GALIANO GOLD REPORTS SECOND QUARTER 2025 RESULTS

GALIANO GOLD REPORTS SECOND QUARTER 2025 RESULTS

Cision Canada6 days ago
VANCOUVER, BC, Aug. 13, 2025 /CNW/ - Galiano Gold Inc. ("Galiano" or the "Company") (TSX: GAU) (NYSE American: GAU) is pleased to report its second quarter ("Q2") 2025 operating and financial results. Galiano owns a 90% interest in the Asanko Gold Mine ("AGM") located on the Asankrangwa Gold Belt in the Republic of Ghana, West Africa.
All financial information contained in this news release is unaudited and reported in United States dollars.
Q2 2025 AND YEAR-TO-DATE HIGHLIGHTS
Safety
No lost-time injuries ("LTI") nor total recordable injuries (inclusive of LTIs) ("TRI") recorded during Q2 2025.
12‐month rolling LTI and TRI frequency rates as of June 30, 2025 of 0.42 and 0.97 per million hours worked, respectively.
Mining
Mining activities focused on the Abore and Esaase deposits with 1.4 million tonnes ("Mt") of ore mined at an average mined grade of 0.8 grams per tonne ("g/t") gold and a strip ratio of 5.9:1 during Q2 2025.
Development of Cut 3 at the Nkran deposit continued to ramp up with 1.7 Mt of waste mined during the quarter, a 113% increase compared to Q1 2025.
Processing
1.2 Mt of ore was milled at an average feed grade of 0.8 g/t gold, with metallurgical recovery averaging 89% during Q2 2025.
Secondary crushing circuit was completed on budget and commissioned at the end of July 2025. Processing plant milling capacity is now expected to return to a 5.8 Mt per annum throughput rate.
Produced 30,350 ounces of gold during the quarter, a 46% increase compared to Q1 2025. 51,084 ounces of gold produced year-to-date.
Sold 29,287 ounces of gold during the quarter and 56,281 ounces of gold year-to-date at average realized prices of a quarterly record $3,317 per ounce ("/oz") and $3,084/oz, respectively, excluding the effect of realized losses on gold hedging instruments.
Cost and capital expenditures
Total cash costs 1 of $1,602/oz and all-in sustaining costs 1 ("AISC") of $2,251/oz for the quarter (year-to-date AISC 1 of $2,339/oz). AISC 1 declined by 10% compared to Q1 2025.
Sustaining capital expenditures, excluding capitalized stripping costs, of $2.2 million and development capital expenditures (excluding Nkran pre-stripping costs) of $4.9 million during Q2 2025.
Capitalized development pre-stripping costs at Nkran Cut 3 of $6.9 million during Q2 2025, and $10.1 million year-to-date.
Financial
Cash and cash equivalents of $114.7 million at June 30, 2025, and no debt.
Generated cash flow from operating activities of $35.8 million during Q2 2025.
Income from mine operations of $37.2 million during Q2 2025.
Net income of $0.07 per common share and adjusted net income 1 of $0.08 per common share during Q2 2025.
Adjusted EBITDA 1 (as defined herein) of $39.9 million during Q2 2025.
Exploration
A deep step-out drilling program at the Abore deposit, totaling 1,907m across a 1,200m strike length, yielded positive results with mineralization intercepted in all four holes, including 36m at 2.5 g/t gold (refer to news release dated July 14, 2025).
"We are pleased with the progress made during the period with production, all-in sustaining costs, earnings per share, and cash balances all improving quarter-on-quarter. This momentum, in combination with the commissioning of the secondary crusher ahead of schedule in late July, positions us well for a strong second half of the year," said Matt Badylak, Galiano's President and Chief Executive Officer. "The results from our Abore deep drilling program confirm the presence of a mineralized system 200 metres below the current Mineral Reserve over a significant 1,200 metre strike length. These findings highlight the expansion potential at Abore and provide additional exploration targets to unlock further value beneath our existing reserves."
SUMMARY OF QUARTERLY OPERATIONAL AND FINANCIAL HIGHLIGHTS
Q2 2025
Q1 2025
Q4 2024
Q3 2024
Q2 2024
Health and safety
LTIs
-
2
1
-
-
12-month rolling LTI frequency rate
0.42
0.43
0.15
0.00
0.15
Mining
Ore mined ('000t)
1,365
1,296
531
670
467
Waste mined ('000t)
9,824
9,124
8,698
9,726
7,427
Strip ratio (W:O)
7.2
7.0
16.4
14.5
15.9
Average gold grade mined (g/t)
0.8
0.8
1.0
1.1
1.0
Mining cost ($/t mined) – total (1)
3.65
3.36
3.41
3.52
2.98
Mining cost ($/t mined) – producing (1)
3.59
3.31
3.41
3.52
2.98
Mining cost ($/t mined) – development (1)
4.00
3.98
-
-
-
Ore tonnes trucked ('000 t)
1,030
1,053
685
665
503
Ore transportation cost ($/t trucked)
4.49
4.43
4.75
4.56
5.71
Processing
Ore milled ('000t)
1,193
1,086
1,179
1,162
1,336
Average mill head grade (g/t)
0.8
0.8
0.9
0.9
0.7
Average recovery rate (%)
89
87
85
91
82
Processing cost ($/t milled)
12.89
14.37
15.84
12.49
11.18
General and administrative cost ($/t milled)
6.24
5.78
6.28
5.74
5.13
Gold produced (oz)
30,350
20,734
28,508
29,784
26,437
Capital expenditures
Sustaining capital ($m)
2.2
1.3
0.8
0.8
0.6
Development capital ($m)
4.9
3.3
2.0
4.0
2.3
Development pre-stripping capital ($m)
6.9
3.2
-
-
-
Financial, costs and cash flow
Revenue ($m)
97.3
76.6
64.6
71.1
