logo
Council approves engineering services contract for new stormwater ponds, trails

Council approves engineering services contract for new stormwater ponds, trails

Yahoo28-01-2025

Jan. 28—The Albert Lea City Council on Monday voted to approve engineering services for a series of stormwater rain gardens and public use trails slated to be constructed off of Front Street between Maplehill Drive and South Fourth Avenue.
City Manager Ian Rigg said the city received an almost $886,000 stormwater resiliency grant for design and construction of the project, which will take place on city-owned property at 1300 Front St.
The area is prone to flooding.
Rigg said the parcels were donated to the city to create stormwater storage.
Third Ward Councilor Jason Howland said he was glad to see the project ahead.
"This project — I want to forewarn — this isn't going to solve completely flooding, but this will help," he said. "Flooding in that area has been an issue for a long time. Looking forward to see this move forward."
He said it will not only aid in the flooding but it will also provide some new opportunities for pedestrians nearby.
The council approved a cost of $173,700 with HR Green of St. Paul to develop construction plans and a cost estimate for the project, including design, wetland delineation, stormwater modeling with Geotech coordination and ADA walkway and improvements, along with optional construction oversight.
The total estimated cost of the project is $1.028 million.
Howland said the project is slated for completion at the end of 2025 or spring of 2026.
In other action, the council:
—Accepted donations totaling about $6,500 toward a small changing room for referees and hockey players in a portion of the skate-changing area outside the Nystrom Rink at City Hall.
Rigg said Recreation Department staff had expected to build the room themselves, but Attig Construction offered its services, along with Geneva Lumber, Rink Systems and Albert Lea Electric, which also offered supplies and services. The 9 1/2-by-17-foot room will display the names of the donors.
Howland, Mayor Rich Murray and Councilor Brian Anderson thanked the businesses that donated their services and materials to the project.
—Accepted the feasibility report and called a public hearing for the reconstruction of 11th Street, from Margaretha Avenue to the east end. Proposed work includes complete removal and replacement of the pavement, curb and gutter, sanitary sewer, storm sewer and watermain.
—Accepted the feasibility report and called a public hearing for this year's state-aid overlay projects.
The project includes bituminous mill and overlay on Garfield Avenue from Fairlane Terrace to Richway Drive.
—Accepted the feasibility report and called a public hearing for the neighborhood improvement project for this summer.
It includes two main components: bituminous mill and overlay in the Crossroads Boulevard area and a portion of Lake Chapeau Drive, and replacement of the bituminous surface on a portion of SE Marshall Street.
—Appointed Marly Steele to the Senior Center Board.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Walton County to break ground on Driftwood Road
Walton County to break ground on Driftwood Road

Yahoo

time10 hours ago

  • Yahoo

Walton County to break ground on Driftwood Road

WALTON COUNTY, Fla. (WMBB) – The Walton County Board of County Commissioners and the Walton County Beach Operations and Tourism Departments plan to break ground on the Driftwood Road Municipal Parking facility. According to a news release, the construction will begin Monday, June 16, on 76 Driftwood Road in Miramar Beach at 9 a.m. U.S. 231 Road Improvement Project to begin in Bay County Walton County's need for public beach access, rest areas and transit stops led to the project approval from the BCC. The Driftwood Road Municipal Parking facility will include 67 parking spaces with dedicated ADA, LSV and bicycle parking. Four of the parking spots will also include electric vehicle charging stations. Officials say the construction of the 1.119-acre lot will take approximately 11 months. For visitors, the public transit stop will have air-conditioning as well as a restroom facility for convenience. The Tourist Development Tax, a 5% tax collected on short-term rentals in south Walton County, funds this development. For more information and project updates, click here. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Sana Biotechnology Announces Invited Oral Presentation at the 85th Annual American Diabetes Association Scientific Sessions
Sana Biotechnology Announces Invited Oral Presentation at the 85th Annual American Diabetes Association Scientific Sessions

Yahoo

time12 hours ago

  • Yahoo

Sana Biotechnology Announces Invited Oral Presentation at the 85th Annual American Diabetes Association Scientific Sessions

