development during its corporate briefing session on Wednesday.
The project will utilise Goldwind turbine with a capacity of 7,500 kW and will follow a rental model, similar to the company's existing solar agreements.
'Expected completion is targeted within FY2026,' the company stated.
Upon the project's completion, wind energy would account for 11% of Power Cement's energy mix.
The company already generates 34% and 6% of its energy from WHRS (Waste Heat Recovery System) and solar, respectively. Whereas, the remaining 60% comes from HESCO.
Founded in 1981, Power Cement Limited stands as the flagship Company of Arif Habib Group, a prominent financial and industrial conglomerate. The factory site of the company is located at Motorway M-9, Nooriabad, Sindh.
The company was previously known as Al-Abbas Cement Limited until its acquisition in 2010 by the Arif Habib Group.
Presently, the company has three manufacturing lines, with a cumulative nameplate clinker production capacity of 10,700 TPD, with total annual capacity of 3.21 million tons.
The company is one of the largest players in Pakistan's South zone with a total annual cement production capacity of 3.37 million tons, 11,235 TPD.
The announcement aligns with a broader industry shift in Pakistan toward renewable energy as companies look to cut energy costs and reduce reliance on the national grid.
Last month, Thatta Cement Company Limited completed and commissioned a 4.8MW wind power project at its plant in Thatta, Sindh.
Earlier this month, Ali Asghar Textile Mills Limited (AATM), a former textile unit turned logistic service provider, informed it was developing a 1,00KW (1MW) solar power project, which has now entered the execution phase.
In March, Tariq Corporation Limited announced plans to set up a 200KW solar power system at its facility.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Dar for meeting SAP uplift targets in timely manner
Dar for meeting SAP uplift targets in timely manner

Business Recorder

time3 days ago

  • Business Recorder

Dar for meeting SAP uplift targets in timely manner

ISLAMABAD: Deputy Prime Minister/ Foreign Minister Ishaq Dar chaired the 46th Steering Committee meeting of the Sustainable Development Goals Achievement Programme (SAP). The meeting was attended by key stakeholders, including federal ministers for Inter-provincial Coordination, Planning and Development, Power, Parliamentary Affairs, SAPM Tariq Bajwa; federal secretaries; Members of the National Assembly, and representatives of provincial governments. The meeting focused on reviewing the utilisation of savings and available funds with executing agencies, and streamlining implementation to ensure timely completion of ongoing schemes. 'Resources utilized in best interest of citizens' The DPM/FM emphasised the importance of fully utilising the allocated resources before the close of the current financial year, underscoring the need to deliver results within the stipulated timelines. He directed all stakeholders to expedite efforts to ensure timely development targets. The DPM/FM noted the government's resolve to aligning development efforts with the Sustainable Development Goals (SDGs), for inclusive and meaningful progress that reflects the development priorities of the nation. Copyright Business Recorder, 2025

Pakistan's solar ‘revolution'
Pakistan's solar ‘revolution'

Business Recorder

time5 days ago

  • Business Recorder

Pakistan's solar ‘revolution'

