logo
MHADA appoints Keystone Realtors to redevelop 25 buildings in GTB Nagar, Mumbai

MHADA appoints Keystone Realtors to redevelop 25 buildings in GTB Nagar, Mumbai

Time of India01-07-2025
NEW DELHI:
Keystone Realtors
has received the letter of acceptance (LOA) for the redevelopment of 25 buildings of Sindhi refugees at Guru Teg Bahadur Nagar (GTB Nagar) in Sion Koliwada,
Mumbai
, being undertaken in collaboration with Maharashtra Housing and Area Development Authority (
MHADA
).
Spread across a plot area of approximately 11.19 acres (45,308 sq meters), this redevelopment will benefit over 1,400 families, and is expected to unlock a saleable area of approximately 20.7 lakh sq feet, with an estimated gross development value (GDV) of ₹4,521 crore.
Boman Irani, chairman and managing director of the company said, "We are honoured to have received the LOA for the redevelopment of GTB Nagar in Sion; a project that carries the hopes of 1,200 society members and 200 slum residents."
Constructed in 1958 for post-independence migrants, the buildings were declared unsafe by the Brihanmumbai Municipal Corporation (BMC) in 2020 and were subsequently demolished. Following this, the affected residents had to seek alternative accommodation on their own.
The state cabinet, in its meeting held on 14 February 2024, approved the redevelopment proposal through the appointment of a Construction and Development Agency under Regulation 33(9) of the Development Control and Promotion Regulations (DCPR). A corresponding Government Resolution was issued on 23 February 2024, designating MHADA as the special planning authority for the execution of this project.
As per the proposal submitted by MHADA, a minimum floor space index (FSI) of 4.5 will be available including fungible area, ensuring each eligible family receives a free home measuring 635 sq. ft. Additionally, MHADA will receive 25,700 sq meters of built-up space as housing stock.
Sanjeev Jaiswal, vice president and CEO, MHADA said that this is the first redevelopment project being executed by MHADA on private land through an appointed construction and development agency. He termed it a historic and model redevelopment initiative.
A 5 to 7-member committee comprising society representatives will be constituted to oversee and review project updates.
Post-redevelopment, MHADA will provide five years of maintenance charges and monthly rent of ₹20,000 until completion.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

SC okays redevelopment of Mumbai's Motilal Nagar under C&DA model
SC okays redevelopment of Mumbai's Motilal Nagar under C&DA model

Time of India

time3 hours ago

  • Time of India

SC okays redevelopment of Mumbai's Motilal Nagar under C&DA model

NEW DELHI: The Supreme Court on Monday upheld the Maharashtra Housing and Area Development Authority 's ( MHADA ) decision to redevelop Mumbai 's Motilal Nagar under the Construction and Development Agency (C&DA) model, dismissing legal challenges filed by local residents' associations. A bench of Justices Vikram Nath and Sandeep Mehta rejected a special leave petition filed by three petitioners - Motilal Nagar Jankalyankari Samiti, Motilal Rahivasi Vikas Sangh, and Gaurav Arun Rane- challenging the Bombay High Court decision that had cleared the path for redevelopment of 143 acres of Motilal Nagar I, II, and III via C&DA. Solicitor General Tushar Mehta, representing the MHADA, submitted that the land belonged to the housing authority and the project had been granted "special status" by the Maharashtra government. He said that obtaining individual consent from thousands of residents could delay the long-pending redevelopment. The apex court took note of the submission that 1,600 sq ft of built-up area was being offered in lieu of 230 sq ft of existing occupancy - much higher than the standard entitlement under the Development Control and Promotion Regulations (DCPR). Earlier, the Bombay High Court had dismissed a review petition filed by Motilal Nagar Vikas Samiti, reaffirming the legality of the C&DA route for redevelopment of Motilal Nagar. The Motilal Nagar redevelopment project - executed in partnership with Estatevue Private Developers, a subsidiary of Adani Realty - aims to rehouse approximately 3,700 residents in modern apartments measuring 1,600 sq ft. The C&DA agreement also includes 987 sq ft of commercial space, and improved infrastructure. The MHADA will retain full ownership of the land, while Estatevue Private Developers handles execution of the redevelopment project. The Rs 36,000-crore project has a seven-year timeline, during which 3,372 residential units, 328 commercial units, and 1,600 tenements from an adjacent slum will be relocated. The C&DA bears the entire cost of rehabilitation, infrastructure, and amenities - free of cost to the MHADA.