Presentation to highlight updated six-month clinical results of a hypoimmune-modified primary pancreatic islet cell therapy for patients with type 1 diabetes SEATTLE, June 09, 2025 (GLOBE NEWSWIRE) -- Sana Biotechnology, Inc. (NASDAQ: SANA), a company focused on changing the possible for patients through engineered cells, today announced an upcoming podium presentation highlighting ongoing clinical data from the investigator-sponsored, first-in-human study transplanting UP421, an allogeneic primary islet cell therapy engineered with Sana's hypoimmune (HIP) technology, into a patient with type 1 diabetes without the use of any immunosuppression. The presentation will be held during a joint American Diabetes Association (ADA)/International Pancreas & Islet Transplant Association (IPITA) symposium at the 85th Annual ADA Scientific Sessions taking place June 20-23, 2025 in Chicago, IL. Presentation details: Symposium Title: Joint ADA/IPITA Symposium: Outpacing the Immune System—Sprinting Towards Immune Protection for Cell Replacement Therapy Presentation Title: Hypoimmune Pancreatic Islet Transplantation in Adult Subjects with Type 1 Diabetes Presentation Date: Monday, June 23, 2025 Presentation Time: 9:00 – 9:20 a.m. CT Location: W192 A-C About Sana Sana Biotechnology, Inc. is focused on creating and delivering engineered cells as medicines for patients. We share a vision of repairing and controlling genes, replacing missing or damaged cells, and making our therapies broadly available to patients. We are a passionate group of people working together to create an enduring company that changes how the world treats disease. Sana has operations in Seattle, WA, Cambridge, MA, South San Francisco, CA and Bothell, WA. Cautionary Note Regarding Forward-Looking Statements This press release contains forward-looking statements about Sana Biotechnology, Inc. (the 'Company,' 'we,' 'us,' or 'our') within the meaning of the federal securities laws, including those related to the company's vision and expectations regarding participation in and the presentation at the 85th Annual American Diabetes Association Scientific Sessions, including the content of such presentation. All statements other than statements of historical facts contained in this press release, including, among others, statements regarding the Company's strategy, expectations, cash runway and future financial condition, future operations, and prospects, are forward-looking statements. In some cases, you can identify forward-looking statements by terminology such as 'aim,' 'anticipate,' 'assume,' 'believe,' 'contemplate,' 'continue,' 'could,' 'design,' 'due,' 'estimate,' 'expect,' 'goal,' 'intend,' 'may,' 'objective,' 'plan,' 'positioned,' 'potential,' 'predict,' 'seek,' 'should,' 'target,' 'will,' 'would,' and other similar expressions that are predictions of or indicate future events and future trends, or the negative of these terms or other comparable terminology. The Company has based these forward-looking statements largely on its current expectations, estimates, forecasts and projections about future events and financial trends that it believes may affect its financial condition, results of operations, business strategy and financial needs. In light of the significant uncertainties in these forward-looking statements, you should not rely upon forward-looking statements as predictions of future events. These statements are subject to risks and uncertainties that could cause the actual results to vary materially, including, among others, the risks inherent in drug development such as those associated with the initiation, cost, timing, progress and results of the Company's current and future research and development programs, preclinical and clinical trials, as well as economic, market, and social disruptions. For a detailed discussion of the risk factors that could affect the Company's actual results, please refer to the risk factors identified in the Company's Securities and Exchange Commission reports, including but not limited to its Quarterly Report on Form 10-Q dated May 8, 2025. Except as required by law, the Company undertakes no obligation to update publicly any forward-looking statements for any reason. Investor Relations & Media:Nicole

Nasdaq confirms XRP, SOL, ADA, and XLM in benchmark index via new SEC filing
Nasdaq confirms XRP, SOL, ADA, and XLM in benchmark index via new SEC filing

Yahoo

time14 hours ago

  • Yahoo

Nasdaq confirms XRP, SOL, ADA, and XLM in benchmark index via new SEC filing

Nasdaq confirms XRP, SOL, ADA, and XLM in benchmark index via new SEC filing originally appeared on TheStreet. Nasdaq has officially filed an SEC Form 8-K for the Hashdex Nasdaq Crypto Index US ETF, confirming it has reconstituted its benchmark index to include four new digital assets: Cardano (ADA), Solana (SOL), Stellar Lumens (XLM), and XRP. These coins are now part of the Nasdaq Crypto US Settlement Price Index (NCIUS), which the ETF uses as its benchmark. According to the filing dated June 2, this update marks a significant step toward broader crypto representation in institutional investment products. However, despite the change, the Trust will continue to hold only Bitcoin and Ethereum for now, due to its existing listing restrictions. 'Notwithstanding the changes to the NCI US, the Trust will continue to hold only BTC and ETH… due to the limitations of the Trust's currently approved listing rule,' the filing states. The update was disclosed in a Form 8-K, a standard filing companies use to inform investors of major events that shareholders should know about. In this case, it included the resignation of a key executive, as well as a major index reconstitution that may affect fund tracking performance. The filing warns of tracking error risk, noting: 'Beginning on June 2, 2025, the Index introduced additional Index Constituents… Under current regulatory restrictions, the Trust is only permitted to hold bitcoin and ether… As a result, the Trust's performance may be materially different from the performance of the Index.' Nasdaq has also filed a proposed rule change (SR-NASDAQ-2025-009) with the SEC that would allow the ETF to formally change its benchmark to the broader Nasdaq Crypto Index™ (NCI), enabling it to hold all nine listed crypto assets including LINK, LTC, and UNI. A decision on that proposal is expected by November 2, 2025. Nasdaq confirms XRP, SOL, ADA, and XLM in benchmark index via new SEC filing first appeared on TheStreet on Jun 9, 2025 This story was originally reported by TheStreet on Jun 9, 2025, where it first appeared. Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store