Guanajuato Silver Files Technical Report for El Cubo Mineral Resource Estimate
VANCOUVER, BC / ACCESS Newswire / January 30, 2025 / Guanajuato Silver Company Ltd. (the 'Company' or 'GSilver') (TSXV:GSVR)(OTCQX:GSVRF) is pleased to announce that a new National Instrument ('NI') 43-101 Technical Report titled 'NI 43-101 Technical Report On The El Cubo And El Pinguico Silver Gold Complex, Guanajuato, Mexico' and dated effective August 1, 2024 (the 'Report') has been filed on Sedar at www.sedarplus.ca. The Report presents a new mineral resource estimate (the '2024 MRE') for GSilver's 100% owned El Cubo mine complex ('El Cubo') located in Guanajuato, Mexico. (See GSilver news release dated December 19, 2024 - Guanajuato Silver Provides New El Cubo Mineral Resource Estimate).
Highlights of the Report
Inferred mineral resources increased 85% over previous resource estimate* to 35.6 million silver-equivalent9 ounces ('AgEq'). See table below for assumptions regarding the calculation of AgEq.
Inferred mineral resource tonnes of 3,711 kt represents a 179% increase over the previous resource estimate*.
Indicated mineral resources of 3.9M AgEq9; after three years of substantial mining activity at El Cubo, the resources within the Indicated Resource category have declined by just 23% from the previous estimate*.
Exploration expansion potential remains high; drilling to convert inferred resources to Indicated Resources commenced in January 2025.
The new El Cubo mineral resource estimate is part of a scheduled program to update GSilver's NI 43-101 technical reports and resource estimates for all of its producing mines in Mexico, which includes the El Cubo Mine complex, the Valenciana Mines Complex, and the San Ignacio mine, all located within the state of Guanajuato, and the Topia mine located in northwestern Durango.
The 2024 MRE was prepared by APEX Geoscience Ltd. ('APEX'), with an effective date of August 1, 2024. The 2024 MRE supersedes and updates the previous mineral resource estimate for the El Cubo mine, disclosed previously by the Company in the technical report entitled 'Technical Report - El Cubo/El Pinguico Silver Gold Complex Project' with an effective date of December 31, 2023 (the 'Prior Technical Report')*. The Report replaces the Prior Technical Report as the current NI 43-101 technical report on El Cubo.
2024 Mineral Resource Estimate
Mineralization at El Cubo consists of silver and gold occurring in several stratigraphic formations, with the middle Tertiary La Bufa, Guanajuato, and Calderones formations being the most important hosts. Mineralization at El Cubo is typical of classic high-grade silver-gold banded epithermal vein deposits, with the most productive veins being sub-parallel to the Veta Madre system as north-northwest striking veins and local stockwork style mineralization. Several transverse, northeast striking veins with high-grade gold mineralization also occur. The 2024 MRE includes 44 vein domain models based on underground mapping and sampling, drillhole geological logging, along with the silver and gold assays. The updated El Cubo database now includes a total of 43,919 underground channel samples and 24,602 drillhole samples. Included in these totals, GSilver has collected a total of 26,806 underground channel samples totaling 16,824 m and 4,157 drillhole samples from 129 drillholes since they took over the Project in 2021. As of the Effective Date of the 2024 MRE, the Company has collected a total of 17,402 underground chip channel samples from 4,863 channels, totalling 11,076 m of channel length, that are from the Villalpando and Santa Cecilia areas of El Cubo and are within the mineral estimation domains. A total of 445 drillhole samples collected by the Company are from within the mineral estimation domains.
The 2024 MRE comprises Indicated Mineral Resources of 3.9 million troy ounces (Moz) AgEq9 at 283.9 g/t AgEq9 within 429 thousand tonnes (kt), and Inferred Mineral Resources of 35.6 Moz AgEq9 at 298.5 g/t AgEq9 within 3,711 kt. Table 1 presents the complete 2024 El Cubo MRE statement.
