logo
Govt to launch statewide soil testing drive tomorrow

Govt to launch statewide soil testing drive tomorrow

Time of India04-05-2025

Lucknow: The state govt is set to launch a largescale soil sample collection drive on May 5 as part of the
soil health card scheme
. The campaign aims to collect 11.56 lakh soil samples for the upcoming Kharif season.
According to agriculture department officials, the scheme aims to saturate 16,520 gram panchayats across the state by 2025. Of these, 70% of soil samples will be collected during Kharif season from 11,564 panchayats, while the remaining 30% will be covered in the Rabi season.
Regional extension workers, laboratory officials, and scientists from Krishi Vigyan Kendras will participate in the campaign.
For the first time, 7,684 trained 'Krishi Sakhis' from 50 districts have been engaged in the sample collection process. Each Sakhi will receive an honorarium of Rs 15 per sample. So far, 3.6 lakh samples have been collected. Testing revealed deficiencies in organic carbon (0.25–0.5%), nitrogen, phosphorus, potash, sulfur, zinc, and iron in the soil.
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Choose the eco-friendly cloud storage solution and get 25GB of free storage.
Degree Online | Search Ads
Learn More
Undo
Farmers will be provided with free soil health cards based on 12 key parameters, enabling them to apply fertilisers more scientifically and increase crop yield through balanced nutrient management. All data related to soil samples is available online on the soil health card portal.
Under the
Pradhan Mantri Rashtriya Krishi Vikas Yojana
, 4,850 gram panchayats were covered in 2023 and 8,260 in 2024. This year, all 16,520 gram panchayats are being targeted. From each panchayat, 100 soil samples will be collected. In the Rabi season alone, 4.96 lakh samples will be taken from 4,956 panchayats.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Model food streets coming up in four locations in Kerala
Model food streets coming up in four locations in Kerala

New Indian Express

time29 minutes ago

  • New Indian Express

Model food streets coming up in four locations in Kerala

THIRUVANANTHAPURAM: The Food Safety Department has launched the Modernisation of Food Streets project, setting up four model food streets that emphasise hygiene and aesthetics. In the first phase, projects are underway at Shankhumukham (Thiruvananthapuram), Panampilly Nagar (Ernakulam), Kottakunnu (Malappuram), and Kozhikode Beach. Health Minister Veena George said the initiative is a model for serving quality food in clean and attractive environment. Each food street is being developed for Rs 1 crore, adhering to strict food safety standards. The outlets will be operated by staff certified under the FoSTaC programme and follow the Food Safety and Standards Act, 2006. Emphasis is also placed on sanitation, with provisions for toilets and waste management systems. Construction is nearing completion, with Nirmithi Kendra handling the work at Shankhumukham. Other locations are being developed in collaboration with GCDA (Ernakulam), DTPC (Malappuram), and the Kozhikode Corporation. The initiative is being implemented under the State Food Safety Department, in coordination with district authorities and local bodies, with support from the Food Safety and Standards Authority of India and the National Health Mission.

Villagers around Madurai's Melur seek ambulance service
Villagers around Madurai's Melur seek ambulance service

New Indian Express

time44 minutes ago

  • New Indian Express

Villagers around Madurai's Melur seek ambulance service

MADURAI: Residents of remote villages near Melur, including Thiruvathavur, Veppadappu and Amoor, demanded that an 108 ambulance be assigned permanently to the primary health centre (PHC) in Thiruvathavur, vehicles from other areas don't reach the locality quickly. The people said they have to depend on ambulances from Melur GH or Thirupuvanam in Sivaganga district which take over 40 minutes to reach the location. For the people living in hamlets around Thiruvathavur and a few nearby panchayats, the PHC is the first point of contact for health care, as the nearest government hospitals are located either in Melur or Madurai city. Former panchayat president of Thiruvathavur, M Elavarasu, said the 2,100-odd families in the panchayat -- residing in Vella Muthampatti, Thiruvadavur Kottai and Manikampatti -- rely on the PHC. 'In case of emergencies, we are referred to the Government Hospital in Melur or Government Rajaji Hospital (GRH) in Madurai city, which are over eight and 27 kilometres away, respectively. 108 ambulances take more than 45 minutes to reach the PHC. Local autorickshaw drivers charge Rs 200-Rs 250 for a trip to Melur GH,' he said. Nearly 800 families from Poonjuthi panchayat, also receiving primary healthcare services from the Thiruvathavur PHC, are also allegedly subjected to the same fate. P Ramanathan, former president of the panchayat, said, 'A few days ago, an individual riding pillion on a two-wheeler sustained severe injuries in a road accident. However, it took 35 minutes for the ambulance to reach. By the time the patient was taken to the GH in Melur, the doctors declared the individual dead on arrival.'

Patients affected as Coimbatore Medical College Hospital sewage system sees little progress
Patients affected as Coimbatore Medical College Hospital sewage system sees little progress

New Indian Express

timean hour ago

  • New Indian Express

Patients affected as Coimbatore Medical College Hospital sewage system sees little progress

COIMBATORE: The renovation of the underground drainage (UGD) and sewage systems at the Coimbatore Medical College Hospital (CMCH) is progressing at a snail's pace, causing inconvenience to patients and visitors alike. The road on the eastern side, from Amma Unavagam, is completely closed for construction, forcing all traffic to rely on a single access route from the super speciality block. Officials from the Public Works Department (PWD), who are managing the project, said that the delay is due to difficulties in identifying the existing underground electrical cables and pipeline network. They further said that they aim to complete the project in three months. The construction of sewage systems, storm water drains, and roads was initiated in response to increasing sewage overflow issues on hospital premises. Following the Chief Minister's announcement, a government order was issued on July 16, 2024 for renovation work, at a cost of Rs 9.65 crore. After long delays, work began in April 2025. However, staff at the hospital complain that progress has been slow, with less than 20% being complete. Covering an area of 19.4 acres, CMCH has around 20 buildings, totalling 3.10 lakh square feet. In addition to inpatient services, the hospital serves more than 4,000 outpatients daily. Currently, sewage from all buildings is partially treated before being discharged into Valankulam Lake.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store