logo
‘Forgotten Where They All Came From': Councilor Lashes Out Over Pay Equity

‘Forgotten Where They All Came From': Councilor Lashes Out Over Pay Equity

Scoop27-05-2025

An Invercargill councillor says the people who made changes to the Equal Pay Act have forgotten where they came from.
Former-New Zealand First MP Ria Bond made the comments after it was revealed she was one of 10 former female MPs joining the 'People's Select Committee on Pay Equity'.
The unofficial committee went public on Monday with its plan to take submissions and examine changes to the Act, which were passed under urgency earlier this month.
The changes make it more difficult for those who believe they are being unfairly paid to make a claim.
'(I) just feel really let down by this Government and the way that they chose to have it go under no scrutiny and through urgency, with no input from anyone that actually works in these sectors,' Bond said.
'I think they've forgotten where they all come from.'
The new committee is spearheaded by former National MP Dame Marilyn Waring, with its members all volunteering their time.
Bond was pleased the group had formed, and said it showed the power of people to "make a movement when things are so drastically wrong'.
Waring and Bond are joined by former Labour MPs Lianne Dalziel, Steve Chadwick, Nanaia Mahuta and Lynne Pillay; former National MPs Jackie Blue, Jo Hayes and Belinda Vernon; and former Green MP Sue Bradford.
Waring told reporters earlier today there was a good spread of women who wanted to hear the evidence Parliament should have heard.
They would reach out to key parties that previously submitted on the legislation as well as 33 groups whose claims were affected by the changes, she said.
Submissions to the committee are open until 31 July with an initial hearing to be held in Wellington on 11 August.
More hearings will be announced at a later date with a draft report prepared before the end of the year.
Bond was a member of parliament with New Zealand First from 2015 to 2017. She was elected to Invercargill City Council in 2022.
Workplace Relations Minister Brooke van Velden announced the changes to the pay equity process earlier this month.
Claims have been able to progress without strong evidence of undervaluation and there have been very broad claims where it is difficult to tell whether differences in pay are due to sex-based discrimination or other factors, she said at the time.
The changes include raising the threshold of professions predominantly performed by female employees from 60 percent to 70 percent.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Full Speed Ahead For Fast-Track Projects
Full Speed Ahead For Fast-Track Projects