64.0
Gold sold (oz)
29,287
26,994
24,673
29,014
27,830
Average realized gold price ($/oz)
3,317
2,833
2,609
2,446
2,292
AISC ($/oz sold) (2)
2,251
2,501
2,638
2,161
1,759
Income from mine operations ($m)
37.2
15.4
21.8
26.4
23.6
Cash flow from operating activities ($m)
35.8
25.9
13.8
24.4
4.5
Free cash flow ($m) (2)
5.6
0.7
(3.1)
(1.6)
(9.7)
Adjusted net income ($m) (2)
21.1
3.4
5.1
17.7
7.3
Adjusted EBITDA ($m) (2)
39.9
19.0
21.2
25.6
16.2
(1) Total mining cost per tonne includes total mining costs for all producing deposits (i.e. Abore and Esaase) and deposits in development (i.e Nkran). Producing mining cost per tonne reflects unit mining rates at the Abore and Esaase deposits combined, while development mining cost per tonne reflects unit mining rates at the Nkran deposit only.
(2) Refer to section "Non-IFRS Performance Measures" of this news release.
Mining
Development of the Abore pit continued during Q2 2025 with mined ore totaling 0.8 Mt, an increase of 18% from Q1 2025, at an average grade of 0.9 g/t gold. The strip ratio at Abore was 6.2:1, a decrease of 17% from Q1 2025.
Continued mining operations at the Esaase deposit with mined ore totaling 0.5 Mt at an average grade of 0.7 g/t gold and a strip ratio of 5.5:1.
Mining cost per tonne at Abore and Esaase averaged $3.59 per tonne ("/t") in Q2 2025 compared to $2.98/t in Q2 2024 at Abore only. The increase in mining unit rates was due to higher load and haul costs associated with mining deeper benches, as well as higher drill and blast costs resulting from mining a higher proportion of fresh granite ore at Abore.
Continued with waste stripping of Cut 3 at the Nkran deposit with 1.7 Mt of waste rock mined during Q2 2025, an increase of 113% from Q1 2025. Mined volumes at Nkran are expected to gradually increase as the mining contractor continues to mobilize most of its mining fleet over the remainder of this year.
At Nkran, mining cost per tonne was $4.00 for Q2 2025, which included an allocation of general overhead costs. Nkran waste stripping costs were capitalized as development capital expenditures during the quarter.
Processing
The AGM produced 30,350 ounces of gold during Q2 2025, an increase of 46% from Q1 2025, as the processing plant milled 1.2 Mt of ore at an average grade of 0.8 g/t gold with metallurgical recovery averaging 89%. The increase in gold production was driven by higher plant availability, following the 14-day maintenance shutdown in Q1 2025, resulting in 10% more tonnes milled in Q2 2025. Gold production in Q2 2025 was also positively impacted by the high gold-in-process inventory balance that existed at the end of Q1 2025.
Gold production during Q2 2025 continued to be impacted by lower milling rates, as harder mined ore from Abore required additional crushing and grinding, compared to softer ore from Esaase that was the primary mill feed source in Q2 2024. The AGM remains on track to meet the lower end of the production guidance range of 130,000 to 150,000 ounces of gold in 2025.
The construction of a permanent secondary crushing circuit at the AGM processing plant was completed at the end of July 2025. As of the date of this news release, the secondary crushing circuit is ramping up to full capability. The objective of the secondary crushing circuit is to maintain plant throughput at the design capacity of 5.8 Mt per annum when treating harder ore.
Processing cost per tonne for Q2 2025 was $12.89, a 10% decrease from Q1 2025. On an absolute basis, processing costs were consistent quarter-on-quarter. The decrease in processing cost per tonne in Q2 2025 was driven by 10% more tonnes milled, which decreased fixed processing costs on a per unit basis.
Capital Expenditures
Sustaining capital expenditures during Q2 2025 totaled $2.2 million and related primarily to a tailings facility expansion.
Development capital expenditures, excluding Nkran pre-stripping costs, during Q2 2025 totaled $4.9 million and related primarily to construction of the now completed secondary crushing circuit.
$6.9 million in development pre-stripping costs were incurred at the Nkran deposit related to Cut 3 waste removal and initial site establishment costs.
Costs
AISC 1 for Q2 2025 was $2,251/oz, compared to $1,759/oz in the comparative period. The increase in AlSC 1 was primarily driven by higher capitalized stripping costs at the Abore and Esaase deposits and higher royalties expense relative to Q2 2024. Also, during Q2 2024, low grade stockpiled ore was processed that had no accounting book value and, as such, had no mining cost attributed to it, which resulted in lower operating costs in the comparative quarter.
Relative to Q1 2025, AISC 1 decreased by 10% in Q2 2025 due to 8% higher gold sales volumes.