Pakistan, home to 240 million people, faces an energy paradox: surplus generation capacity alongside persistent electricity shortages. Despite an installed capacity of 44,000 megawatts (MW), nearly 40% of households endure over six hours of daily outages, costing the economy $18 billion annually in lost GDP. At the core of this crisis is a dysfunctional system dominated by Independent Power Producers (IPPs), which claim Rs. 900 billion annually in capacity payments, 64% of total costs for underutilized fossil fuel plants. These contracts, which guarantee payments regardless of actual electricity usage, have driven tariffs up by 75% since 2020, making Pakistani industries 35% less competitive than regional peers. Meanwhile, transmission losses of 17–20%, twice the global average prevent surplus power from reaching consumers. Yet, a promising solution lies in plain sight: solar energy. Pakistan's solar potential exceeds 2,900 gigawatt-hours annually enough to power the country 100 times over. However, solar contributes only 4% to the energy mix, despite its potential to deliver 40,000 MW by 2035. The path forward lies in decentralized rooftop systems rather than mega solar parks. Already, over 1,500 MW of rooftop solar has been installed, spurred by a 300% surge in net metering adoption in 2022. Scaling this to 12,000 MW by 2030 could reduce oil imports by $4 billion annually and create 500,000 jobs, according to the International Renewable Energy Agency (IRENA). A 2022 pilot in Punjab showcased the potential: rooftop solar redirected to industrial zones via wheeling agreements cut energy costs by 30% and boosted exports by $500 million. For every 1 MW of installed solar, 25–30 jobs are generated. If export zones adopt decentralized energy, GDP growth could rise by 2–3% annually, drawing foreign investment and expanding value-added exports. Replacing just 10% of fossil energy with solar would cut CO? emissions by 28 million tons annually, the equivalent of planting 650 million trees. Realizing this vision requires a decisive policy action. Redirecting capacity payments toward grid upgrades and rooftop subsidies is vital. Bangladesh's solar home system, which reached 20 million people, and India's 30% rooftop subsidy model provide successful blueprints. Bureaucratic delays remain a hurdle, net metering approvals can take up to six months, while grid modernization will require $3–5 billion. But with 80% of rooftop installations already driven by households and businesses, policy support, not public funding, is the missing piece. The numbers are compelling. A 20% shift to solar could reduce circular debt by Rs. 500 billion annually by 2027, according to IMF estimates. Pakistan's Rs. 2.6 trillion circular debt could instead finance 10 Mangla-sized hydropower projects decentralized solar presents a faster, more cost-effective alternative. As global markets shift toward sustainability, Pakistan stands at a crossroads. Continuing with the broken IPP model risks a deeper economic decline. Embracing decentralized solar could transform rooftops into revenue-generating assets, stabilize the grid, and reignite exports. With over 300 sunny days annually, Pakistan's energy future could be not just stable, but radiant. The current tiered tariff system penalizes higher consumption, hindering industrial growth. Moving to inverted slabs where per-unit costs decline with increased use could save a textile unit, consuming 25,000 kWh/month up to Rs. 375,000. This aligns with global best practices like Japan's 'Negawatt Trading,' where energy efficiency improves without compromising output. Such reforms could cut energy intensity by 12% and boost production by 8%. Smart integration of rooftop solar (targeting 12,000 MW by 2030), hydropower (25% baseload), and IPPs (used for peak loads) through advanced grids is essential. Brazil's smart grid model reduced transmission losses from 17% to 8%, saving $200 million annually, a strategy Pakistan could replicate. Pakistan must also reassess costly, loan-heavy projects like the ADB-funded Kanjhar Lake Floating Solar Park, which risk locking the country into debt and dependency on imported tech. Instead, policies should encourage domestic private investment in rooftop solar and land-based solar parks. Tax holidays for local solar manufacturing, streamlined land acquisition, and deregulated energy pricing can mobilize local capital for scalable, self-reliant projects. Rooftop solar requires no land and offers a 3-5-year payback period. Prioritizing it over flood-prone reservoirs could redirect $3 billion annually from oil imports into the domestic economy. With 80% of rooftop installations already privately financed, improving policy could rapidly accelerate deployment. Fast-tracking net metering approvals to 15 days and offering India-style 30% subsidies could attract $4.8 billion in private investment by 2030. Delaying action could result in $18 billion/year in GDP losses and missed climate targets. A phased rollout of smart meters by 2025, 8,000 MW of solar by 2028 could reduce CO? emissions by 28 million tons by 2030, while curbing circular debt and stabilizing electricity tariffs. Fixed monthly taxes of Rs. 5,000–10,000 on solar households would unfairly burden low-income families and deter adoption. Pakistan must prioritize green industrial zones powered by decentralized solar and equipped with digital grid technologies such as smart metering. Rather than relying on IMF or ADB loans, policies should promote domestic private investment. Tax incentives for renewable-powered industries, simplified project approvals, and ESG mandates for exporters can draw local capital. Emulating China's digital public infrastructure with real-time energy trading and AI-based demand forecasting would empower private players while reducing fossil fuel dependence. Banks should offer 2–3% low-interest loans with flexible repayment plans to enable households and SMEs to install solar systems. With extreme seasonal temperatures above 52°C in summer and below freezing in winter, the demand for energy-intensive appliances is rising. Household-level solar can reduce pressure on the national grid in summer and lower gas use in winter, enhancing energy resilience. To further mobilize capital, Pakistan could issue green bonds for industrial zones, supported by risk-sharing tools like partial credit guarantees. Deregulating energy pricing in solar zones would increase returns, following India's model that attracted $42 billion in private renewable investment since 2020. Globally, green zones in regions like Guangdong, China, have cut emissions by 28 million tons while boosting exports. With circular debt at Rs. 2.6 trillion, empowering private stakeholders through digital innovation and regulatory clarity is the most viable path to energy security, economic revival, and job creation—without adding to fiscal stress. As the fifth most populous country, with over 60% of its population under 40, Pakistan has a demographic edge. This digitally savvy youth is already driving IT exports, which surged in 2023–24. With the right policies, Pakistan could become a hub not only for IT and digital services but also for blockchain development and cryptocurrency mining. By tapping its abundant renewable energy—solar, hydro, and wind - Pakistan can attract global blockchain investments and emerge as a player in the decentralized digital economy. Copyright Business Recorder, 2025

