logo
Nine collisions in one year at accident blackspot

Nine collisions in one year at accident blackspot

Yahoo10-03-2025

There have been nine accidents in one year at a new roundabout on the outskirts of a Norfolk town, figures obtained by the BBC have shown.
The roundabout on the A146 near Loddon was installed in the spring of 2022, replacing a staggered crossroads.
Statistics from Norfolk Police showed a total of 14 accidents since January 2022, with the vast majority taking place during 2024.
The leader of Norfolk County Council, Kay Mason Billig, said larger road signs would be installed in the near future, but she had been left surprised by the recent increase.
"I have also spoken with the police to try to ascertain whether there is a common denominator for these incidents," she said.
"And it appears there are a multitude of reasons, so it is hard to understand why this is happening.
"Nearly all the accidents occur on the Beccles side of the roundabout. There doesn't seem to be any issue with the other approaches."
The figures from Norfolk Police showed that one of the 2024 accidents resulted in a serious injury, another involved slight injuries as well as seven where no-one was hurt.
In 2023 there were two collisions - one between a car and a bicycle, the other a single car; while in 2022 there were two non-injury car collisions and another between a car and a cyclist.
Ms Mason Billig, Conservative, said the council was also looking at the lighting on the approach signs, as well as at the roundabout itself.
"If rumble strips on the road surface, which are being trialled in Chedgrave, are successful, we could look at installing them here as well.
"In the meantime, we just have to appeal to drivers to please slow down."
Follow Norfolk news on BBC Sounds, Facebook, Instagram and X.
New signs and lights for accident blackspot
Norfolk County Council

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Canadian GP Faces Wildfire Threat Ahead of F1 Race Weekend
Canadian GP Faces Wildfire Threat Ahead of F1 Race Weekend

Newsweek

time3 days ago

  • Newsweek

Canadian GP Faces Wildfire Threat Ahead of F1 Race Weekend

Based on facts, either observed and verified firsthand by the reporter, or reported and verified from knowledgeable sources. Formula One's upcoming Canadian Grand Prix faces a significant threat from last week's wildfires. However, the threat is not from the fire but from the smoke being emitted that has blanketed large areas. With more than 200 locations said to be affected, the air quality worsened to an alarming level. The situation led many to question whether F1 would go on with the race, considering the smoke from the wildfires that covered the circuit last week. Poor air quality could affect breathing and even cause other respiratory illnesses. The scale of the disaster is evident from the BBC's report, which states that smoke from the wildfires caused orange skies in the United Kingdom. Speaking of the Grand Prix in Canada, which is scheduled for this weekend, a report from confirmed that there are no plans in place to cancel the race, considering the present situation. Lando Norris of Great Britain driving the (4) McLaren MCL38 leads Max Verstappen of the Netherlands driving the (1) Oracle Red Bull Racing RB20 during the F1 Grand Prix of Canada at Circuit Gilles Villeneuve... Lando Norris of Great Britain driving the (4) McLaren MCL38 leads Max Verstappen of the Netherlands driving the (1) Oracle Red Bull Racing RB20 during the F1 Grand Prix of Canada at Circuit Gilles Villeneuve on June 9, 2024 in Montreal, Canada. MoreAccording to IQAir, the current air quality in Montreal is 97 US AQI, which is forecast to decrease below 60 from Thursday. Thus, F1 teams will most likely adhere to their schedules and arrive in Canada on Wednesday. Track action will commence on Friday with Free Practice 1 and 2. The third practice session will take place on Saturday, followed by the qualifying session. The Grand Prix will be held on Sunday. Both McLarens are expected to be the favorites, especially given the 1-2 finish in the Spanish Grand Prix. However, Red Bull's Max Verstappen is also expected to be in the mix. The 2025 championship leader, Oscar Piastri, has showcased stellar performances so far, and his flawless performance in the previous round at Barcelona suggests there's more to come. Speaking after the race in the post-race interview, Piastri said: "I think the pace was really good. We could turn it on when we needed to and just very proud of the work we've done this weekend. It wasn't the best first practice and then we got our stuff together and, yeah, it's a nice way to bounce back from Monaco. So, been a superb weekend." Speaking on his fifth win of the season at the Spanish GP, he said: "Hard to complain. Yeah, very hard to complain. It's been a great year and this weekend's been exactly the kind of weekend I was looking for. You know, we executed everything we needed to when it counted and that's all you can ask for. So, the team gave me a great car once again. "It's a lot of fun winning races at the moment. So, I've been enjoying it, and I hope the team are too. So, thanks to the crowd for being out here. It's been a great weekend, a lot of support out here. A lot of traffic as well, but that's the sign of a lot of fans. So, it's nice to be here."

Roads near port to close for border changes
Roads near port to close for border changes

Yahoo

time4 days ago

  • Yahoo

Roads near port to close for border changes

Some roads around the Port of Dover will be closed from Monday so works can be carried out ahead of the new entry/exit system (EES) being installed at the port. The port says that the work to be carried out by National Highways will be carried out at the Union Street junction, close to the port's entrance. The first phase will begin on 9 June and run until Friday 11 July, which will mean drivers can only access Union Street from the A20. A diversion route will be put in place via Wellesley Road for anyone who wants to return to the A20. A second phase will then begin on 14 July for two-and-a-half months until the end of September. During this phase, there will be a full closure of Union Street and the port says there will be a signed diversion via Wellesley Road for the full duration. No works will take place throughout regatta weekend on 12 and 13 July, the port says. Once completed, there will be two new lanes from Union Street to turn right onto the A20 and a new left-turn option. The BBC understands the new system will begin at the Port of Dover from 1 November. EES will replace current passport stamping, requiring visitors from outside the European Union to register fingerprints, a photo and passport details to enter the bloc. The system was due to begin in November 2024 but was delayed as the technology was not ready in time. Follow BBC Kent on Facebook, on X, and on Instagram. Send your story ideas to southeasttoday@ or WhatsApp us on 08081 002250. Long-awaited EU border system expected for October Port of Dover was ready for new border checks - chief UK to spend £10.5m on new EU border checks Port of Dover

Roads near port to close for border changes
Roads near port to close for border changes

Yahoo

time4 days ago

  • Yahoo

Roads near port to close for border changes

Some roads around the Port of Dover will be closed from Monday so works can be carried out ahead of the new entry/exit system (EES) being installed at the port. The port says that the work to be carried out by National Highways will be carried out at the Union Street junction, close to the port's entrance. The first phase will begin on 9 June and run until Friday 11 July, which will mean drivers can only access Union Street from the A20. A diversion route will be put in place via Wellesley Road for anyone who wants to return to the A20. A second phase will then begin on 14 July for two-and-a-half months until the end of September. During this phase, there will be a full closure of Union Street and the port says there will be a signed diversion via Wellesley Road for the full duration. No works will take place throughout regatta weekend on 12 and 13 July, the port says. Once completed, there will be two new lanes from Union Street to turn right onto the A20 and a new left-turn option. The BBC understands the new system will begin at the Port of Dover from 1 November. EES will replace current passport stamping, requiring visitors from outside the European Union to register fingerprints, a photo and passport details to enter the bloc. The system was due to begin in November 2024 but was delayed as the technology was not ready in time. Follow BBC Kent on Facebook, on X, and on Instagram. Send your story ideas to southeasttoday@ or WhatsApp us on 08081 002250. Long-awaited EU border system expected for October Port of Dover was ready for new border checks - chief UK to spend £10.5m on new EU border checks Port of Dover

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store