The Company expects AISC 1 for FY 2025 at the higher end of its guidance range due to production expectations at the lower end of the guidance range. In addition, there have been several factors outside of the Company's control that impact the Company's reported AISC 1. Higher royalties resulting from higher realized gold prices and the increase to the Growth and Sustainability Levy ("GSL") from 1% to 3% effective April 1, 2025, are estimated to impact FY 2025 AISC 1 by approximately a further $100/oz (at the current spot gold price). Furthermore, the rapid appreciation of the Ghanaian Cedi against the US dollar during Q2 2025 adds further upward pressure on AISC 1, if sustained over the remainder of 2025.
Exploration
Infill drilling completed at the Abore deposit led to discovery of a new high-grade zone immediately below the mineral reserve pit shell at the south end of the Abore Main pit, including 50 meters ("m") at 3.2 g/t gold (refer to news release dated May 5, 2025). The infill drilling also increased confidence in the mineral reserve and mineral resource in the area in and around the known high-grade zone at the Abore South pit, while also increasing the strike length of this zone from 90m to 180m.
Positive results from a deep step-out drilling program at the Abore deposit, totaling 1,907m across a 1,200m strike length, with mineralization intercepted in all four holes, including 36m at 2.5 g/t gold (refer to news release dated July 14, 2025). The program confirmed the Abore granite and mineralizing system continues 200m below the current Mineral Reserve pit shell over a strike length of at least 1,200m, remains open in all directions and appears to carry sufficient grades and widths below the current Mineral Reserve pit shell to support the potential development of bulk underground mining.
CONSOLIDATED FINANCIAL HIGHLIGHTS FOR THE THREE MONTHS ENDED JUNE 30, 2025 AND 2024
The Company sold 29,287 ounces of gold in Q2 2025 at a quarterly record average realized gold price of $3,317/oz for total revenue of $97.3 million. The increase in revenue from the comparative period was due to a 45% increase in realized prices and a 5% increase in gold ounces sold.
Income from mine operations for Q2 2025 totaled $37.2 million, compared to $23.6 million in Q2 2024. The increase in income from mine operations was due to higher revenues as described above. This was partly offset by higher depreciation expense on mining leases and higher depletion expense on Abore and Essase deferred stripping costs during Q2 2025. Royalties expense was also higher in Q2 2025 due to higher earned revenues and the increase to the GSL from 1% to 3% effective April 1, 2025.
The Company reported net income attributable to common shareholders of $19.3 million in Q2 2025, compared to $7.3 million in Q2 2024. The increase in net income during Q2 2025 was primarily due to the increase in income from mine operations as described above, and partly offset by an increase in finance expense related to realized and unrealized losses on the Company's gold hedging derivatives.
Reported Adjusted EBITDA 1 of $39.9 million in Q2 2025, compared to $16.2 million in Q2 2024. The increase in Adjusted EBITDA 1 was primarily driven by higher revenues, partly offset by higher royalties as described above.
The Company generated $35.8 million of cash flow from operating activities in Q2 2025, compared to $4.5 million in Q2 2024. The increase in operating cash flow was primarily driven by higher realized gold prices during Q2 2025.
As of June 30, 2025, the Company had cash and cash equivalents of $114.7 million and no debt.
CONSOLIDATED FINANCIAL HIGHLIGHTS FOR THE SIX MONTHS ENDED JUNE 30, 2025 AND 2024
The Company sold 56,281 ounces of gold during the six months ended June 30, 2025 at an average realized gold price of $3,084/oz for total revenue of $173.9 million. The increase in revenue from the comparative period was due to a 38% increase in realized prices and 32% increase in gold ounces sold.
Income from mine operations for the six months ended June 30, 2025 totaled $52.5 million, compared to $29.8 million in the comparative period of 2024. The increase in income from mine operations was due to the increase in revenue as described above and the Company only consolidating the financial results of the AGM from March 4, 2024 to June 30, 2024 in the comparative period. These factors were partly offset by higher depreciation and depletion expense and royalties in 2025.
The Company reported a net loss attributable to common shareholders of $7.5 million for the six months ended June 30, 2025, compared to net income of $4.1 million in the comparative period of 2024. The decrease in net income was primarily driven by higher realized and unrealized losses on gold hedging instruments in 2025. This was partly offset by the Company consolidating a full six months of financial results of the AGM in 2025.
Reported Adjusted EBITDA 1 of $58.9 million during the six months ended June 30, 2025, compared to $21.1 million in the comparative period of 2024. The increase in Adjusted EBITDA 1 was driven by higher realized gold prices and the Company consolidating a full six months of financial results of the AGM in 2025.
The Company generated $61.7 million of cash flow from operating activities during the six months ended June 30, 2025, compared to $17.5 million in the comparative period of 2024. The increase in cash flow from operations was driven by higher realized gold prices and the Company consolidating a full six months of financial results of the AGM in 2025.