‘Colossal misuse of authority': HC orders inquiry into 935 Mhada redevelopment notices
‘Colossal misuse of authority': HC orders inquiry into 935 Mhada redevelopment notices

Hindustan Times

time8 hours ago

  • Hindustan Times

‘Colossal misuse of authority': HC orders inquiry into 935 Mhada redevelopment notices

MUMBAI: Calling it a 'colossal misuse' of authority, the Bombay high court on Monday appointed a two-member committee to investigate a 'racket' involving engineers from the Maharashtra Housing and Area Development Authority (Mhada) illegally issuing 935 redevelopment notices to old buildings in prime locations in the city. MHADA Office at Bandra Internet photo A division bench of justice GS Kulkarni and justice Arif Doctor ruled that Mhada's executive engineers had issued these notices without jurisdiction as they had vested interests in the properties, which are located in upmarket areas in south Mumbai, such as Banganga Road, Walkeshwar, Gamdevi Road, BG Kher Marg, and Nepean Sea Road. The inquiry will be conducted by a two-member committee headed by justice (retired) JP Deodhar, a former judge of the Bombay high court, and retired principal district judge Vilas D Dongre. The committee has been asked to submit its inquiry report within six months. The court issued the orders after hearing a bunch of petitions challenging the redevelopment notices issued by Mhada to hundreds of cessed buildings that it had deemed dangerous and dilapidated. The petitions claimed that executive engineers from the Mumbai Building Repairs and Reconstruction Board (MBRRB), a statutory unit of Mhada, had issued the notices without jurisdiction and based on only a 'visual inspection,' without conducting a structural audit of the buildings. The entire controversy revolves around section 79-A of the Mhada Act, which allows Mhada to initiate the redevelopment of dangerously dilapidated cessed buildings if neither the owner nor the tenants take the necessary steps within a specified timeframe. Earlier this month, the court had observed that an executive engineer in Mhada had no jurisdiction to issue the redevelopment notices, adding that their action appeared to be high-handed. Calling the matter serious, the court held that the notices were issued to give an undue advantage to certain people, while curtailing the rights of the owners and tenants of the cessed buildings. 'This would amount to a brazen misuse of the powers and authority vested with the concerned officers of Mhada at whichever level, we do not know', the bench said. Citing a 2024 judgement, the bench stated that section 79-A of the Mhada Act can be invoked only if a building is first declared dangerous by the Brihanmumbai Municipal Corporation (BMC) or a competent authority. It had held that executive engineers have no independent power to issue such notices. Advocates NV Walawalkar, GS Godbole and Surel Shah, appearing for the petitioners, submitted that Mhada had not vested any jurisdiction whatsoever in the officers who issued such notices. Even assuming the appropriate authority was involved, under Section 79-A, the notices could not have been issued based on just a 'visual inspection' of the buildings concerned, the petitioners argued. On the other hand, senior counsel PG Lad, representing Mhada, referred to provisions of the Mhada Act which showed that it was 'the primary responsibility of the board to repair the cessed buildings.' Considering the large number of prime properties being adversely affected, the bench stated that the matter has 'gathered the colour of a racket/scam' by misusing the provisions of law. It noted that the redevelopment of the properties had been ordered at the behest of 'unscrupulous persons with vested interests' who intend to take advantage of the fact that the buildings are old. The consequences of issuing such notices without the jurisdictional requirements are 'horrendous to say the least,' the bench said. Noting that the redevelopment of cessed properties involves floor space index incentives, which is 'a bonanza for commercial exploitation,' the court stated that the vested interests in these properties can be worth a fortune. 'The statutory machinery being misused for such ulterior motives and for windfall of benefits is a matter of serious concern. It is beyond one's imagination as to how, in such large numbers, the impugned notices under Section 79-A could at all be issued,' the court said. Expressing concerns over the board's actions, the court held that if accepted, it would amount to rewriting legislative provisions and recognising a regime of colossal arbitrariness and abuse of powers. 'The pattern is quite unique. It appears to be quite clear that these notices are issued wholly without jurisdiction. We may also observe that the petitioners' case being of an extreme, unfortunate and blatant abuse of the powers by these officers,' the court added.