Scoop

time8 hours ago

  • Scoop

Full Speed Ahead For Fast-Track Projects

Press Release – New Zealand Government The Fast-track Approvals Act contains a list of 149 projects which, from 7 February, have been able to apply to the Environmental Protection Authority (EPA) for consideration by an expert panel. Minister for Infrastructure Minister for RMA Reform Hon Shane Jones Minister for Regional Development Today marks four months since the Fast-track Approvals Act opened for project applications. The projects which have applied for Fast-track approvals could contribute 12,208 new homes and 1,136 new retirement units, if approved. On Friday, 6 June, associate panel convener Helen Atkins appointed the fourth expert panel to oversee the Milldale project. It's been four months since the Fast-track Approvals system opened for business and the statistics show strong progress toward making it quicker and easier to build the projects New Zealand needs for economic growth, RMA Reform and Infrastructure Minister Chris Bishop and Regional Development Minister Shane Jones say. 'The Fast-track Approvals Act, part of the coalition agreement between National and NZ First, was signed into law just before Christmas and opened for project applications on 7 February this year. The Act helps cut through the tangle of red and green tape and the jumble of approvals processes that has, until now, held New Zealand back from much-needed economic growth,' Mr Bishop says. 'The Fast-track Approvals Act contains a list of 149 projects which, from 7 February, have been able to apply to the Environmental Protection Authority (EPA) for consideration by an expert panel. The expert panels consider each application, decide whether or not each project receives approval, and attach any necessary conditions to those approvals. 'In the four months since the Fast-track one-stop shop approvals regime officially opened for project applications, we've seen good progress on a range of applications for projects that, if approved, will grow New Zealand's economy and sort out our infrastructure deficit, housing crisis, and energy shortage, instead of tying essential projects up in knots for years at a time. 'As of this week, 15 substantive applications for listed projects have been lodged and found complete and within scope by the EPA. Of these, twelve applications have no competing applications or existing resource consents; two applications are undergoing checks for competing applications or existing resource consents; and one application was found to have an existing resource consent and can therefore not proceed any further through Fast-track. 'Eight of the 12 complete applications that are complete, within scope and with no competing applications or existing resource consents are being considered by the panel convenor who will soon establish expert panels for each project. 'Three are currently before expert panels for consideration, with a fourth expert panel being appointed on 6 June. These four projects are Delmore (residential subdivision and roading interchange in Orewa), (Maitahi Village (residential development including commercial centre and a retirement village in Nelson), Bledisloe North Wharf and Fergusson North Berth Extension (new and extended wharf facilities at Port of Auckland), Milldale (earthworks and site work for approximately 1,100 residential allotments). 'The first expert panels' final decisions are expected in mid-September this year. 'Projects not listed in the Act can also apply for referral to an expert panel through the same Fast-track website. Their applications go first to me as Infrastructure Minister for consideration, which includes inviting written comments from the Minister for the Environment and any other Ministers with relevant portfolios, before the deciding whether to refer the project for Fast-track. 'To date I have referred three projects to the Fast-track process, meaning they can now submit substantive applications to the EPA. These three projects are the Ayrburn Screen Hub (a film and television production facility) in Otago; Ashbourne (a development of 530 homes and 250 retirement units) in Waikato; and the Grampians Solar Project (a solar farm expected to generate 300 megawatts) in Canterbury.' 'As well as delivering a strong pipeline of projects into the future, Fast-track is well on track to deliver a much boost to the economy now, with up to 17 projects whose applications are underway expected to commence this year, if approved. This will be welcome news for the construction sector,' Mr Jones says. 'The projects that have applied for Fast-track approvals to date would contribute an additional 12,208 new homes across the Auckland, Nelson and Otago regions, and an additional 1,136 new retirement units in Auckland and Nelson.' Notes: In Fast-track's first four months there have been: Referral Applications · 3 projects referred by the Minister for Infrastructure – (can now apply for a substantive application): Ashbourne Ayrburn Screen Hub Grampians Solar Project Substantive Applications 15 substantive applications found to be complete, of those: 1 application found to have an existing resource consent – can no longer proceed 2 applications currently undergoing checks for competing applications / existing resource consents 12 projects found to be complete without competing applications or existing resource consents (all those that have gone to the Panel Convener prior to expert panel) With EPA for completeness, competing applications or existing resource consent checks: Kings Quarry Rangitoopuni 12 applications have gone to the Panel Convener, of those: 8 are with the panel convener to establish an expert panel 4 projects currently before expert panels, or have an expert panel appointed (have gone from the panel convener to the expert panel) With Panel Convener: Taranaki VTM Ryans Road Stella Passage Tekapo Power Scheme Waihi North Drury Sunfield Drury Quarry Expert Panels appointed for: Delmore Maitahi Bledisloe Milldale Content Sourced from Original url

Full Speed Ahead For Fast-Track Projects
Full Speed Ahead For Fast-Track Projects