Notes:
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
The author is unaware of any other significant material risks to the 2024 MRE besides the risks inherent to mineral exploration and development. Potential risk factors include changes in metal prices, increases in operating costs, fluctuations in labour costs and availability, availability of investment capital, infrastructure failures, changes in government regulations, community engagement and socio-economic community relations, civil disobedience and protest, permitting and legal challenges, and general environmental concerns. The mining industry in Mexico is also prone to incursions by illegal miners, who gain access to mines or exploration areas to steal mineralized material. These incursions pose a safety, security and financial risk and can potentially compromise underground structures, equipment, and operations.
The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could potentially be upgraded to an Indicated Mineral Resource with continued exploration.
The 2024 MRE was estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions (2014) and Best Practices Guidelines (2019) prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.
The 2024 MRE was completed by Warren Black, M.Sc., P.Geo., Senior Consultant: Mineral Resources with APEX Geoscience Ltd. Mr. Black is the independent Qualified Person ('QP'). Tyler Acorn, M.Sc., Senior Geostatistician with APEX completed a peer review.
Historically mined areas were removed from the block-modelled Mineral Resources.
The 2024 MRE includes the main El Cubo resource area and the El Nayal/Cabrestantes area.
Specific gravity of 2.58 g/cm3 is used for the 2024 MRE.
Economic assumptions used include US$25/oz Ag, US$1,950 /oz Au, process recoveries of 85% for both Ag and Au, a US$15/t processing cost, and a G&A cost of US$15/t. The resulting gold equivalency ratio of Au:Ag ratio was 1:78 and is used for the purposes of the AgEq calculation.
The Underground 2024 MRE includes blocks within potential underground mining shapes. A mining cost of US$63/t, in addition to the economic assumptions above, results in an underground AgEq9 lower cutoff of 135 g/t. Mining shapes are generated using stope optimization with the objective of maximizing the total metal above the cutoff with a minimum dimension of 1.0 m (W) by 10 m (H) by 20 m (L). All 'take all' material within the mining shapes is reported, regardless of whether the estimated grades are above the optimized cutoff grade.
Mineral Resource Estimate Methodology
APEX personnel used Ordinary Kriging with locally varying anisotropy to estimate silver and gold grades in a 1.5 m (X) by 1.5 m (Y) by 1.5 m (Z) parent block model. This model is sub-blocked to 0.5 m by 0.5 m by 0.5 m for stope optimization and resource reporting. Kriging considers capped drillhole and underground channel composites.
Three types of material were identified during the calculation of the MRE: 1. In Situ, 2. Remnant, and 3. Mined Out. Blocks within, in contact with, or adjacent to underground workings were flagged as Mined Out using a 10 m by 5 m by 1 m search ellipse, aligned along the dip direction of the domain's trend at 0° dip with no third-axis rotation. Blocks within 10 m of the underground workings wireframe in any direction were classified as Remnant material, which is under evaluation but not included in the 2024 MRE. Only In Situ material, unaffected by mining, is included in the 2024 MRE.
For Indicated resources, blocks require a minimum of three drillholes within a search ellipse measuring 30 m by 30 m by 15 m. For Inferred resources, blocks need at least one drillhole or underground channel within a search ellipse of 60 m by 50 m by 15 m, based primarily on the second variogram structure. Only channel composites with centroids within the workings wireframe and all core composites are considered for Indicated classification. All channel and composites are considered for Inferred classification.
Measured resources are currently not defined. The MRE relies heavily on underground channel samples, often in areas flagged as mined out or remnant, limiting their ability to inform domain locations for in-situ material. Additional underground or surface drilling is needed away from the channel samples to assist in better defining the estimation domains.
Sampling and quality assurance/quality control
The El Cubo underground channel samples were analyzed at Corporación Química Platinum S.A de C.V. ('QPSV') in Silao, Guanajuato, until the establishment of the on-site El Cubo laboratory in December 2021. Corporación Química Platinum is independent of GSilver and is accredited by Entidad Mexicana de Acreditación, A.C. ('EMA'), which is part of the International Accreditation Forum ('IAF'). EMA also works in conjunction with the International Organization for Standardization ('ISO') Committee for Conformity Assessment ('CASCO'). The El Cubo laboratory remains under GSilver management and is not independent of the Company.