HC orders probe into 900+ Mhada notices for redvpt by dubbing bldgs dangerous
HC orders probe into 900+ Mhada notices for redvpt by dubbing bldgs dangerous

Time of India

time15 hours ago

  • Time of India

HC orders probe into 900+ Mhada notices for redvpt by dubbing bldgs dangerous

Mumbai: Bombay high court censured Mhada on Monday for the illegal and high-handed actions of its executive engineers in issuing over 900 notices for redevelopment of premises by dubbing them dangerous, trampling on the constitutional rights of owners of cessed buildings and, in many cases, also of their tenants. The HC dubbed such notices and the redevelopment powers invoked by the executive engineers and the Mhada repair board, without any jurisdiction, a "regime of colossal arbitrariness and abuse of powers by such officials in committing bald, brazen and patent acts of illegalities". Observing that a mere stay of the notices — those that Mhada did not withdraw later — was not enough, the court ordered an enquiry by a two-member panel of former HC judge Justice J P Devadhar and retired principal district judge Vilas Dongre to examine all 935 notices issued under Section 79A of the Mhada Act. This section enables the authority to acquire dangerous cessed buildings and carry out redevelopment when both the owners and tenants' associations fail to do so after the building is declared dilapidated and dangerous. You Can Also Check: Mumbai AQI | Weather in Mumbai | Bank Holidays in Mumbai | Public Holidays in Mumbai The order of the high court bench of Justices Girish Kulkarni and Arif Doctor came on a batch of petitions against the notices issued by the Mumbai Building Repairs and Reconstruction Board, a statutory unit of Mhada. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Compare Spreads: Bitcoin vs Ethereum CFDs IC Markets Learn More Undo Section 79A has had a vexed presence. It was introduced in Dec 2022 to enable the redevelopment of a building on the premise that the structure is dangerous. "However, whether a building is dangerous or not cannot be the ipse dixit of the concerned is required to be decided as stipulated by law," the HC said. The two-member committee named by the Bombay high court will also examine subsequent actions to withdraw such notices, and the role of the officials and motives, if any, in the issuance of the notices. Justice Kulkarni, who authored and read out the order in court, said the "committee shall examine the purpose, basis, intention, and the authority of the vice-chairman to issue the SOP dated Dec 5 2024". The SOP creates a parallel machinery and cannot be interpreted by officials to assume power to issue notices, the HC said. The section was introduced since Mhada said there were over 13,000 old and dilapidated cessed buildings in Mumbai constructed prior to 1940. Mhada was tasked with their repairs. The law was also amended to enable owners with 51% consent of tenants to redevelop, but Mhada said despite the repair board declaring buildings "dangerously dilapidated", owners do not come forward to redevelop. The HC said executive engineers invoke Section 79A by a "visual examination" of a building to declare it dilapidated and proceed to issue notices for redevelopment. "By issuance of these notices, ultimately what is sought to be achieved, and certainly at the behest of vested interests, is a fait accompli by exploiting the incentives on the redevelopment by such vested interests by misuse of the official machinery of Mhada and the repair board for the benefit of either the landlord or tenants." The HC stressed, "The issuance of such notices by such officials in the manner as resorted is only to enable and aid the sinister motives, to be achieved at the instance of one party against the other, in the redevelopment of a building without verifying whether it needs to go for redevelopment." The court posted the matter on Aug 12 and called for a report from the committee in six months. The court rejected a plea by Mhada lawyer P G Lad for a stay of the order.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store