logo
DepEd seeks multi-sector drive to close classroom gap

DepEd seeks multi-sector drive to close classroom gap

GMA Network5 days ago
Education Secretary Sonny Angara intensified calls for multi-sector collaboration in accelerating the construction of classrooms amid the proposed education budget of P1.224 trillion in the 2026 National Expenditure Program (NEP).
This, as DepEd's proposal for the 2026 NEP includes a 'Special Provision on flexibility,' enabling local government units (LGUs), private partners, and NGOs (non-government organizations) to take on project implementation—especially vital in disaster-prone and remote areas.
'Nagpasok tayo ng Special Provision on flexibility sa 2026 NEP. Dahil madalas ring tumutugon ang DPWH (Department of Public Works and Highways) sa mga kalamidad, nais nating bumuo ng pool ng mas maraming implementing actors upang matiyak na magpapatuloy ang mga proyekto nang walang aberya,' Angara said.
(We introduced a Special Provision on flexibility in the 2026 NEP. Since DPWH often responds to disasters, we want to form a pool of more implementing actors to ensure projects continue without disruption.)
He added that LGUs could tap into their Special Education Fund (SEF), while the private sector could contribute via Public-Private Partnerships (PPP) or the Adopt-a-School program.
'Kailangan nating buksan ang pinto para makasali ang LGU, NGO, at iba pang handang tumulong para mapabilis ang pagpapatayo. Ang mahalaga, kung saan may pondo, dapat may marunong at mabilis na tagapagpatayo,' Angara said.
(We need to open the door for LGUs, NGOs, and others willing to help to speed up construction. What's important is that where there's funding, there should be capable and fast builders.)
DepEd's strategy incorporates a national classroom master plan using demographic trends and site-level data, aiming to program funds efficiently through the Basic Education Facilities Fund and Quick Response Fund. DepEd engineers will monitor construction, with inter-agency validation ensuring transparency and quality.
Flood- and typhoon-resilient designs are also being adopted—such as stilted classrooms and elevated structures with waterproofed roofing, particularly in regions like Bicol.
DepEd also supports the proposed Classroom Building Acceleration Program (CAP) under Senate Bill No. 121, emphasizing that it should be built on the national master plan, clear shared roles, priority targeting of high-need areas, and centralized monitoring.
The education sector got the largest allocation in the proposed 2026 NEP—P1.224 trillion—upholding the constitutional mandate to prioritize education funding.
This includes P928.5 billion for DepEd, P134.9 billion for State Universities and Colleges (SUCs), P33.9 billion for CHED, and P20.2 billion for TESDA. Teachers' allowances were increased to ensure a doubled rate of P10,000 per month starting SY 2025–2026.
President Marcos emphasized that this allocation aligns with UNESCO guidelines, targeting 4–6% of GDP and 15–20% of total public expenditure in education. —VAL, GMA Integrated News
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

DBM backs proposal to realign P250B in flood control funds to classroom construction
DBM backs proposal to realign P250B in flood control funds to classroom construction

GMA Network

timean hour ago

  • GMA Network

DBM backs proposal to realign P250B in flood control funds to classroom construction

'The executive proposes the budget and then we leave it to Congress whether you think it's wise to cut the flood control budget and move it to education, but we welcome such because, again, the theme of our budget for next year will be really to increase our investment and spending in education,' Pangandaman said. The Department of Budget and Management has expressed support for a proposal that will realign P250 million worth of flood control allocations to the construction of classrooms, which now has only P13 billion under the National Expenditure Program for 2026. Batangas Rep. Leandro Leviste made the suggestion during the Development Budget Coordination Committee (DBCC) briefing. The P6.7-trillion proposed national budget has earmarked P274 billion worth of flood control for next year. 'The President has indicated that flood control projects are a possible source of corruption and yet the 2026 NEP includes over P250 billion in flood control projects while the provision for new classrooms is at P13 billion,' Leviste said. 'Would DBCC support the House if we allocate much of this over P250 billion worth of flood control projects to increase the P13 billion pesos allocated to new classroom construction?" he added. "Based on the substandard and overpriced [Department of Public Works and Highways] projects we have seen, closing the gap on [the Department of Education's] classroom shortage seems to be a much more wise use of taxpayers' money than DPWH flood control projects in the 2026 budget,' Leviste said. 'As long as DepEd can utilize' Budget Secretary and DBCC Chair Amenah Pangandaman said Leviste's suggestion was welcome as long as the Department of Education (DepEd) could efficiently spend such a huge allocation. 'The executive proposes the budget and then we leave it to Congress whether you think it's wise to cut the flood control budget and move it to education, but we welcome such because, again, the theme of our budget for next year will be really to increase our investment and spending in education,' Pangandaman said. 'As long as the Department of Education can fully utilize the added allocation for the construction of classrooms, that would be okay,' she added. Pangandaman on Monday said that the country could not afford to fund education, health, and social protection programs based on international standards because it would go beyond its present budget level. Last year, President Ferdinand "Bongbong" Marcos, Jr. vetoed, meaning removed, more than P16 billion worth of flood control projects under the Congress-approved P6.3 trillion national budget for 2025 before signing the General Appropriations Bill into law. Finance Secretary Ralph Recto, on the other hand, said on Monday that the President withheld the release of at least P60 billion funding under the 2025 national budget because this amount funded programs that are not aligned with the administration's priorities. –NB, GMA Integrated News

Bonoan: DPWH validating 'ghost' flood control projects in Bulacan
Bonoan: DPWH validating 'ghost' flood control projects in Bulacan

