Pittsfield continues street improvement projects throughout the city
PITTSFIELD, Mass. (WWLP) – The city of Pittsfield is advising residents that another round of street improvements are scheduled for this week, impacting on-street parking in certain areas.
On Tuesday and Wednesday, loam and seed will be distributed on Backman Avenue, Daniels Avenue, and Jason Street. Crews will also begin to raise structures on Newell Street beginning on Tuesday, which will continue until Thursday.
Black bear caught peeking through trees in Amherst
Orlando Avenue, Ridge Avenue, Backman Avenue, and Jason Street will each receive a final round of paving on Thursday and Friday. Throughout the week, all streets undergoing maintenance and construction will not allow on-street parking from Tuesday to Friday between 6:00 a.m. and 6:00 p.m.
These street improvement projects will be conducted by crews contracted by the city of Pittsfield. MassDOT crews will also be conducting the following work during this week:
Adjusting structures and fixing curbing on North Street from the Lanesborough town line tothe entrance of Berkshire Medical Center (5/27-5/30)
Traffic loops at several intersections on First Street (5/27-5/29)
Traffic loops on South Street (5/30)
All street improvement work is weather-dependent and subject to change. Drivers in the area are urged by city officials to use caution.
WWLP-22News, an NBC affiliate, began broadcasting in March 1953 to provide local news, network, syndicated, and local programming to western Massachusetts. Watch the 22News Digital Edition weekdays at 4 p.m. on WWLP.com.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
a day ago
- Yahoo
Closures in place on busy Mass. highway after metal panels fly off truck, smash car
Lane closures are in place on a busy Massachusetts highway after metal panels flew off a flatbed truck and struck a vehicle in a crash during the Thursday morning commute. The panels came loose on Route 128 in Burlington near Route 3 at Exit 50. Aerial video of the scene showed a vehicle in the left travel lane on the northbound side of the highway with a smashed windshield and heavy front-end damage. Several panels could be seen strewn on both sides of the highway, blocking travel lanes. 'Temporary lane closures are currently in place on I-95 northbound and southbound,' MassDOT said in an advisory. 'Lane closures are in place to allow crews to complete cleanup of debris.' MassDOT noted that the closures are expected to remain in place through the morning commute and urged drivers to avoid the area. There was no immediate word on injuries to those involved in the crash. An investigation is ongoing. This is a developing story. Check back for updates as more information becomes available. Download the FREE Boston 25 News app for breaking news alerts. Follow Boston 25 News on Facebook and Twitter. | Watch Boston 25 News NOW
Yahoo
2 days ago
- Yahoo
Vehicle fire shuts down lane on Mass. Pike in Blandford
BLANDFORD, Mass. (WWLP) – A vehicle fire has closed down a lane on the Mass. Pike in Blandford on Wednesday. Rising temperatures pose risk of vehicular heatstroke The vehicle fire occurred on the westbound side near mile marker 30.6. The left lane has reopened, however, the right lane remains closed at this time. It is advised for drivers to use another route when traveling and to expect delays. The cause of the fire is being investigated. WWLP-22News, an NBC affiliate, began broadcasting in March 1953 to provide local news, network, syndicated, and local programming to western Massachusetts. Watch the 22News Digital Edition weekdays at 4 p.m. on Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Yahoo
3 days ago
- Yahoo
Survey finds interest in buying electric vehicles declining
BOSTON (SHNS) – Interest in electric vehicle purchases among U.S. adults drifted to its lowest level since 2019, according to a new AAA survey. The automobile group reported Tuesday that 16% of adults reported they were either likely or very likely to buy a fully electric vehicle as their next car. That's down from 18% in 2024, 23% in 2023, and 25% in 2022. Despite 75 new electric vehicle models being introduced in the past four years, the percentage of consumers indicating they would be unlikely or very unlikely to purchase an EV rose from 51% in 2022 to 63% in 2025. The survey itself was not available, but AAA said it was conducted March 6-10 and involved online and phone interviews with 1,128 U.S. adults. The margin of error was plus or minus 4 percentage points. Barriers to the EV movement, according to the survey, include high battery repair costs, EV purchase prices, a perceived unsuitability of EVs for long-distance travel, a lack of convenient public charging stations and a fear of running out of charge while driving. Respondents cited gas savings, environmental concerns and lower maintenance costs as their top motivations to purchase an electric vehicle, according to AAA, which said its 2024 analysis 'found that EVs had the lowest fuel cost and lowest maintenance cost of any vehicle type.' Taking a longer view, the percentage of U.S. drivers who believe that most cars will be electric within the next 10 years has declined from 40% in 2022 to 23% this year, according to the survey. WWLP-22News, an NBC affiliate, began broadcasting in March 1953 to provide local news, network, syndicated, and local programming to western Massachusetts. Watch the 22News Digital Edition weekdays at 4 p.m. on Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.