logo
Second airport consultation period set after community calls heard

Second airport consultation period set after community calls heard

PHOTO: ALLIED PRESS FILES
The Wānaka community has more time to have a say on the future of the airport, after the first round of feedback was completed.
French consultant group Egis has been contracted by the Queenstown Lakes District Council to seek independent feedback from stakeholders and community members, and it has extended the timeline of the independent review.
In June, Egis hosted two in-person community sessions in Wānaka, complemented by an online feedback platform that remained open until July 15.
Participants now have the opportunity to provide further input during a second round of consultation.
In June, the Wānaka Stakeholders Group launched its own proposal for the airport, advocating for a development model centred on strong local input.
Group chairwoman Meg Taylor said the council was proceeding with a "dual process" — an application for qualifying aerodrome certification and a Wānaka Airport future review, both to be completed by 2027.
Ms Taylor said the council was asking the Upper Clutha community what it wanted to happen at the airport, but risked pre-determining that outcome.
The second input period will be from August 25 to September 18 via letstalk.qldc.govt.nz/Wānaka-airport-future-review.
This will be supported by two in-person drop-in sessions on August 29 and 30, venues and times to be confirmed.
Kerr Forbes, aviation lead for Egis in Australia and New Zealand, said "we've heard clearly from the community that they value this opportunity to be involved, and they want more time to contribute".
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Expect Formula E tech to end up in future Nismo models
Expect Formula E tech to end up in future Nismo models

NZ Autocar

timea day ago

  • NZ Autocar

Expect Formula E tech to end up in future Nismo models

Nissan may use its Formula E team to develop prototype versions of electric Nismo performance models in future. Nissan's Formula E team boss, Tommaso Volpe, said there have been internal talks about how the French team can help in this endeavour. Read our review of the Nissan Z Nismo. The Japanese firm currently offers a Nismo-badged Ariya. However, new company boss, Ivan Espinosa, stated in the past that the firm had 'exciting plans' for future sports cars. Nissan is after a handful of Nismo offerings. Evidently, the French Formula E team may develop 'some prototypes based on normal chassis that can help the Nismo division to enhance the performance of electric cars'. Nissan has even said that it is considering a collaboration for the development of future models. The Formula E team could build a prototype version. And then Nissan engineers could use that as a framework to develop future products. Expect any such vehicle to use the twin-motor all-wheel drive layout of a Formula E racer. The concept for the Formula E team would be to help Nismo optimise the efficiency of electric performance cars. They would also aid in refining traction management of the AWD layout. For the next racing season, Formula E will introduce a Gen4 technical package. The powertrains will feature permanent all-wheel drive with a pair of motors producing roughly 600kW, up from the 350kW of the current cars. In the past, Formula E cars have drawn from manufacturer experience. Henceforth, the flow would be in the opposite direction. 'The level of performance and efficiency will be pushed to the limit' said Volpe. 'There is a huge possibility of transfer with our future products. 'The regulations of Gen4 have been written in an open conversation with manufacturers, and…all-wheel drive is the trend for the core business in the future.'

US-EU strike 15% trade tariff deal; aid airdrops reach Gaza
US-EU strike 15% trade tariff deal; aid airdrops reach Gaza