GMA Network

time4 hours ago

  • GMA Network

Bonoan: DPWH validating 'ghost' flood control projects in Bulacan

Department of Public Works and Highways (DPWH) Secretary Manuel Bonoan on Tuesday expressed belief that "ghost" flood control projects worth P5.9 billion mar some areas in Bulacan. In his interpellation during a Senate blue ribbon committee hearing, Senate President Pro Tempore Jinggoy Estrada said his office received reports that there are "ghost projects" in Malolos City and the municipalities of Calumpit and Hagonoy in Bulacan. Estrada said that among the contractors allegedly involved is the Wawao Builders—one of the 15 contractors named by President Ferdinand "Bongbong" Marcos Jr. that supposedly got 20% of the total P545 billion budget of flood control projects in the country. Bonoan said that the DPWH is still validating such reports of ghost projects, but when asked by Estrada if he believes the existence of such, the Secretary said, "In all honesty Your Honor, I think so." "There are district offices that try to continue the validation of some of the projects. Let me just point out, Your Honor, that many of these projects… I have mentioned, some of the projects were implemented in 2021 [and] 2022," Bonoan said. The DPWH chief further said he learned of the possible existence of the ghost projects "just lately." "There are already information coming… There are people actually in the department, that are… There are people who can actually testify, Your Honor. There are projects that we are intensively validating," Bonoan added when asked how he learned of such. Estrada then asked Bonoan how much was awarded to Wawao Builders, but the DPWH chief initially said that he had no figures to show. This infuriated the senator. "Mayroong mga figures diyan, 'wag niyo ko lolokohin dito. Ilabas niyo kung magkano 'yung in-award niyo du'n sa Wawao Builders, mga ghost projects. We'll wait for it… Nakakadiri kayo," Estrada said. (You have figures there to show. Don't try to fool me. Tell us how much you awarded Wawao Builders, the ghost projects. We'll wait for it... You are disgusting.) According to Bonaoan, Wawao Builders had 85 projects worth P5.971 billion in the first engineering district of Bulacan. "There seems to be some ghost projects that have actually been reported, Your Honor. Yes, we're investigating … They'll be coming up with a financial and physical report in one week's time in my office," he added. — VDV, GMA Integrated News

Bonoan: 'No significant coordination' yet with DENR agency on flood control plan
Bonoan: 'No significant coordination' yet with DENR agency on flood control plan

GMA Network

time4 hours ago

  • GMA Network

Bonoan: 'No significant coordination' yet with DENR agency on flood control plan

Secretary Manuel Bonoan said on Tuesday that there is currently "no significant coordination" between the Department of Public Works and Highways (DPWH) and the River Basin Control Office (RBCO) in relation to the development of a master plan for flood control projects. The DPWH has had "no significant coordination at this point in time" with the RCBO, an attached agency of the Department of Environment and Natural Resources (DENR), to develop a master plan to address flooding, said Bonoan, who was speaking at the Senate Blue Ribbon Committee hearing on the alleged anomalous flood control projects. Bonoan's predecessor, Senator Mark Villar, emphasized the importance of master plans and funding for their implementation. 'Base sa karanasan ko bilang Secretary ng Public Works, napaka-importante po ang master planning sa flood control kasi pwede mong ayusin ang isang section at bibilis ang daloy ng tubig. Pero pagdating sa ibang section na walang flood control, maiipon ang tubig at mas lalala ang baha sa ibang areas,' Villar said. (Based on my experience as DPWH secretary, master planning is very important in flood control because through it, you can fix an affected section and the flow of water will ease. But the water will accumulate and the flood will worsen in other areas that have no flood control.) 'So napaka-importante na magkaroon tayo at suportahan natin ang mga master plan ng flood control projects. And there are master plans. I'm aware; may mga master plan talaga sa DPWH. Some of them are foreign-funded master plans, and some of them are each water basin na may master plan,' he added. (So it is very important that we come together and support the master plan for flood control projects. And there are master plans. I'm aware there are master plans in the DPWH. Some of them are foreign-funded master plans, and some of them are master plans of each water basin.) Villar, who served as DPWH chief during the Duterte administration, also called for more accountability measures to prevent substandard flood control projects. 'Nung nagkaron ng inspection si President Marcos, may nakita siyang mga substandard. 'Yun ang kailangan natin solusyonan sa lalong madaling panahon dahil that is very unacceptable that we have substandard projects,' he said. (When President Marcos did an inspection, he found substandard projects. That is what we need to solve as soon as possible because it is very unacceptable that we have substandard projects.) Between July 2022 and May 2025, the DPWH recorded 9,855 completed flood control projects, according to Bonoan. He said 3,709 projects worth P183 billion began construction as early as 2020 and 2021. Senate Blue Ribbon Committee chairman Rodante Marcoleta also noted during the hearing that based on the report submitted by the Senate Legislative Budget Research and Monitoring Office, the actual budget for flood control projects between July 2022 and May 2025 was P849 billion. 'We recognize the concern raised by the President…last Monday that while thousands of projects are reflected as completed, our citizens continue to experience recurring flooding. This is not a contradiction but a call for deeper accountability,' he added. President Ferdinand ''Bongbong'' Marcos Jr. earlier disclosed that 20% of the P545-billion budget for flood control projects was awarded to only 15 contractors. In his fourth State of the Nation Address (SONA) last month, the President vowed that those involved in anomalous flood control projects would be held accountable. –VBL, GMA Integrated News

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store