
Dubai Municipality completes Dhs277 million Nad Al Sheba 3 drainage project
Dubai Municipality has announced the completion of a sewerage and rainwater drainage network development project in Nad Al Sheba 3, at a total cost of Dhs277 million.
Serving an area of 340 hectares and encompassing up to 300 plots of land, the project forms part of the Municipality's strategic plans to upgrade and future-proof Dubai's infrastructure, supporting the emirate's vision of becoming a global model for sustainable, smart urban development.
Eng. Marwan Ahmed Bin Ghalita, Director-General of Dubai Municipality, said, "This project is part of Dubai Municipality's strategic efforts to develop and deliver world-class infrastructure that keeps pace with Dubai's ambitions for global leadership and urban sustainability. Completing the Nad Al Sheba 3 project is a significant step towards connecting all areas of Dubai to a fully integrated sewerage and rainwater drainage network, ensuring the emirate's readiness to face future climate challenges for the next 100 years. These efforts are part of two of the region's largest strategic infrastructure programmes: the Dhs30 billion 'Tasreef' project to develop Dubai's rainwater drainage network, and the Dhs80 billion sewerage system upgrade programme.'
He added, "Dubai Municipality remains committed to expediting the delivery of integrated development works for sewerage and rainwater collection systems, in line with the highest international standards. By applying advanced technologies and smart solutions, we aim to increase operational performance, ensure service continuity, and improve quality of life for Dubai's residents - reinforcing the emirate's status among the world's leading cities for advanced infrastructure.'
Under the project, Dubai Municipality has provided Nad Al Sheba 3 with an advanced sewerage network spanning approximately 24 kilometres, with pipeline diametres ranging from 200 to 800 millimetres.
This network will enhance public health standards, maintain environmental sustainability, and facilitate more efficient future maintenance works. An additional 11 kilometres of household connections have been constructed to link citizens' homes, new residential units, and other properties directly to the main network.
In terms of rainwater drainage, the Municipality has installed an advanced pumping station with a capacity of 4,000 litres per second, improving rainwater management and ensuring efficient water flow towards the main network. This is complemented by a 31-kilometre gravity-based drainage pipeline network, with diameters ranging from 250 to 1,500 millimetres, which will maintain system readiness during periods of heavy rainfall and mitigate potential flooding risks.
WAM

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Gulf Today
5 hours ago
- Gulf Today
Dubai Municipality completes Dhs277 million Nad Al Sheba 3 drainage project
Dubai Municipality has announced the completion of a sewerage and rainwater drainage network development project in Nad Al Sheba 3, at a total cost of Dhs277 million. Serving an area of 340 hectares and encompassing up to 300 plots of land, the project forms part of the Municipality's strategic plans to upgrade and future-proof Dubai's infrastructure, supporting the emirate's vision of becoming a global model for sustainable, smart urban development. Eng. Marwan Ahmed Bin Ghalita, Director-General of Dubai Municipality, said, "This project is part of Dubai Municipality's strategic efforts to develop and deliver world-class infrastructure that keeps pace with Dubai's ambitions for global leadership and urban sustainability. Completing the Nad Al Sheba 3 project is a significant step towards connecting all areas of Dubai to a fully integrated sewerage and rainwater drainage network, ensuring the emirate's readiness to face future climate challenges for the next 100 years. These efforts are part of two of the region's largest strategic infrastructure programmes: the Dhs30 billion 'Tasreef' project to develop Dubai's rainwater drainage network, and the Dhs80 billion sewerage system upgrade programme.' He added, "Dubai Municipality remains committed to expediting the delivery of integrated development works for sewerage and rainwater collection systems, in line with the highest international standards. By applying advanced technologies and smart solutions, we aim to increase operational performance, ensure service continuity, and improve quality of life for Dubai's residents - reinforcing the emirate's status among the world's leading cities for advanced infrastructure.' Under the project, Dubai Municipality has provided Nad Al Sheba 3 with an advanced sewerage network spanning approximately 24 kilometres, with pipeline diametres ranging from 200 to 800 millimetres. This network will enhance public health standards, maintain environmental sustainability, and facilitate more efficient future maintenance works. An additional 11 kilometres of household connections have been constructed to link citizens' homes, new residential units, and other properties directly to the main network. In terms of rainwater drainage, the Municipality has installed an advanced pumping station with a capacity of 4,000 litres per second, improving rainwater management and ensuring efficient water flow towards the main network. This is complemented by a 31-kilometre gravity-based drainage pipeline network, with diameters ranging from 250 to 1,500 millimetres, which will maintain system readiness during periods of heavy rainfall and mitigate potential flooding risks. WAM


