Glenageary Victorian five-bed rich in period detail for €2.85m
:
5 Arkendale Road, Glenageary, Co Dublin
Price
:
€2,850,000
Agent
:
DNG
A large redbrick Victorian house in
Glenageary
, Co Dublin, 5 Arkendale Road is truly a family house: it's where Nollaig Greene grew up, where she and her husband Ken raised their three children and where a daughter, son-in-law and granddaughter lived with them for three years until recently. Now, after nearly 60 years, this tall 348sq m (3,745sq ft) two-storey, over-ground-level five-bedroom house, is for sale: DNG is asking €2.85 million for the semidetached house halfway down this quiet cul-de-sac off Castlepark Road.
The house, built in 1884, has been well cared for, with rich original plasterwork in the hall and main reception rooms, and modernised over the years. But it is also somewhat dated, and new owners will likely want to revamp it again.
If Nollaig were staying in the house, she would concentrate on improving its E1 Ber rating with an energy upgrade. What she likes most about her home – which her parents bought when she was six – is the space, light (the house has many tall sash windows) and the location, a short walk to Glenageary Dart station, Killiney Hill and the sea, of which there are views from upstairs windows. And of course, the large back garden, where she has created a 'white garden' filled with lilies, roses and peonies.
The Arkendale houses had generous back gardens and in 1998, Nollaig and Ken built a house at the bottom of their original garden, before swapping places with her parents and moving back into the main house. Number 5A Arkendale Road, sold in 2020 for €910,000, is tucked away behind tall walls down a long gravelled driveway.
READ MORE
Front garden and driveway
Entrance hall
Steep granite steps lead up to the front door of number 5, opening into a short front hall with ornate ceiling plasterwork. An original door with coloured glass opens into a hall, off which are four rooms: the diningroom, drawingroom, study and an upstairs kitchen. The diningroom and drawingroom are formal rooms, furnished in mainly period style. But they're both rooms the family uses, 'eating breakfast, lunch and dinner in the diningroom' when their daughter's family shared the house. And during Covid, Nollaig moved her desk near to a window in the drawingroom to take advantage of light flooding in.
The diningroom at the front of the house has ornate ceiling plasterwork, centre rose, a black marble open fireplace and a deep bay with three windows looking over the front garden.
Diningroom
The drawingroom, at the back of the house, has two tall windows overlooking the back garden, slightly less ornate plasterwork, centre rose and a white marble fireplace.
Drawingroom
The study, at the front of the house, is a good size. The upstairs kitchen is a legacy of earlier days when the main kitchen was located here and was useful when her daughter lived with them, says Nollaig.
Study
Stairs beside an exposed brick wall lead down to garden level, where a large kitchen/breakfastroom and family room are linked by a very wide arch.
Downstairs hall
An Aga sits in the chimneybreast of the kitchen/breakfastroom opposite an island and a large dining table. There are window seats below two tall windows looking into the back garden.
The family room at the front of the house has a deep bay with three windows, like the diningroom on the floor above, an open fireplace and an exposed brick wall.
Kitchen
Family room
Other rooms at this level include a utility room, a room well equipped as a gym, a downstairs shower room and a storage room under the front steps – a space owners of some Victorian houses have turned into a wine cellar. There is a side entrance into the downstairs hall, and, at the end of the hall, sliding glass doors opening into the back garden.
Upstairs, past a landing with a tall arched window, there are five bedrooms on the top floor and a family bathroom. This is painted a vivid yellow and has a traditional clawfoot bath and a shower.
The large main bedroom has a deep three-window bay with views over trees and houses across the sea to Howth, and a tiled en suite shower room. A sixth bedroom could be created downstairs, perhaps in the garden-level gym or ground floor kitchen or study.
Main bedroom
Family bathroom
View towards Howth from upstairs
Number 5 stands on 0.2 acres and has a 25m (82ft) back garden. Steps lead up from a patio stretching across the back of the house to a glossy green lawn with a pear tree near its centre. The garden, where one of the daughters got married, is private, with trees and mature planting, including the white flowers, and a herb garden in a trug. There's lots of room to park in the landscaped front garden.
Rear garden
Glenageary Dart station is a five- to 10-minute walk via a pedestrian lane at the end of the cul-de-sac leading to the Metals – the walkway that runs behind the Arkendale houses.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