This news release should be read in conjunction with Galiano's Management's Discussion and Analysis and the Unaudited Condensed Consolidated Interim Financial Statements for the three and six months ended June 30, 2025 and 2024, which are available at www.galianogold.com and filed on SEDAR+.
1 Non-IFRS Performance Measures
The Company has included certain non-IFRS performance measures in this news release. These non-IFRS performance measures do not have any standardized meaning and therefore may not be comparable to similar measures presented by other issuers. Accordingly, these performance measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Refer to the Non-IFRS Measures section of Galiano's Management's Discussion and Analysis for an explanation of these measures and reconciliations to the Company's reported financial results in accordance with IFRS.
Total Cash Costs per Gold Ounce Sold
Management of the Company uses total cash costs per gold ounce sold to monitor the operating performance of the AGM. Total cash costs include the cost of production, adjusted for by-product revenue and production royalties per ounce of gold sold.
AISC per Gold Ounce Sold
The Company has adopted the reporting of "AISC per gold ounce sold". AISC include total cash costs, AGM general and administrative expenses, sustaining capital expenditure, sustaining capitalized stripping costs, reclamation cost accretion and lease payments made on the AGM's mining and other service lease agreements per ounce of gold sold.
EBITDA and Adjusted EBITDA
Earnings before interest, taxes, depreciation and amortization ("EBITDA") provides an indication of the Company's continuing capacity to generate income from operations before taking into account the Company's financing decisions and costs of amortizing capital assets. Accordingly, EBITDA comprises net income (loss) excluding finance expense, finance income, depreciation and depletion expense, and income taxes. Adjusted EBITDA adjusts EBITDA to exclude non-recurring items and non-cash items ("Adjusted EBITDA") and includes the calculated Adjusted EBITDA of the AGM joint venture for periods prior to the consolidation of its ownership.
Free cash flow
The Company believes that in addition to conventional measures prepared in accordance with IFRS, management and certain investors and analysts use free cash flow to evaluate the Company's performance with respect to its operating cash flow capacity to meet non-discretionary outflows of cash. The presentation of free cash flow is not meant to be a substitute for the cash flow information presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. Free cash flow is calculated as cash flow from operating activities, excluding one-time charges not indicative of current period cash flow performance, less cash flows used in investing activities and payments made to mining and service contractors for leases capitalized under IFRS 16.
Adjusted net income (loss) and adjusted net income (loss) per common share
The Company has included the non-IFRS performance measures of adjusted net income (loss) and adjusted net income (loss) per common share. Neither adjusted net income (loss) nor adjusted net income (loss) per share have any standardized meaning and are therefore unlikely to be comparable to other measures presented by other issuers. Adjusted net income (loss) excludes certain non-cash items or non-recurring items from net income (loss) to provide a measure which helps the Company and investors to evaluate the results of the underlying core operations of the Company and its ability to generate cash flows and is an important indicator of the strength of the Company's operations and performance of its core business.
Qualified Person
The exploration information contained in this news release has been reviewed and approved by Mr. Chris Pettman, P.Geo, Vice President Exploration of Galiano. All other scientific and technical information contained in this news release has been reviewed and approved by Mr. Amri Sinuhaji, P.Eng., Vice President Technical Services of Galiano. Mr. Pettman and Mr. Sinuhaji are "Qualified Persons" as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.
Conference Call
The Company will host a conference call and webcast to review the Q2 results on Thursday, Aug 14, 2025, at 7:30am PT.
The conference call will be webcast https://app.webinar.net/DayQ6KvNKLJ and can be accessed on Galiano's website.
About Galiano Gold Inc.
Galiano is focused on creating a sustainable business capable of value creation for all stakeholders through production, exploration and disciplined deployment of its financial resources. The Company owns the Asanko Gold Mine, which is located in Ghana, West Africa. Galiano is committed to the highest standards for environmental management, social responsibility, and the health and safety of its employees and neighbouring communities. For more information, please visit www.galianogold.com.