Motorways in Sindh top priority of federal govt: Aleem
Motorways in Sindh top priority of federal govt: Aleem

Business Recorder

time26-05-2025

  • Business Recorder

Motorways in Sindh top priority of federal govt: Aleem

KARACHI: Federal Minister for Communications Abdul Aleem Khan has said that the construction of motorways in Sindh is a top priority of the government, and the M-6 and M-10 motorways will be launched simultaneously, as the M-6 is Pakistan's lifeline, which was unfortunately neglected by previous governments. Talking to the media along with Arif Habib chairman Arif Habib Group here on Monday, he said that a motorway will be incomplete in its utility without being connected to the Ports and both the M-6 and M-10 will be linked to the Karachi Port to ensure their full functionality. Highlighting the significance of the M-6 Project, the minister informed that it is a nearly Rs 400 billion initiative comprising upon five sections, each approximately kilometres long. 'There is no better opportunity for investment than in this project,' he pointed out. Aleem Khan said that financing has already been secured for two sections while discussions for the remaining three are ongoing. 'We will finalise the feasibility report and present it to the Prime Minister within the next 15 days,' he added. The federal minister further said that the motorways from Karachi to Hyderabad and from Hyderabad to Sukkur will be completed as early as possible while work on the N-25 Highway from Karachi to Quetta is also scheduled to begin later this year. 'Karachi's challenges are not just provincial, they are national issues and we will address them on a priority,' he emphasized. Replying to the questions, Khan stressed that his focus is on delivering progress rather than engaging in blame games. 'My effort is to prioritise the launch of motorway projects in Sindh; similarly, we are committed to completing the Kaghan-Naran motorway,' he said. He informed that the National Highway Authority (NHA) has recorded unprecedented growth in revenue over the current fiscal year and attaining the target from Rs 64 billion to Rs 110 billion while this additional income will be utilised into improving road infrastructure and constructing new motorways. To ensure road safety, he said that strict measures are being implemented against dangerous driving on motorways. 'Drivers exceeding 150 km/h are not only being fined but also facing FIRs,' he added. Mandatory use of M-Tags is helping reduce long queues, and staffing shortages in motorway police are being addressed,' Aleem Khan said. Regarding his visit to Karachi, the minister mentioned that he, along with the Federal Secretary Communications and Chairman of the NHA held meeting with the Chief Minister of Sindh and assured him of full support from his ministry. He also held a highly productive meeting with the business community led by Arif Habib, where investors expressed interest in participating in the development of Sindh's motorways and road networks. Additionally, he noted that a joint team is being formed to focus on additional options for the Lyari Expressway in Karachi, including improvements to interchanges and exploration of further development projects. Copyright Business Recorder, 2025

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store