RTÉ News
2 hours ago
- RTÉ News
Engineering firm Egis to create 100 jobs in Dublin
Engineering consultancy Egis has announced the creation of 100 jobs after the company secured a number of new contracts in the last few months. Egis, which has been operating in Ireland since 1994, said it will fill the new roles over the next 12 months, adding that most of the positions will be in engineering. The jobs announcement was made as Tánaiste Simon Harris officially opened the company's revamped engineering headquarters at Classon House in Dundrum in Dublin 14. Egis has already recruited 80 new engineers in the last two years in Ireland, and its total Irish workforce now stands at over 630 with operations across 16 offices and sites. The planned expansion in staff numbers comes after the company's acquisition of Dublin-based JB Barry & Partners in 2023. Egis was recently awarded a new contract by Transport Infrastructure Ireland to operate and maintain the Dublin Tunnel, the Jack Lynch Tunnel and monitor 1,200km of motorway. It is also acting as engineers for the Sisk Sorenson joint venture, which is building the new Adare Bypass, and is involved in the REPower EU Energy Survey, which is conducting energy assessments on 4,000 schools in Ireland. Egis also wants to strengthen its ability to support the State's planned investment in infrastructure as outlined in the updated €275 billion National Development Plan. The plan includes major transport projects such as DART+, Metrolink, Bus Connects and key water improvements such as the Greater Dublin Drainage Project and the Shannon to Dublin pipeline. Both Eirgrid and the ESB are also expected to invest in new infrastructure in the coming years. Egis already works in partnership with public sector clients such as Transport Infrastructure Ireland, the National Transport Authority, Iarnród Éireann, Uisce Éireann, local authorities and the OPW. Steve Preece, CEO of Egis in Ireland, said the company's ambition is to help enable the country's stable economic growth through the delivery of essential infrastructure and buildings that can deliver a better and more sustainable future for all. "Our plan to increase staff numbers comes as the Government and state agencies are investing in major infrastructure projects and undertaking updating works on existing infrastructure," he said. "By investing in new staff, we are seeking to position ourselves to successfully compete for a share of this work and to provide the support and expertise required to ensure the Government maximises the return on its investment," he added. Tánaiste Simon Harris said that Egis has already successfully partnered with the Government and with a number of state agencies on the delivery and operation of major infrastructure projects, adding that he welcomes the company's plans to continue expanding and to create 100 new jobs over the next year.


Irish Times
5 hours ago
- Irish Times
The most complained about companies in Ireland
Ryanair, Eir and Sky were the companies most complained about in the first half of 2025 while Ticketmaster saw its ranking with Ireland's consumer watchdog improve as concerns over high-priced Oasis tickets last September faded away. Conor Pope reports. Glenveagh Homes is weighing big changes to a 650-home housing development including omitting a number of housing units from the site, and a plan for a 379-unit, mixed-use development in Swords, Co Dublin. Hugh Dooley has the details. An Coimisiún Pleanála (ACP) has reopened an appeal over a 106 home development next to the Phoenix Park after the High Court quashed its decision to grant planning permission for the complex. Hugh has the story. How transformative is AI really going to be? At this stage it's an open question, but in his column Hugh Linehan shows how it is already having a huge impact on the media world. READ MORE Cantillon looks at an own goal by AIB, and why the Republic may not be a true ' rich ' country despite our GDP. In Your Money, Siobhan Maguire shows how it can be possible to make money out of watches , while Dominic Coyle answers questions on pensions and UK tax law, as well as whether borrowing from your children will impact the small gift tax exemption. Belfast-based neurotechnology company Neurovalens has closed a £6 million (€6.95 million) investment round to help fund its commercial expansion in the US and global markets. Ciara O'Brien reports. Dundrum Town Centre's owners have appealed a decision by Dún Laoghaire-Rathdown County Council to refuse retention permission for long-standing food truck concessions at the front entrance to the retail complex. Hugh has the story. A row over demands by contractors involving a potential investor in the refinancing of debt-ridden airline CityJet, over proposed upfront payment terms for future maintenance work, could collapse rescue plans for the company which is currently in examinership, the High Court was told on Monday. Ray Managh was in court. Ticketing software specialist Future Ticketing has renewed its deal with top League of Ireland Football club, Shamrock Rovers until 2030. Barry O'Halloran has the story. If you'd like to read more about the issues that affect your finances try signing up to On the Money , the weekly newsletter from our personal finance team, which will be issued every Friday to Irish Times subscribers.


Irish Times
6 hours ago
- Irish Times
An Coimisiún Pleanála reopens appeal over Phoenix Park apartments plan
An Coimisiún Pleanála (ACP) has reopened an appeal over a 106-home development next to the Phoenix Park after the High Court quashed its decision to grant planning permission for the complex. The proposed development, which has been sought by Linders of Smithfield Limited, is made up of 96 apartments in two blocks and 10 duplex apartments in a third block, at Quadrant House on Chapelizod Road. The large residential development (LRD) application was made in July 2023, seeking permission to level the Chapelizod Road site and to construct three residential blocks ranging from three to five storeys. The development, which was proposed to have a gross floor area of 9,786.5sq m, was to include a residents' gym, a cafe, a communal work space and a basement car park with 84 parking spaces. The development was not set to include any childcare facilities. Despite a series of objections from local residents, the Chapelizod Residents Association and Friends of the Phoenix Park, Dublin City Council granted permission. READ MORE Four separate appeals were lodged, with Chapelizod Tidy Towns' appeal being brought to ACP, which noted that 'particular concerns [were] raised about childcare provision and lack thereof', but planning permission for the development was affirmed after ACP found it to be in line with the Dublin City Development Plan. The case against ACP was brought before the High Court in early 2024 by Friends of the Phoenix Park, a group of local parents that noted their concerns that the development will further overload childcare provision in the area. The group is made up of parents whose children attended a childcare centre which was located on the site of the proposed development until it closed in June 2023. The childcare centre, which was described as 'integral' in an affidavit submitted by the group, was said to provide a significant number of care spaces. The national planning body conceded the case in January 2025. Its representatives admitted it had 'failed to give adequate reasons for its conclusion that the development was in compliance with the density provisions of the Development Plan with specific reference to the issue of public transport capacity'. Acting on behalf of ACP, Byrne Wallace Shields LLP suggested the court quash the order granting the planning application and issue an order that it pay the costs of the applicant, Friends of the Phoenix Park, and the costs of the court. Mr Justice Richard Humphreys quashed the decision in March, sending the case back to ACP. The planning commission is set to make a decision on the matter by December 4th.