
Farmers oppose Ajit Pawar's loan recovery proposal for Nashik district cooperative bank
Nashik: Farmers in Nashik, who are defaulters of the Nashik District Central Cooperative Bank, rejected the loan recovery proposal made by state finance minister Ajit Pawar. Instead, they demanded a complete loan waiver for marginal farmers and a complete interest waiver for others.
Arjun Borade, the district unit chief of the Shetkari Sanghatna, said the proposal made by Ajit Pawar, who is also the deputy chief minister, did not align with the farmers' demands. The farmers have formulated their proposal, which will be presented to govt. "We are keeping it very simple. Our demand is a complete loan waiver for marginal farmers and a complete interest waiver for all others who will settle their accounts," said Borade.
A meeting of the farmers was recently held, and it was attended by Kailas Borse, the state president of 938 Tribal Cooperative Societies, and others. "Marginal farmers should be given complete relief from loan and interest, while other farmers should be given the opportunity to clear their principal in 10 equal monthly instalments," said Borade.
Borade added the representatives were unanimous in their decision on dealing with govt against the backdrop of farmers being hit repeatedly by nature's vagaries and intervention by govt for its political advantage that deprived farmers of good market prices for the produce at opportune times.
Deputy chief minister Ajit Pawar, in a recent meeting with farmers' representatives and agriculture minister Manikrao Kokate in Mumbai, proposed that loans up to Rs 1 lakh would incur 2% interest, and up to Rs 5 lakh would have 3% interest. Loans up to Rs 10 lakh would be charged 4% interest, and loans beyond Rs 10 lakh would be charged 5% interest. "The proposal by the deputy CM is not in line with the assurances of interest and loan waivers that were promised to the farmers before the election and at several meetings held with the farmers. Therefore, farmers will stand by their demand," said Borade.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


India.com
16 minutes ago
- India.com
Meet World's Richest Dog: Travels In Private Jet, Has 27 Employees, Bought Mansion From Madonna—His Net Worth Will Blow Your Mind
photoDetails english 2913466 Updated:Jun 09, 2025, 08:37 PM IST Meet Gunther VI, the World's Richest Dog 1 / 8 This German Shepherd named Gunther VI is wealthier than most billionaires' pets. With a jaw-dropping net worth of 400 million dollars (Rs 3,356 crore), Gunther lives a life of extraordinary luxury — from private jets to personal staff, he's no ordinary pooch. It All Started With a Countess's Will in 1992 2 / 8 Gunther's rise to riches began when Countess Karlotta Liebenstein, a German millionaire, left her entire $80 million estate to her dog, Gunther III, after her son died without heirs. Her will stipulated that the fortune must benefit the dog and his future lineage — setting the stage for an animal empire. Fortune Grew From $80M to $400M 3 / 8 As per media reports, The responsibility to manage Gunther's wealth was handed to Maurizio Mian, a family friend and entrepreneur. Over the years, strategic investments in real estate, stocks, and businesses helped multiply the wealth fivefold. Today, Gunther VI, the great-grandson of the original heir, enjoys the compounded riches. Bought a Mansion from Madonna 4 / 8 Gunther's fortune includes a 7.5 million dollars mansion in Miami, once owned by pop icon Madonna. Purchased under the dog's name, the mansion was sold later for a hefty profit of 29 million dollars, showing that Gunther's real estate portfolio is managed with business-like precision. Jet-Setting Dog With Global Lifestyle 5 / 8 Gunther doesn't just stay in one place — he travels across Europe and the U.S., flying in private jets and staying at exclusive villas and luxury hotels. His social media-worthy lifestyle includes visits to beaches, ski resorts, and yachts, making him one of the most well-traveled dogs in the world. 27 Employees Work for Him – Yes, Really 6 / 8 Gunther's empire runs like a corporation. According to multiple reports, he employs 27 full-time staff—including trainers, chefs, housekeepers, chauffeurs, and publicists. Every aspect of his life is handled by professionals, ensuring he lives like true royalty. Netflix Documentary Reveals His Crazy Life 7 / 8 Gunther's lavish and mysterious life caught the attention of Netflix, which released a docuseries titled "Gunther's Millions". The show dives into the eccentric lifestyle, financial dealings, and controversies surrounding the dog's estate — turning his story into a global media sensation. More Than a Dog 8 / 8 Gunther VI isn't just the world's richest dog—he's also a symbol of how money, trust, and legacy can be passed down in unexpected ways. With a wealth empire built on a will, smart investments, and meticulous management, Gunther's story shows that even a dog can outlive and out-earn many millionaires.