Cautionary Note Regarding Forward-Looking Statements
Certain statements and information contained in this news release constitute "forward-looking statements" within the meaning of applicable U.S. securities laws and "forward-looking information" within the meaning of applicable Canadian securities laws, which we refer to collectively as "forward-looking statements". Forward-looking statements are statements and information regarding possible events, conditions or results of operations that are based upon assumptions about future conditions and courses of action. All statements and information other than statements of historical fact may be forward-looking statements. In some cases, forward-looking statements can be identified by the use of words such as "seek", "expect", "anticipate", "budget", "plan", "estimate", "continue", "forecast", "intend", "believe", "predict", "potential", "target", "may", "could", "would", "might", "will" and similar words or phrases (including negative variations) suggesting future outcomes or statements regarding an outlook.
Forward-looking statements in this news release include, but are not limited to: statements regarding the Company's operating plans for the AGM and timing thereof; expectations and timing with respect to current and planned drilling programs, including at Abore, and the results thereof; anticipated production and cost guidance; expectations regarding processing plant milling capacity; expectations regarding cash flows from operations; any additional work programs to be undertaken by the Company; potential exploration opportunities and statements regarding the usefulness and comparability of certain non-IFRS measures; a nd total cash costs and corresponding cost performance relating to the Company's activities. Such forward-looking statements are based on a number of material factors and assumptions, including, but not limited to: development plans and capital expenditures; the price of gold will not decline significantly or for a protracted period of time; the accuracy of the estimates and assumptions underlying mineral reserve and mineral resource estimates; the Company's ability to raise sufficient funds from future equity financings to support its operations, and general business and economic conditions; the global financial markets and general economic conditions will be stable and prosperous in the future; the AGM will not experience any significant uninsured production disruptions that would materially affect revenues; the ability of the Company to comply with applicable governmental regulations and standards; the mining laws, tax laws and other laws in Ghana applicable to the AGM will not change, and there will be no imposition of additional exchange controls in Ghana; the success of the Company in implementing its development strategies and achieving its business objectives; the Company will have sufficient working capital necessary to sustain its operations on an ongoing basis and the Company will continue to have sufficient working capital to fund its operations; and the key personnel of the Company will continue their employment.
The foregoing list of assumptions cannot be considered exhaustive.
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to differ materially from those anticipated in such forward-looking statements. The Company believes the expectations reflected in such forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and you are cautioned not to place undue reliance on forward-looking statements contained herein. Some of the risks and other factors which could cause actual results to differ materially from those expressed in the forward-looking statements contained in this news release, include, but are not limited to: the mineral reserve and mineral resource estimates may change and may prove to be inaccurate; life of mine estimates are based on a number of factors and assumptions and may prove to be incorrect; actual production, costs, returns and other economic and financial performance may vary from the Company's estimates in response to a variety of factors, many of which are not within the Company's control; inflationary pressures and the effects thereof; sustained increases in costs, or decreases in the availability, of commodities consumed or otherwise used by the Company may adversely affect the Company; adverse geotechnical and geological conditions (including geotechnical failures) may result in operating delays and lower throughput or recovery, closures or damage to mine infrastructure; the ability of the Company to treat the number of tonnes planned, recover valuable materials, remove deleterious materials and process gold as planned is dependent on a number of factors and assumptions which may not be present or occur as expected; risks related to artisanal and illegal mining activities at or near the AGM, including that the Company's mineral properties may experience a loss of ore, and the Company may experience lack of access to its mineral properties and other issues, due to illegal mining activities; the Company's operations