
Commuters throng underground as surface transport goes haywire
2
3
4
Kolkata: Commuters on Monday preferred the underground route as transport above the ground went missing since morning, forcing many office-goers to take unsanctioned leave. The Metro was a saviour when buses, mostly hired for rallyists, were unavailable and app-cab services were erratic.
Till 3 pm, the Blue Line, which is the city's transportation lifeline operating along the North-South axis, recorded a sharp spike with 386,033 commuters. Green Line 2, or East-West Metro's Esplanade-Howrah Maidan section, ferried 39,528 people till 3 pm. Howrah was the Green Line's most crowded station, earning Rs 3.1 lakh (cash) till 5.30 pm. "Compiling revenue generated from other means like smart card, UPI, and the Metro app, Howrah station earned around Rs 5 lakh till 5.30 pm," an official said.
The passenger count for Green Line 1, or East-West Metro's Sector V-Sealdah section, was 29,501 till 3 pm. The less-used metro lines were more crowded than usual. Till 3 pm, the Orange (New Garia-Ruby) and Purple (Joka-Majerhat) lines recorded 3,276 and 3,430 passengers, respectively.
You Can Also Check:
Kolkata AQI
|
Weather in Kolkata
|
Bank Holidays in Kolkata
|
Public Holidays in Kolkata
Extra counters were opened at stations like Esplanade, Howrah, and Park Street. Extra staff members and RPF personnel were deployed to control the crowd.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
AirSense 11 – Smart tech for deep sleep
ResMed
Buy Now
Undo
Manual passage replaced automatic fare collection (AFC) gates. Separate accesses were opened for smart card users for faster movement. As passengers were trying to squeeze in, a few trains were briefly held up at Esplanade and Chandni Chowk stations because the compartment doors could not be closed.
RPF personnel were seen rushing in to help commuters board the trains. Escalators were turned off to prevent accidents.
"It was like a local train journey. The compartments were packed with rally participants. I had to get down at Esplanade but could not. I went to Park Street instead and walked back," said Pritam Saha, a Lake Town resident who boarded a train at Belgachhia.
Above the ground, the dearth of buses or any other means of commute gave daily travellers a harrowing time. "I waited for 20 minutes for a bus to Park Street, then decided to take the metro from Thakurpukur station to Majerhat where I waited for another 30 minutes for a bus.
Joined three others around 10 am for a shared cab ride to Park Street that cost us Rs 600," rued Goutam Maji, a private firm employee. App cabs were cancelling at random.
"At 8.30 am, at least four cab drivers cancelled rides to Esplanade," said Tanima Mondal, who was forced to opt for an app bike for twice the normal fare. Very few auto rickshaws were seen in the morning.
Buses from both the northern fringes (Barasat, Rajarhat, New Town) and the south (Behala, Budge Budge, Amtala, Sonarpur, and Baruipur) weren't available since Sunday evening. According to Titu Saha of the City Suburban Bus Service and Tapan Banerjee of the Joint Council of Bus Syndicate, it was the highest rally requisition in recent years.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
an hour ago
- News18
'Will Build Viksit Tamil Nadu': PM Modi Inaugurates Rs 4,800 Crore Projects In Thoothukudi
Prime Minister Narendra Modi inaugurated development projects worth Rs 4,800 crore in Thoothukudi and outlined his plan to create a Viksit Tamil Nadu. Immediately landing in India after concluding his two-day trip to the Maldives, Prime Minister Narendra Modi inaugurated development projects worth Rs 4,800 crore in Tamil Nadu's Thoothukudi on Saturday. 'It is my good fortune that after a four-day foreign tour, I got the opportunity to come directly to this sacred land of Bhagwan Rameswaram," PM Modi said in a public speech. 'It is a symbol of the growing trust of the world and the new self-confidence of India. With this very self-confidence, we will build a Viksit Bharat and a Viksit Tamil Nadu." The landmark projects inaugurated by PM Modi are expected to significantly enhance regional connectivity, boost logistics efficiency, strengthen clean energy infrastructure, and improve the quality of life for citizens across Tamil Nadu, according to an official release. 'In September, I inaugurated the new Thoothukudi International Container Terminal. And today, once again, projects worth Rs 4,800 crore have been inaugurated and foundation stones laid here. These include projects related to airports, highways, ports, and railways, as well as important initiatives linked to the power sector," he said. view comments First Published: July 26, 2025, 20:41 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


India.com
2 hours ago
- India.com
Delhi to Dehradun in less than 3 hours: New Expressway to open on..., check toll rate, entry, exit, route, top speed to be...