Time of India
16 minutes ago
- Time of India
After SC nod, administration beginsland survey for Banke Bihari corridor
Agra: The local administration in Mathura has started a land survey for the proposed Banke Bihari corridor on Monday, after the Supreme Court's approval. The move comes amid ongoing protests by local residents, including the Goswami community, whose members are considered the temple's 'sevayats' -- hereditary priests who manage daily rituals and other temple affairs. Banke Bihari is regarded as one of the most revered Krishna shrines in north India, attracting lakhs of pilgrims. Mathura district magistrate, CP Singh, said, "The Banke Bihari temple corridor project aims to offer people a safe and dignified 'darshan' experience of the deity. Govt has assured that the rights and traditions of the temple's 'sevayats' will remain untouched, with the state focusing only on development of the external infrastructure. The proposed corridor will resolve long-standing issues of overcrowding and stampedes. It will also offer facilities like clean drinking water, toilets, rest areas, medical centres and lockers." The land survey was conducted by a four-member team who inspected the area around the temple complex. Sources within the local administration told TOI that to ensure minimal inconvenience for local residents, an active search is underway for possible resettlement spots within Vrindavan. On May 15, the SC bench of Justices Bela M Trivedi and SC Sharma permitted the state govt to proceed with a 'Rs 500 crore redevelopment plan', which entails acquiring almost five acres of land, using temple funds. The SC ruling came amid protests from the Goswami community and local residents, who have opposed both the corridor project and establishment of the Banke Bihari Temple Trust. Gyanendra Kishor Goswami, a member of the temple management, said, "The proposed corridor and Banke Bihari Trust would destroy the temple's original and ancient form. Govt has adopted a dictatorial attitude towards our demands. Our protest will continue." The move to redevelop the place came up after a stampede-like incident on Janmashtami in 2022, that claimed two lives. In Sept 2023, Allahabad HC instructed the state govt to implement a corridor plan for improved crowd management and safety. Officials claimed that all the stakeholders were consulted, but 'sevayats' and local residents alleged they were excluded from the planning process. Agra: The local administration in Mathura has started a land survey for the proposed Banke Bihari corridor on Monday, after the Supreme Court's approval. The move comes amid ongoing protests by local residents, including the Goswami community, whose members are considered the temple's 'sevayats' -- hereditary priests who manage daily rituals and other temple affairs. Banke Bihari is regarded as one of the most revered Krishna shrines in north India, attracting lakhs of pilgrims. Mathura district magistrate, CP Singh, said, "The Banke Bihari temple corridor project aims to offer people a safe and dignified 'darshan' experience of the deity. Govt has assured that the rights and traditions of the temple's 'sevayats' will remain untouched, with the state focusing only on development of the external infrastructure. The proposed corridor will resolve long-standing issues of overcrowding and stampedes. It will also offer facilities like clean drinking water, toilets, rest areas, medical centres and lockers." The land survey was conducted by a four-member team who inspected the area around the temple complex. Sources within the local administration told TOI that to ensure minimal inconvenience for local residents, an active search is underway for possible resettlement spots within Vrindavan. On May 15, the SC bench of Justices Bela M Trivedi and SC Sharma permitted the state govt to proceed with a 'Rs 500 crore redevelopment plan', which entails acquiring almost five acres of land, using temple funds. The SC ruling came amid protests from the Goswami community and local residents, who have opposed both the corridor project and establishment of the Banke Bihari Temple Trust. Gyanendra Kishor Goswami, a member of the temple management, said, "The proposed corridor and Banke Bihari Trust would destroy the temple's original and ancient form. Govt has adopted a dictatorial attitude towards our demands. Our protest will continue." The move to redevelop the place came up after a stampede-like incident on Janmashtami in 2022, that claimed two lives. In Sept 2023, Allahabad HC instructed the state govt to implement a corridor plan for improved crowd management and safety. Officials claimed that all the stakeholders were consulted, but 'sevayats' and local residents alleged they were excluded from the planning process.


Time of India
17 minutes ago
- Time of India
Rudra Global plans to set up 30-mw renewable energy projects in Gujarat
Steel maker Rudra Global Infra is looking to set up 30-megawatt renewable energy projects in Gujarat, mainly for captive usage. The company is also in the process of setting up a 3.3-megawatt wind energy project at a cost of over Rs 32 crore, Rudra Global Infra said in an exchange filing. "The company has received the Bank Sanction Letter, approving approximately 75 per cent of the funding for the 3.3 MW wind power project," it added. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like She Was The Dream Girl In The 80s, This Is Her Recently Learn More Undo In addition to wind energy, the company is also actively planning to undertake solar power projects and/or other equivalent renewable energy projects totalling 25-30 MW, the company said. The total project cost of the project being set up in Gujarat is Rs 32.28 crore. Live Events The installation of the 3.3 MW wind turbine is progressing as planned and is expected to be operational by December 2025. It is projected to generate approximately 1.1 crore units of power annually. This will be the fourth wind turbine installed by the company, enhancing its total renewable energy capacity to 8 MW, capable of producing approximately 1.7 crore units per annum. The company further said it remains fully committed to maximising the use of renewable energy sources. Rudra Global Infra Products Ltd, earlier known as MDICL, manufactures thermo-mechanically treated bars and mild steel (MS) billets.