may encounter delays in or losses of production due to equipment delays or the availability of equipment; the ability of the Company to manage procurement risks, including securing timely and cost-effective equipment and services, and mitigate risks related to supplier performance, fraud, collusion, bribery, kickbacks and unethical procurement practices; outbreaks of infectious diseases may have a negative impact on global financial conditions, demand for commodities and supply chains and could adversely affect the Company's business, financial condition and results of operations and the market price of the common shares of the Company; the Company's operations are subject to continuously evolving legislation, compliance with which may be difficult, uneconomic or require significant expenditures; the Company may be unsuccessful in attracting and retaining key personnel; labour disruptions could adversely affect the Company's operations; metallurgical recoveries may not be economically viable or recoveries may be lower in the future and have a negative impact on the Company's gold production and financial results; the Company's business is subject to risks associated with operating in a foreign country; risks related to the Company's use of contractors; the hazards and risks normally encountered in the exploration, development and production of gold; the Company's operations are subject to environmental hazards and compliance with applicable environmental laws and regulations; the effects of climate change or extreme weather events may cause prolonged disruption to the delivery of essential commodities which could negatively affect production efficiency; the Company's operations and workforce are exposed to health and safety risks; unexpected costs and delays related to, or the failure of the Company to obtain, necessary permits could impede the Company's operations; the Company's title to exploration, development and mining interests can be uncertain and may be contested; geotechnical risks associated with the design and operation of a mine and related civil structures; the Company's properties may be subject to claims by various community stakeholders; risks related to limited access to infrastructure and water; risks associated with establishing new mining operations; the Company's revenues are dependent on the market prices for gold, which have recently experienced significant fluctuations; the Company may not be able to secure additional financing when needed or on acceptable terms; the Company's shareholders may be subject to future dilution; risks related to changes in interest rates and foreign currency exchange rates; changes to taxation laws applicable to the Company may affect the Company's profitability and ability to repatriate funds; risks related to the Company's internal controls over financial reporting and compliance with applicable accounting regulations and securities laws; risks related to information systems security threats; non-compliance with public disclosure obligations could have an adverse effect on the Company's share price; the carrying value of the Company's assets may change and these assets may be subject to impairment charges; risks associated with changes in reporting standards; the Company may be liable for uninsured or partially insured losses; the Company may be subject to litigation; damage to the Company's reputation could result in decreased investor confidence and increased challenges in developing and maintaining community relations which may have adverse effects on the business, results of operations and financial conditions of the Company and the Company's share price; the Company may be unsuccessful in identifying targets for acquisition or completing suitable corporate transactions, and any such transactions may not be beneficial to the Company or its shareholders; the Company must compete with other mining companies and individuals for mining interests; the Company's growth, future profitability and ability to obtain financing may be impacted by global financial conditions; the Company's common shares may experience price and trading volume volatility; the Company has never paid dividends and does not expect to do so in the foreseeable future; the Company's shareholders may be unable to sell significant quantities of the Company's common shares into the public trading markets without a significant reduction in the price of its common shares, or at all; and any such other risk factors described under the heading "Risk Factors" in the Company's Annual Information Form.
Although the Company has attempted to identify important factors that could cause actual results or events to differ materially from those described in the forward-looking statements, you are cautioned that this list is not exhaustive and there may be other factors that the Company has not identified. Furthermore, the Company undertakes no obligation to update or revise any forward-looking statements included in, or incorporated by reference in, this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