Drill core was first reviewed by a Company geologist, who identified and marked intervals for sampling. The marked sample intervals were then cut in half with a diamond saw; half of the core was left in the core box and the other half was removed, placed in plastic bags, sealed and labeled. Intervals and unique sample numbers are recorded on the drill logs and the samples are sequenced with standards and blanks inserted according to a predefined QA/QC procedure. The samples are maintained under security on site until they are shipped to the analytical lab.
The El Cubo drill core samples were submitted to QPSV, Silao, Guanajuato, Mexico, for preparation and analysis. To validate assay results and preparation procedures, GSilver systematically sent additional random samples representing approximately 20% of all analytical samples to Bureau Veritas (BV) in Hermosillo, Sonora, Mexico, and approximately 10% of all analytical samples to SGS Mexico, S.A de C.V, Durango, Mexico. BV and SGS are ISO/IEC geo-analytical laboratories and are independent of GSilver.
At QPSV and El Cubo laboratory, gold and silver determination was via standard atomic absorption (AA) finish 30-gram fire assay (FA) analysis. Overlimit results were re-run with a gravimetric finish. Multi-element analysis of 33-elements (including silver) of select samples was via multi-acid digestion followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES).
At BV and SGS, gold determination was via standard AA finish 30-gram FA analysis. Silver was analyzed via four acid digestion followed by ICP-AES or by FA with a gravimetric finish and 34-element analysis was performed by four acid digestion followed by ICP-AES.
GSilver's QA-QC protocol for underground channel and drill core sampling programs at El Cubo consisted of an insertion rate of approximately one QA-QC sample in every batch of 20 samples.
Qualified Person
The 2024 MRE was completed by Warren Black, M.Sc., P.Geo., Senior Consultant: Mineral Resources with APEX Geoscience Ltd. Mr. Black is a Qualified Person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects and he is independent of the Company. Mr. Black has reviewed and verified technical data disclosed in this news release related to the 2024 MRE.
William Gehlen, a Director of Guanajuato Silver, is a Certified Professional Geologist with the American Institute of Professional Geologists (No. 10626), and a Qualified Person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.
Mr. Gehlen has reviewed and verified technical data disclosed in this news release and detected no significant QA/QC issues during review of the data and is not aware of any sampling, recovery or other factors that could materially affect the accuracy or reliability of the drilling data referred to herein. Verified data underlying the disclosed information includes reviewing compiled assay data; QA-QC performance of blank samples, duplicates and certified reference materials; and grade calculation formulas.
About Guanajuato Silver
GSilver is a precious metals producer engaged in reactivating past producing silver and gold mines in central Mexico. The Company produces silver and gold concentrates from the El Cubo Mine, Valenciana Mines Complex, and the San Ignacio mine; all three mines are located within the state of Guanajuato, which has an established 480-year mining history. Additionally, the Company produces silver, gold, lead, and zinc concentrates from the Topia mine in northwestern Durango. With four operating mines and three processing facilities, Guanajuato Silver is one of the fastest growing silver producers in Mexico.
ON BEHALF OF THE BOARD OF DIRECTORS
'James Anderson'
Chairman and CEO
For further information regarding Guanajuato Silver Company Ltd., please contact:
JJ Jennex, Gerente de Comunicaciones, T: 604 723 1433
E: [email protected]
GSilver.com
Guanajuato Silver Bullion Store
Please visit our Bullion Store, where Guanajuato Silver coins and bars can be purchased.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements
This news release contains certain forward-looking statements and information, which relate to future events or future performance including, but not limited to, GSilver's growth, the details of planned drilling to convert Inferred resources to Indicated Resources, the interpretation of drill results, the potential for further exploration and development of GSilver's mineral properties, GSilver's status as one of the fasting growing silver mining Company in Mexico.
Such forward-looking statements and information reflect management's current beliefs and are based on information currently available to and assumptions made by the Company; which assumptions, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: the potential quantity, grade and metal content of the mineralized material at El Cubo and San Ignacio, the geotechnical and metallurgical characteristics of such material conforming to sampled results and metallurgical performance; available tonnage of mineralized material to be mined and processed; resource grades and recoveries; assumptions and discount rates being appropriately applied to production estimates; prices for silver, gold and other metals remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company's projects and to satisfy current liabilities and obligations including debt repayments; capital, decommissioning and reclamation estimates; prices for energy inputs, labour, materials, supplies and services (including transportation) and inflation rates remaining as estimated; no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.