Dubai Eye
6 hours ago
- Dubai Eye
AED 277 million drainage project completed in Dubai's Nad Al Sheba 3
A major infrastructure project has been completed in Dubai's Nad Al Sheba 3, featuring an advanced sewerage and rainwater drainage network worth AED 277 million. Dubai Municipality says the development spans 340 hectares and serves around 300 land plots, as part of its broader strategy to future-proof the city's infrastructure. The new system includes 24 km of sewerage pipelines, an additional 11 km of household connections and a high-capacity rainwater pumping station capable of handling 4,000 litres of water per second. A 31 km gravity-based drainage network has also been installed to improve stormwater flow and reduce flooding risks. Eng. Marwan Ahmed bin Ghalita, Director General of Dubai Municipality, says the initiative supports Dubai's readiness for climate challenges over the next century and aligns with two major programmes: the AED 30 billion 'Tasreef' rainwater initiative and the AED 80 billion upgrade of Dubai's sewerage system. #DubaiMunicipality has completed a climate-resilient drainage project in Nad Al Sheba 3, enhancing service efficiency and livability in the area. Watch the video for the full story. #DubaiMoreLiveable — بلدية دبي | Dubai Municipality (@DMunicipality) June 18, 2025


Arabian Business
8 hours ago
- Arabian Business
Dubai Municipality completes $75m sewerage and rainwater drainage network in Nad Al Sheba
Dubai Municipality has completed a AED277 million ($75.4 million) sewerage and rainwater drainage project in Nad Al Sheba 3, enhancing infrastructure for 300 plots and 340 hectares as part of its future-ready urban strategy. Dubai Municipality has announced the successful completion of a major sewerage and rainwater drainage development in Nad Al Sheba 3, delivered at a total cost of AED277m ($75.4m). The project is part of the authority's strategic infrastructure roadmap to enhance the city's resilience and support its transition into a global benchmark for smart, sustainable urban living. Covering a 340-hectare area and serving around 300 land plots, the new network boosts public health, climate readiness, and urban service efficiency. Dubai drainage and sewers The initiative is a key part of the AED30bn ($8.2bn) 'Tasreef' programme for rainwater drainage and the AED80bn ($21.8bn) sewerage system upgrade project — two of the largest infrastructure strategies in the region. Marwan Ahmed bin Ghalita, Director-General of Dubai Municipality, said: 'This project is part of Dubai Municipality's strategic efforts to develop and deliver world-class infrastructure that keeps pace with Dubai's ambitions for global leadership and urban sustainability. 'Completing the Nad Al Sheba 3 project is a significant step towards connecting all areas of Dubai to a fully integrated sewerage and rainwater drainage network, ensuring the emirate's readiness to face future climate challenges for the next 100 years. 'Dubai Municipality remains committed to expediting the delivery of integrated development works for sewerage and rainwater collection systems, in line with the highest international standards. 'By applying advanced technologies and smart solutions, we aim to increase operational performance, ensure service continuity, and improve quality of life for Dubai's residents — reinforcing the emirate's status among the world's leading cities for advanced infrastructure.' Drainage project scope and features: Sewerage network: A 24km sewerage system with pipeline diameters ranging from 200mm to 800mm has been constructed, alongside 11 kilometres of household connections to link homes and residential units to the main network Rainwater drainage: A high-capacity pumping station with a discharge rate of 4,000 litres per second has been installed to manage stormwater flow efficiently. In addition, a 31km gravity-based pipeline network (250mm–1,500mm diameter) ensures optimal drainage during heavy rainfall and reduces flooding risks. The project underscores the Municipality's ongoing commitment to building advanced infrastructure that keeps pace with the emirate's long-term development vision.