CGI and Kesko enter strategic partnership to accelerate digital transformation Français
CGI and Kesko enter strategic partnership to accelerate digital transformation Français

Cision Canada

time33 minutes ago

  • Cision Canada

CGI and Kesko enter strategic partnership to accelerate digital transformation Français

HELSINKI, Finland, Aug. 20, 2025 /CNW/ - CGI (TSX: GIB.A) (NYSE: GIB), one of the largest independent IT and business consulting services firms in the world, and retail services company Kesko have signed an agreement for a strategic partnership to accelerate digital transformation. The partnership covers a wide range of IT services, including end-user services, capacity and cloud services, as well as integrations. In addition, CGI will support the K Group retail network in digital development initiatives. "K Group's goal is to be a forerunner in digital services within the retail sector. In the competitive bidding process, our aim was to find a partner with the best capability to support our business growth and development by leveraging the newest technologies efficiently. The development of automation and AI-based solutions plays a significant role in renewing our business and improving productivity. CGI's strong international expertise combined with local presence convinced us of the company's ability to support us in achieving our objectives," says Arto Hiltunen, CIO at Kesko. "The current trend in the IT sector is that forerunner companies like Kesko are now building strategic collaboration models in which partners participate closely in business development and growth as shared goals and risks. We thank Kesko for the trust in forming a genuine and deep partnership, where the achievement of strategic goals is guided by joint metrics and investments," says Leena-Mari Lähteenmaa, President, CGI Finland, Poland and Baltics. CGI helps retail, consumer and services organizations leverage AI and data-driven strategies to boost profitability by delivering friction-free omnichannel customer experiences, enhancing supply chain agility, streamlining store operations, advancing sustainable transformation, and optimizing IT investments. Read more: About CGI Founded in 1976, CGI is among the largest independent IT and business consulting services firms in the world. With 93,000 consultants and professionals across the globe, CGI delivers an end-to-end portfolio of capabilities, from strategic IT and business consulting to systems integration, managed IT and business process services and intellectual property solutions. CGI works with clients through a local relationship model complemented by a global delivery network that helps clients digitally transform their organizations and accelerate results. CGI Fiscal 2024 reported revenue is CA$14.68 billion and CGI shares are listed on the TSX (GIB.A) and the NYSE (GIB). Learn more at SOURCE CGI Inc.

Hyundai Motor Group Hosts Pleos SDV Standard Forum to Drive Software-Defined Vehicle Era through Collaboration
Hyundai Motor Group Hosts Pleos SDV Standard Forum to Drive Software-Defined Vehicle Era through Collaboration

Cision Canada

time33 minutes ago

  • Cision Canada

Hyundai Motor Group Hosts Pleos SDV Standard Forum to Drive Software-Defined Vehicle Era through Collaboration

Hyundai Motor Group aims to lead the SDV era with its partners, addressing rapid industry shifts and accelerating the transition to a software-focused paradigm The forum introduces a new collaboration model to drive innovation across the value chain and establish a software-centric ecosystem for SDV development The Group presents a technology roadmap to drive SDV innovation and establish an aligned supply chain based on the values of speed, transparency and trust The event features keynote speeches and technical sessions addressing topics, such as: E&E architecture, vehicle OS and security, diagnostics and standardization SEOUL, South Korea, Aug. 20, 2025 /CNW/ -- Hyundai Motor Group (the Group) has reinforced its leadership in the software-defined vehicle (SDV) era by sharing the latest technology standards and software development system with its key partners, strengthening the foundation for collaboration. Today, the Group hosted the 'Pleos SDV Standard Forum' at the Software Dream Center in Pangyo, Korea. The event brought together core engineering leaders from 58 key partners, including Hyundai Mobis, Hyundai Kefico, Bosch, Continental, HL Mando, and other vehicle control system specialists. This forum, held as the automotive industry undergoes a major shift from hardware to software-centric development, aimed to accelerate the transition to SDVs. It serves as a way to transform supply chains and enhance the industry's adaptability to this transformation. "Close collaboration with key partners and the widespread adoption of standardized development frameworks are essential for implementing SDVs," said Chang Song, President and Head of the Advanced Vehicle Platform (AVP) Division at Hyundai Motor Group. "We will continue to establish a software-driven collaborative network by distributing technical standards and building a supply chain system for SDV mass production." Unlike traditional hardware-based vehicles, SDVs are defined as platforms capable of ongoing updates and feature expansions even after delivery. Achieving mass production of SDVs requires a complete reorganization of development environments across all areas, including component suppliers, software developers and specialists in diagnostics, security and verification. To support this shift, standardized frameworks and collaborative ecosystems are essential. Through the forum, the Group shared the latest technical standards and development frameworks required for the SDV transition, enabling the establishment of a software-centric collaboration system to accelerate industry advancements. The forum began with a keynote speech from President Song and featured five key sessions, including: Transitioning vehicle development methods for SDV mass production. Applying CODA [1] (Computing & I/O Domain-based E&E Architecture) for developing optimized hardware and flexible software architecture. Facilitating vehicle software development based on the Pleos Vehicle OS. Establishing a standardized, scalable framework for external devices (Plug & Play). Developing integrated software tools to foster collaboration between OEMs and suppliers. These sessions expanded on the strategies presented at the 'Pleos 25' developer conference in March. Executives and technical leaders from Hyundai Motor, Kia and 42dot — the Group's global software center — presented strategies to address the challenges of the SDV transition and engaged in panel discussions and Q&A interactions. One key highlight was the introduction of a standardized software development framework to support SDV development. This framework provides detailed guidelines for partners to adopt it within their own development environments and covers the entire development process — from defining specifications to feature validation, issue management and tracking outputs. A standout feature is the ability for the Group and its partners to securely connect and share development data in real time, ensuring seamless collaboration while maintaining data security. The adoption of this standardized framework is expected to significantly enhance the efficiency and quality of software development by integrating the expertise of various partners working on vehicle control units. Moreover, this transition marks a shift from the traditional hardware-focused vertical supply chain to a software-driven, horizontally integrated collaboration model. It is anticipated to form the critical infrastructure for large-scale SDV production. Through this forum, the Group aims to support its partners in discovering new business opportunities aligned with the SDV era. It plans to continue operating regular forums, sharing technical roadmaps, and accelerating the transformation of development environments through ongoing collaboration. At the 'Pleos 25' developer conference in March, the Group launched its integrated software platform brand 'Pleos', unveiling plans for an in-vehicle app ecosystem and global partnerships to advance its transformation into a software-first mobility tech company.