Readers are cautioned that such forward-looking statements and information are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results, level of activity, production levels, performance or achievements of GSilver to differ materially from those expected including, but not limited to, market conditions, availability of financing, currency rate fluctuations, high inflation and interest rates, geopolitical conflicts including wars, actual results of exploration, development and production activities, actual grades and recoveries of silver, gold and other metals from the Company's existing mines including El Cubo, San Ignacio, VMC and Topia, availability of third party mineralized material for processing, unanticipated geological or structural formations and characteristics, environmental risks, future prices of gold, silver and other metals, operating risks, accidents, labor issues, equipment or personnel delays, delays in obtaining governmental or regulatory approvals and permits, inadequate insurance, and other risks in the mining industry. There are no assurances that GSilver will be able to continue to increase production, tonnage milled and recoveries rates, improve grades and reduce costs at El Cubo, San Ignacio, VMC and/or Topia to process mineralized materials to produce silver, gold and other concentrates in the amounts, grades, recoveries, costs and timetable anticipated. In addition, GSilver's decision to process mineralized material from El Cubo, San Ignacio, VMC and Topia is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and therefore is subject to increased uncertainty and risk of failure, both economically and technically. Mineral resources and mineralized material that are not Mineral Reserves do not have demonstrated economic viability, are considered too speculative geologically to have the economic considerations applied to them, and may be materially affected by environmental, permitting, legal, title, socio-political, marketing, and other relevant issues. There are no assurances that the Company's projected grades of gold and silver at El Cubo and San Ignacio and the anticipated level of production therefrom will be realized. In addition, there are no assurances that the Company will meet its production forecasts or generate the anticipated cash flows from operations to satisfy its scheduled debt payments or other liabilities when due or meet financial covenants to which the Company is subject or to fund its exploration programs and corporate initiatives as planned. There is also uncertainty about impact of any resurgence of COVID-19, the ongoing war in Ukraine and conflict in Gaza, elevated inflation and interest rates and the impact they will have on the Company's operations, supply chains, ability to access mining projects or procure equipment, contractors and other personnel on a timely basis or at all and economic activity in general. Accordingly, readers should not place undue reliance on forward-looking statements or information. All forward-looking statements and information made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR+ at www.sedarplus.ca including the Company's most recently filed annual information form. These forward-looking statements and information are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by law.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Upturn
3 hours ago
- Business Upturn
Atico Mining Announces Execution of Term Sheet with Trafigura to Restructure Outstanding Credit Facility
By GlobeNewswire Published on June 14, 2025, 02:52 IST VANCOUVER, British Columbia, June 13, 2025 (GLOBE NEWSWIRE) — Atico Mining Corporation (the 'Company' or 'Atico') (TSX.V: ATY | OTC: ATCMF) announces that, further to its press release dated June 9, 2025, it has entered into a term sheet with Trafigura PTE. LTD. (the 'Trafigura') regarding an amendment and extension of the Company's existing secured credit agreement (the 'Credit Agreement') with Trafigura and certain subsidiaries of the Company, of which US$8.7 million remains outstanding (the 'Principal Amount'). Pursuant to the term sheet, the Principal Amount will be repaid in two instalments of US$2.7 million on July 25, 2025 and US$6 million on December 30, 2026. The outstanding Principal Amount will bear interest at a rate of SOFR plus 7.5%. In addition, the parties have agreed to an extension of the existing commercial concentrate purchase contract between the Company and Trafigura covering the purchase of 100% of the concentrate produced from the El Roble mine for two additional years, subject to a minimum tonnage of 32kdm per year. Closing of the transactions is subject to finalization of definitive documentation, which will contain customary representations, warranties, covenants and conditions precedent to closing, including approval of the TSX Venture Exchange, and is expected to occur on or before June 30, 2025. About Atico Mining Corporation Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit ON BEHALF OF THE BOARD Fernando E. GanozaCEO Atico Mining Corporation Trading symbols: TSX.V: ATY | OTCQX: ATCMF Investor RelationsIgor Dutina Tel: +1.604.729.5765 Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. Cautionary Note Regarding Forward Looking Statements This news release contains certain forward-looking information and forward-looking statements, as defined in applicable securities laws (collectively referred to herein as 'forward-looking statements'). These statements relate to future events or the Company's future performance. All statements other than statements of historical fact are forward-looking statements. Often, but not