National Business Review

time3 days ago

  • National Business Review

US-EU strike 15% trade tariff deal; aid airdrops reach Gaza

Kia ora and welcome to your Monday summary of global business and political news. First to developing news, and the United States and European Union have reached a trade deal in the past several hours ahead of the August 1 deadline, the BBC reported. US President Donald Trump and European Commission President Ursula von der Leyen held talks in Scotland that involved "tough negotiations". The European Union faced a 30% tariff from August, but von der Leyen confirmed that had dropped to 15% across the board. "We have reached a deal. It's a good deal for everybody," Trump said overnight. "It's going to bring us closer together ... it's a partnership in a sense." Von der Leyen said it was a "huge deal" following careful and tough negotiations. Meanwhile, Trump does not expect to reach a deal with Canada, after hard balling on both sides to carve out an agreement, the BBC said. Canadian Prime Minister Mark Carney said his country would not accept a 'bad deal' or rush into an agreement. Canadian Prime Minister Mark Carney. In China, industrial profits fell for a second consecutive month, amid competition and US tariffs, Bloomberg reported. Profits fell 4.3% last month, compared with a year earlier, after a 9.1% fall in May. Exports to the US fell, which squeezed profit margins for Chinese manufacturers. That also risked a decline in business confidence and flow through to lower investment and jobs. In the Middle East, Israel started a 'tactical pause' in fighting in three areas of Gaza to address the declining humanitarian situation, Al Jazeera reported. The suspension of military operations from 10am to 8pm local time every day was until further notice. The military also said it would designate secure routes to help aid agencies deliver food and other supplies. Aid airdrops into Gaza, including packages of flour, sugar, and canned food, were delivered over the weekend. French President Emmanual Macron said his country would formally recognise a Palestinian state in September, at the annual UN General Assembly. BBC correspondent Lyse Doucet said that recognition was largely symbolic and profoundly political. The US and Israel condemned the move. Palestinians welcomed the pledge by France and urged other countries to do the same, Al Jazeera reported. 'We hope it will be implemented, and we hope that most or all countries around the world will follow France's lead in recognising the Palestinian people's right to an independent state,' Nabil Abdel Razek, a resident of Ramallah in the occupied West Bank, told AFP. Gaza kids charity organisation distributes food. In other news, Intel planned to proceed with plans to cut 15% of its global workforce, as the chipmaker attempts a turnaround, CNN reported. CEO Lip-Bu Tan said that turnaround would take time, but there were 'clear opportunities' to improve its performance. Intel said the staff cuts were 'designed to create a faster-moving, flatter and more agile organisation'. The company also said it's scrapping projects in Germany and Poland as part of its cost cutting measures. Airline manufacturer Boeing faced the risk of strike action after union workers rejected an offer that would boost their salaries by 20% over four years, Bloomberg reported. The International Association of Machinists and Aerospace Workers voted overwhelmingly against the new terms. The proposal 'fell short of addressing the priorities and sacrifices' of the company's skilled workforce, the union said. 'Our members are standing together to demand a contract that respects their work and ensures a secure future.' Finally, Meta CEO Mark Zuckerberg announced Shengjia Zhao, the co-creator of OpenAI's ChatGPT, was appointed as chief scientist of Meta Superintelligence Labs, CNBC reported. Zuckerberg announced the Meta Superintelligence Labs initiative in June. Zhao will work directly with Zuckerberg. 'Shengjia has already pioneered several breakthroughs including a new scaling paradigm and distinguished himself as a leader in the field,' Zuckerberg said. 'I'm looking forward to working closely with him to advance his scientific vision.'

Extensive Infrastructure Upgrades To Futureproof Upper Clutha's Wastewater Needs
Extensive Infrastructure Upgrades To Futureproof Upper Clutha's Wastewater Needs

Scoop

time3 days ago

  • Scoop

Extensive Infrastructure Upgrades To Futureproof Upper Clutha's Wastewater Needs

Upgrades to Hāwea, Wānaka, and Albert Town's wastewater infrastructure are set to begin in early September 2025, responding to and futureproofing Upper Clutha's wastewater needs, providing additional capacity across the network, and helping to further protect the natural environment too. Queenstown Lakes District Council (QLDC) General Manager Property & Infrastructure, Tony Avery said the project would see an extensive range of work undertaken to improve local infrastructure and provide for current and future housing in the area. 'Existing infrastructure in Wānaka and Albert Town is fast approaching its capacity to effectively convey wastewater out to Project Pure Wastewater Treatment Plant (WWTP), and as many in Hāwea will be aware, the township's treatment plant has reached capacity too,' said Mr Avery. To address these constraints, the Upper Clutha Wastewater Conveyance Scheme project will see a range of improvements made to the area's wastewater network, including: A new wastewater pump station (WWPS) at Domain Road in Hāwea 12.5km of new wastewater pipeline connecting Domain Road to existing infrastructure at the Albert Town WWPS Upgrades to the existing Riverbank Road WWPS 7.4km of new wastewater pipeline connecting Riverbank Road WWPS and Albert Town WWPS to Project Pure. 'These upgrades will see wastewater from the Hāwea township being treated and disposed of at Project Pure, enable future connection of Hāwea Flats and Hāwea Campground, and allow for flows from Wānaka and Albert Town to be managed by two pump stations,' added Mr Avery. 'Ultimately, the network will be able to handle Upper Clutha's wastewater needs well into the future, treatment and disposal will be improved, and the network will be more resilient in the event of any unforeseen issues.' Physical work on the Upper Clutha Wastewater Conveyance Scheme is expected to begin in September 2025, with construction anticipated to be completed by early 2027, nearly a year earlier than initially anticipated. Hāwea's existing wastewater treatment plant will be decommissioned once the township's new pump station and pipeline are operating. As with any large construction project some disruption is likely once work on these upgrades begins, and will include noise, vibration, traffic management, and increased construction machinery movements around various work sites between Hāwea, Albert Town, and Project Pure near Wānaka Airport. Large parts of the new pipeline running from Hāwea to Project Pure will be installed on the side of State Highway 6 (SH6) or within rural road corridors, meaning most of the project's impacts will be limited to sections of temporary traffic management. Other key impacts will include disruption on both Camphill Road Bridge and Albert Town Bridge when installation of the new pipeline occurs in these locations. A detailed delivery plan is currently being worked on by the Contractor, and more information about these works and what to expect will be shared once this is completed.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store