Scoop

time9 hours ago

  • Scoop

Full Speed Ahead For Fast-Track Projects

Press Release – New Zealand Government The Fast-track Approvals Act contains a list of 149 projects which, from 7 February, have been able to apply to the Environmental Protection Authority (EPA) for consideration by an expert panel. Minister for Infrastructure Minister for RMA Reform Hon Shane Jones Minister for Regional Development Today marks four months since the Fast-track Approvals Act opened for project applications. The projects which have applied for Fast-track approvals could contribute 12,208 new homes and 1,136 new retirement units, if approved. On Friday, 6 June, associate panel convener Helen Atkins appointed the fourth expert panel to oversee the Milldale project. It's been four months since the Fast-track Approvals system opened for business and the statistics show strong progress toward making it quicker and easier to build the projects New Zealand needs for economic growth, RMA Reform and Infrastructure Minister Chris Bishop and Regional Development Minister Shane Jones say. 'The Fast-track Approvals Act, part of the coalition agreement between National and NZ First, was signed into law just before Christmas and opened for project applications on 7 February this year. The Act helps cut through the tangle of red and green tape and the jumble of approvals processes that has, until now, held New Zealand back from much-needed economic growth,' Mr Bishop says. 'The Fast-track Approvals Act contains a list of 149 projects which, from 7 February, have been able to apply to the Environmental Protection Authority (EPA) for consideration by an expert panel. The expert panels consider each application, decide whether or not each project receives approval, and attach any necessary conditions to those approvals. 'In the four months since the Fast-track one-stop shop approvals regime officially opened for project applications, we've seen good progress on a range of applications for projects that, if approved, will grow New Zealand's economy and sort out our infrastructure deficit, housing crisis, and energy shortage, instead of tying essential projects up in knots for years at a time. 'As of this week, 15 substantive applications for listed projects have been lodged and found complete and within scope by the EPA. Of these, twelve applications have no competing applications or existing resource consents; two applications are undergoing checks for competing applications or existing resource consents; and one application was found to have an existing resource consent and can therefore not proceed any further through Fast-track. 'Eight of the 12 complete applications that are complete, within scope and with no competing applications or existing resource consents are being considered by the panel convenor who will soon establish expert panels for each project. 'Three are currently before expert panels for consideration, with a fourth expert panel being appointed on 6 June. These four projects are Delmore (residential subdivision and roading interchange in Orewa), (Maitahi Village (residential development including commercial centre and a retirement village in Nelson), Bledisloe North Wharf and Fergusson North Berth Extension (new and extended wharf facilities at Port of Auckland), Milldale (earthworks and site work for approximately 1,100 residential allotments). 'The first expert panels' final decisions are expected in mid-September this year. 'Projects not listed in the Act can also apply for referral to an expert panel through the same Fast-track website. Their applications go first to me as Infrastructure Minister for consideration, which includes inviting written comments from the Minister for the Environment and any other Ministers with relevant portfolios, before the deciding whether to refer the project for Fast-track. 'To date I have referred three projects to the Fast-track process, meaning they can now submit substantive applications to the EPA. These three projects are the Ayrburn Screen Hub (a film and television production facility) in Otago; Ashbourne (a development of 530 homes and 250 retirement units) in Waikato; and the Grampians Solar Project (a solar farm expected to generate 300 megawatts) in Canterbury.' 'As well as delivering a strong pipeline of projects into the future, Fast-track is well on track to deliver a much boost to the economy now, with up to 17 projects whose applications are underway expected to commence this year, if approved. This will be welcome news for the construction sector,' Mr Jones says. 'The projects that have applied for Fast-track approvals to date would contribute an additional 12,208 new homes across the Auckland, Nelson and Otago regions, and an additional 1,136 new retirement units in Auckland and Nelson.' Notes: In Fast-track's first four months there have been: Referral Applications · 3 projects referred by the Minister for Infrastructure – (can now apply for a substantive application): Ashbourne Ayrburn Screen Hub Grampians Solar Project Substantive Applications 15 substantive applications found to be complete, of those: 1 application found to have an existing resource consent – can no longer proceed 2 applications currently undergoing checks for competing applications / existing resource consents 12 projects found to be complete without competing applications or existing resource consents (all those that have gone to the Panel Convener prior to expert panel) With EPA for completeness, competing applications or existing resource consent checks: Kings Quarry Rangitoopuni 12 applications have gone to the Panel Convener, of those: 8 are with the panel convener to establish an expert panel 4 projects currently before expert panels, or have an expert panel appointed (have gone from the panel convener to the expert panel) With Panel Convener: Taranaki VTM Ryans Road Stella Passage Tekapo Power Scheme Waihi North Drury Sunfield Drury Quarry Expert Panels appointed for: Delmore Maitahi Bledisloe Milldale Content Sourced from Original url

Manawatū Gorge Replacement Opens Toll-Free
Manawatū Gorge Replacement Opens Toll-Free

Scoop

time10 hours ago

  • Scoop

Manawatū Gorge Replacement Opens Toll-Free

Thanks to a successful community-led campaign backed by Labour, Lower North Island locals are today celebrating the toll-free opening of Te Ahu a Turanga – Manawatū Tararua Highway. Local Labour MPs Tangi Utikere and Kieran McAnulty wore their Toll-Free Tararua t-shirts to celebrate the opening of the new road without the National Government's proposed toll. 'It is such a relief for locals to have the Manawatū Tararua Highway open today, after years of work went in to replace the old Manawatū Gorge,' Labour transport spokesperson Tangi Utikere said. 'We had to campaign hard against a National Government that wanted to slap a toll on locals who had already waited a long time for this road to open. 'That was greedy and uncalled for, given the road had already been funded by Labour. 'It took a huge effort by locals, and strong support from people in surrounding areas who stood against National's toll. 'It's a beautiful new road, and I look forward to using it regularly to drive between the mighty electorates of Palmerston North and Wairarapa,' Tangi Utikere said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store