CIRO to Hold a Disciplinary Hearing for Abid Hossain English Français
CIRO to Hold a Disciplinary Hearing for Abid Hossain English Français

Cision Canada

timean hour ago

  • Cision Canada

CIRO to Hold a Disciplinary Hearing for Abid Hossain English Français

TORONTO, le 19 août 2025 /CNW/ - An initial appearance has been scheduled under the Investment Dealer and Partially Consolidated Rules before a hearing panel of the Canadian Investment Regulatory Organization (CIRO) to set a date for a disciplinary hearing in the matter of Abid Hossain. The initial appearance is open to the public unless the hearing panel orders otherwise. The date for the disciplinary hearing will be made available at Initial Appearance Date: August 28, 2025 at 10:00 am (Eastern Time) Location: Toronto, Ontario (via videoconference) Members of the public, who would like to obtain further particulars, should fill out this form. The hearing concerns allegations that Abid Hossain misappropriated, misapplied, or failed to account for the proceeds of redemptions of client investments that he processed, and failed to cooperate with an investigation by CIRO Staff into his conduct. The Notice of Hearing and Statement of Allegations, which set out the allegations, are available at: The alleged violations occurred while Abid Hossain was a Dealing Representative with TD Investment Services in the Toronto, Ontario area. Abid Hossain is not currently registered with a CIRO-regulated firm in any capacity. * * * The Canadian Investment Regulatory Organization (CIRO) is the national self-regulatory organization that oversees all investment dealers, mutual fund dealers and trading activity on Canada's debt and equity marketplaces. CIRO is committed to the protection of investors, providing efficient and consistent regulation, and building Canadians' trust in financial regulation and the people managing their investments. For more information, visit All information about disciplinary proceedings relating to current and former member firms and individual registrants under the Investment Dealer and Partially Consolidated Rules (for investment dealers), the Mutual Fund Dealer Rules (for mutual fund dealers) and the Universal Market Integrity Rules (UMIR) is available on CIRO's website. Background information regarding the qualifications and disciplinary history, if any, of advisors currently employed by CIRO-regulated investment firms is available free of charge through the AdvisorReport service. Information on how to make dealer, advisor or marketplace-related complaints is available by calling 1-877-442-4322. CIRO investigates possible misconduct by its member firms and individual registrants. It can bring disciplinary proceedings which may result in sanctions including fines, suspensions, permanent bars, expulsion from membership, or termination of rights and privileges for individuals and firms. All other Inquiries: Complaints & Inquiries Secure form Toll-free (Canada/US) 1-877-442-4322 Hearing Notice Number: 25-0236 SOURCE L'Organisme canadien de règlementation des investissements (OCRI)

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store