always, forward-looking statements can be identified by the use of words such as 'plans', 'expects', 'anticipates', 'believes', 'estimates', 'expects', 'confirm' and similar expressions, or the negatives of such words and phrases, or state that certain actions, events or results 'may', 'could', 'would', 'should', 'might', or 'will' be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in such forward-looking statements. The forward-looking statements in this news release speak only as of the date hereof or as of the date specified in such statement. Specifically, this news release includes, but is not limited to, forward-looking statements regarding: the expected terms contained in the definitive documentation and the expected closing of the loan refinancing with Trafigura including the timing thereof. Inherent in forward-looking statements are risks, uncertainties and other factors beyond Atico's ability to predict or control. These risks, uncertainties and other factors include, but are not limited to, risks associated with the Company's outstanding debt, including amounts due and payable to each of Trafigura and Dundee Corporation ('Dundee') on or before June 30, 2025 and December 30, 2025, respectively, or the ability to successfully amend and extend the Credit Agreement and the convertible debenture with Dundee; the availability and cost of funds; uncertainties relating to the closing of the Trafigura loan refinancing, including delays in obtaining or failure to obtain required approvals to complete the Trafigura loan refinancing; mining operations; market fluctuations in commodity prices; title risks and surface rights and access; changes in legislation; political instability; government or regulatory approvals; non-compliance with laws and regulations and compliance costs; environmental compliance; climate change; uninsured and uninsurable risks; water disposal, tailings and reclamation obligations; financing risks; risks associated with outstanding debt; global economic conditions; availability and costs of supplies; community relations; mineral reserve and mineral resource estimates; future production rates; labour relations; currency fluctuations; the Company may engage in hedging activities; infrastructure; exploration and development capital expenditures; social media and reputation; negative publicity; human rights; business objectives; concentrate sales risks; shortage of personnel; health and safety; pandemics, epidemics or infectious disease outbreak; physical security; conflicts of interest; claims and legal proceedings; information systems and cyber security; internal controls; violation of anti-bribery or corruption laws; competition; tax considerations; compliance with listing standards; enforcement of civil liabilities; financing requirement risks; market price volatility of Common Shares; and other risks and uncertainties related to the Company's business and the Offerings, including those described in the Company's public disclosure documents on SEDAR+ at Readers are cautioned that the foregoing list of factors is not exhaustive of the factors that may affect the forward-looking statements. Actual results and developments are likely to differ and may differ materially from those expressed or implied by the forward-looking statements contained in this news release. Such statements are based on a number of assumptions which may prove to be incorrect, including but not limited to, (1) the successful completion of the Trafigura loan refinancing; (2) the Company's ability to generate positive cash flows from ongoing operations at the El Roble Mine, including the ability to sell its mineral concentrates in inventory; (3) that all required third party contractual, regulatory and governmental approvals will be obtained for the development, construction and production of the Company's properties, (4) there being no significant disruptions affecting operations, whether due to labor disruptions, supply disruptions, power disruptions, damage to equipment, non-renewal of title to the Company's claims or otherwise, (5) permitting, development, expansion and power supply proceeding on a basis consistent with the Company's current expectations, (6) currency exchange rates being approximately consistent with current levels, (7) certain price assumptions for copper, gold, zinc and silver, (8) prices for and availability of fuel oil, electricity, parts and equipment and other key supplies remaining consistent with current levels, (9) production forecasts meeting expectations, (10) the accuracy of the Company's current mineral resource and reserve estimates, (11) labor and materials costs increasing on a basis consistent with the Company's current expectations, (12) matters related to the ongoing dispute with the National Mining Agency in Colombia, and (13) general marketing, political, business and economic conditions. Forward-looking statements may be affected by known and unknown risks, uncertainties and other factors including without limitation, those referred to in the Offering Documents that may cause Atico's actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. All forward-looking statements herein are qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update publicly or otherwise any forward-looking statements, whether as a result of new information or future events or otherwise, except as may be required by law. If Atico does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements, unless required by law. Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. Ahmedabad Plane Crash GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.