New Delhi: The upcoming Delhi-Dehradun Expressway will significantly reduce travel time between Delhi and Dehradun as commuting will not only get considerably convenient but also faster. Previously to would take around six and a half hours by road, but now, thanks to the upcoming Delhi-Dehradun Expressway, it will take just two to two-and-a-half hours. The expressway's opening timeline was officially announced in the Rajya Sabha by Union Road Transport and Highways Minister Nitin Gadkari. When will the Delhi-Dehradun Expressway become operational? The first phase of the Delhi-Dehradun Expressway will become operational in August 2025 when travellers will be able to use certain parts of the expressway while the entire project is expected to be completed by October 2025. With this, commuters will get full travel access between the two cities. Upon opening, the 210 km distance between Delhi and Dehradun can be covered in just 2 to 2.5 hours, a huge time reduction from the current 6–6.5 hours. Toll-Free Access The first 18 km stretch from Akshardham to Loni will remain toll-free to facilitate the travel experience travel for daily commuters. Tolls will be applicable for the remaining distance based on the stretch used. Also, this move is expected to reduce congestion and improve accessibility for local travelers. Seamless travel at 100 KMPH The newly inaugurated section will function as a key entry and exit point for Dehradun via the Saharanpur route. It also extends the existing 12 km elevated road, ensuring seamless movement for vehicles traveling to and from Dehradun. The speed limit allowed on this expressway is 100 km/h to ensure quick and smooth travel and save time. Total cost, completion date, and route The total cost of building this high-speed, access-controlled expressway is estimated at Rs 11,868.6 crore. This Expressway is scheduled to be fully operational by October 2025. The expressway starts from Akshardham in East Delhi and passes through Baghpat, Shamli, Muzaffarnagar, and Saharanpur, finally reaching Dehradun in Uttarakhand. Other infrastructure includes flyovers, underpasses, service lanes, and sound barriers for effortless traffic flow and safety. Key features One of the standout features of the Delhi-Dehradun Expressway is a 35 km elevated road, divided into four major phases. The first phase comprises a 32 km elevated section from Delhi to Baghpat, which can be covered in just 25 minutes. The second phase spans a 118 km greenfield corridor from Baghpat to Saharanpur, featuring over 60 underpasses and 4 interchanges. The expressway has a 14 km wildlife underpass to allow safe passage for animals, ensuring their natural movement is not disrupted by the high-speed traffic.


Hans India
2 hours ago
- Hans India
PM Modi to attend millennium celebrations of Chola emperor's maritime expedition in TN tomorrow
Chennai: Prime Minister Narendra Modi will attend a series of high-profile programmes in Tamil Nadu on Sunday, July 27, including the millennium celebrations of Rajendra Chola I's maritime expedition and the commencement of the Gangaikonda Cholapuram temple's construction. In a post on social media platform X, the Prime Minister wrote: 'Tomorrow, 27th July will witness a very special programme to mark a thousand years of the maritime expedition of the great Rajendra Chola I to South East Asia and the commencement of the construction of the iconic Gangaikonda Cholapuram temple, a shining example of Chola architecture. It is our privilege that a commemorative coin honouring Rajendra Chola I is being released, also celebrating the Aadi Thiruvathirai festival.' Meanwhile, Tamil Nadu Chief Minister M.K. Stalin, currently recovering at Apollo Hospitals in Chennai, has deputed Finance Minister Thangam Thennarasu to submit a memorandum to the visiting Prime Minister. The memorandum outlines key demands related to the state's financial and developmental concerns. In his post on X, Stalin said: 'Due to my hospitalisation, I have sent a petition containing the requests to be presented to the Honorable Prime Minister visiting Tamil Nadu through the Chief Secretary. Minister Thangam Thennarasu will present it to the Honourable Prime Minister.' Security has been significantly tightened in Tiruchirappalli and Ariyalur districts ahead of the Prime Minister's visit to Gangaikonda Cholapuram. A five-tier security arrangement has been in place since Thursday, with deployment of the Special Protection Group (SPG), Tamil Nadu police, and central security agencies. The Prime Minister is expected to arrive at Tiruchy airport around 10:30 p.m. on Saturday, after inaugurating the expanded terminal at Thoothukudi airport. PM Modi's visit comes immediately after returning from official trips to the UK and the Maldives. He will first arrive in Tuticorin, where he will unveil a series of infrastructure and connectivity initiatives aimed at boosting the state's economic and industrial growth. In a significant step toward enhancing regional air infrastructure, the Prime Minister will inaugurate the new terminal building at Tuticorin Airport, built at a cost of around Rs 450 crore. He will stay overnight at the tourist bungalow in Tiruchy, which has also come under intense security cover. On Sunday morning, PM Modi will travel by helicopter to Ariyalur to participate in the Rajendra Chola I millennium celebrations at Gangaikonda Cholapuram. SPG teams have conducted security sweeps at all critical points, including Tiruchy airport, the tourist bungalow, and the event venue. Bomb Detection and Disposal Squad (BDDS) teams have scanned the entire route, and residents near key locations have been asked to adhere strictly to police instructions. Local authorities have also enforced a ban on flying drones and unmanned aerial vehicles from July 24 to July 27. District administrations have been instructed to maintain heightened vigilance throughout the Prime Minister's visit, which concludes on Sunday evening. The event is being held to honour the maritime prowess and architectural legacy of the Chola empire.