Yahoo
4 hours ago
- Yahoo
West Coast Community Bancorp Announces Annual Shareholder Voting Results
SANTA CRUZ, Calif., June 13, 2025 /PRNewswire/ -- West Coast Community Bancorp ("Bancorp", OTCQX: WCCB), the parent company of West Coast Community Bank ("Bank"), formerly known as Santa Cruz County Bank, headquartered in Santa Cruz, Calif., today announced the results of its annual election of directors. A total of 7,866,036 shares were represented and voted at the meeting, constituting 74.41% of the 10,571,208 issued and outstanding shares entitled to vote at the meeting. There was no solicitation in opposition to management's nominees for director as listed in the proxy statement for the annual meeting, and all such nominees were elected pursuant to the vote of the shareholders. The vote on the election of the 10 nominees for director was as follows: Director For Percent of VotesCast "For" Withheld Percent ofVotes Withheld John C. Burroughs 5,152,106 86.34 815,135 13.66 Caroline D. Chapin 5,609,308 94.00 357,933 6.00 Kenneth R. Chappell 5,560,303 93.30 399,274 6.70 Wayne S. Doiguchi 5,581,943 93.54 385,298 6.46 Craig A. French 5,222,438 87.52 744,803 12.48 Kurt J. Gollnick 5,534,337 92.86 425,240 7.14 Daniel R. Hightower, M.D. 5,614,964 94.10 352,277 5.90 Stephen D. Pahl 5,630,407 94.36 336,834 5.64 Krista Snelling 5,732,543 96.19 227,034 3.81 James L. Weisenstein 5,574,674 93.42 392,567 6.58 The number voting "For" each director listed to this item of business constituted at least 86.34% of the total number of shares represented. The appointment of Crowe LLP as the Bank's independent registered public accounting firm for 2025 was ratified, with the number of shares voted as follows: For: 7,854,429Against: 39Abstain: 11,568 The number voting "For" constituted 99.85% of the total number of shares represented and voting at the meeting with respect to this item of business. ABOUT WEST COAST COMMUNITY BANCORP AND WEST COAST COMMUNITY BANKFounded in 2004, West Coast Community Bank (formerly Santa Cruz County Bank and its division, 1st Capital Bank) is the wholly owned subsidiary of West Coast Community Bancorp, a bank holding company. The Bank is a top-rated, locally operated and full-service community bank headquartered in Santa Cruz, Calif. with branches in Aptos, Capitola, Cupertino, King City, Monterey, Salinas, San Luis Obispo, Santa Cruz, Scotts Valley and Watsonville. West Coast Community Bank is distinguished from "big banks" by its relationship-based service, problem-solving focus and direct access to decision makers. The Bank is a leading SBA lender in Santa Cruz County and Silicon Valley. As a full-service bank, West Coast Community Bank offers competitive deposit and lending solutions for businesses and individuals; including business loans, lines of credit, commercial real estate financing, construction lending, asset-based lending, agricultural loans, SBA and USDA government guaranteed loans, credit cards, merchant services, remote deposit capture, mobile and online banking, bill payment and treasury management. True to its community roots, West Coast Community Bank has supported regional well-being by actively participating in and donating to local nonprofit organizations. Visit for more information. Forward-Looking StatementsThis release may contain forward-looking statements that are subject to risks and uncertainties. Such risks and uncertainties may include but are not necessarily limited to achieving the intended synergies with 1st Capital Bancorp post-merger, retaining employees and clients, fluctuations in interest rates (including but not limited to changes in depositor behavior and/or impacts on our core deposit intangible in relation thereto), inflation, government regulations and general economic conditions and competition within the business areas in which the Bank is conducting its operations, health of the real estate market in California, Bancorp's ability to effectively execute its business plans and other factors beyond Bancorp and the Bank's control. Such risks and uncertainties could cause results for subsequent interim periods or for the entire year to differ materially from those indicated. Readers should not place undue reliance on the forward-looking statements, which reflect management's view only as of the date hereof. Bancorp undertakes no obligation to publicly revise these forward-looking statements to reflect subsequent events or circumstances. View original content to download multimedia: SOURCE West Coast Community Bancorp Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

Yahoo
6 hours ago
- Yahoo
Diamcor Receives Section 244 Notice from Tiffany & Co.
KELOWNA, BC / / June 13, 2025 / Diamcor Mining Inc. (TSXV:DMI)(OTC PINK:DMIFF)(FRA:DC3A), ("Diamcor" or the "Company"), a well-established Canadian diamond mining company with a proven history in the mining, exploration, and sale of rough diamonds, announces that is has received a section 244(1) notice (the "s. 244 Notice") under the Bankruptcy and Insolvency Act (Canada) from Tiffany & Co. Canada ("Tiffany"), together with notice that an Event of Default has occurred under the Company's current loan and security agreements with Tiffany. The s. 244 Notice provides notice to the Company that Tiffany intends to enforce its security against all of the Company's present and after acquired personal property and all shares held by the Company in the capital of DMI Diamonds South Africa (Pty) Ltd. The s. 244 Notice provides that Tiffany must give 10 days' notice of its intention to enforce a security interest prior to taking any enforcement steps. The Company and Tiffany are currently exploring alternatives to the enforcement of the security. About Diamcor Mining Inc. Diamcor Mining Inc. is a fully reporting publicly traded Canadian diamond mining company with a well-established proven history in the mining, exploration, and sale of rough diamonds. The Company's primary focus is on the mining and development of its Krone-Endora at Venetia Project which is co-located and directly adjacent to De Beers' Venetia Diamond Mine in South Africa. The Venetia diamond mine is recognized as one of the world's top diamond-producing mines, and the deposits which occur on Krone-Endora have been identified as being the result of shift and subsequent erosion of an estimated 50M tonnes of material from the higher grounds of Venetia to the lower surrounding areas in the direction of Krone and Endora. Diamcor also focuses on the acquisition and development of mid-tier projects with near-term production capabilities and growth potential and uses unique approaches to mining that involves the use of advanced technology and techniques to extract diamonds in a safe, efficient, and environmentally responsible manner. The Company has a strong commitment to social responsibility, including the support of local people, communities, and the environment. About the Krone-Endora at Venetia Project Diamcor acquired the Krone-Endora at Venetia Project from De Beers Consolidated Mines Limited, consisting of the prospecting rights over the farms Krone 104 and Endora 66, which represent a combined surface area of approximately 5,888 hectares directly adjacent to De Beers' flagship Venetia Diamond Mine in South Africa. The Company subsequently announced that the South African Department of Mineral Resources had granted a Mining Right for the Krone-Endora at Venetia Project encompassing 657.71 hectares of the Project's total area of 5,888 hectares. The Company has also submitted an application for a mining right over the remaining areas of the Project. The deposits which occur on the properties of Krone and Endora have been identified as a higher-grade "Alluvial" basal deposit which is covered by a lower-grade upper "Eluvial" deposit. These deposits are proposed to be the result of the direct-shift (in respect to the "Eluvial" deposit) and erosion (in respect to the "Alluvial" deposit) of an estimated 1,000 vertical meters of material from the higher grounds of the adjacent Venetia Kimberlite areas. The deposits on Krone-Endora occur with a maximum total depth of approximately 15.0 metres from surface to bedrock, allowing for a very low-cost mining operation to be employed with the potential for near-term diamond production from a known high-quality source. Krone-Endora also benefits from the significant development of infrastructure and services already in place due to its location directly adjacent to the Venetia Mine, which is widely recognised as the largest diamond mine in South Africa, and one of the most prolific diamond mines in the world. On behalf of the Board of Directors: Mr. Dean H. TaylorPresident & CEODiamcor Mining For further information contact: Mr. Dean H. TaylorDiamcor Mining IncDeanT@ 250 862-3212 This press release contains certain forward-looking statements. While these forward-looking statements represent our best current judgement, they are subject to a variety of risks and uncertainties that are beyond the Company's ability to control or predict and which could cause actual events or results to differ materially from those anticipated in such forward-looking statements. Further, the Company expressly disclaims any obligation to update any forward looking statements. Accordingly, readers should not place undue reliance on forward-looking statements. WE SEEK SAFE HARBOUR Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. SOURCE: Diamcor Mining Inc. View the original press release on ACCESS Newswire Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data