logo
13th M'sia Plan marginalises Chinese, Indians

13th M'sia Plan marginalises Chinese, Indians

Malaysiakini2 hours ago
COMMENT | What is the point of Prime Minister Anwar Ibrahim defending the government's bumiputera policies when the administration has given in other areas to the overall detriment of the country?
At the same time, Anwar defended the 13th Malaysia Plan (13MP) by saying that it was far superior to the other five-year plans because financial allocations to the bumiputera far exceeded previous ones.
Again, it is the same contradictory Anwar who defended the 13MP by saying that it was race and religion-neutral.
Yet the Chinese and Indians were given a pittance in financial allocations.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Ensure basic education facilities are part of your plans, Anwar tells housing developers
Ensure basic education facilities are part of your plans, Anwar tells housing developers

The Star

time28 minutes ago

  • The Star

Ensure basic education facilities are part of your plans, Anwar tells housing developers

KUALA LUMPUR: The developer and contractor of a housing project here were caught unawares when Datuk Seri Anwar Ibrahim called them out during a groundbreaking ceremony and asked if a school was part of the plan. The developer, Danau Lumayan Sdn Bhd, and its turnkey contractor, Pesona Metro Holdings Bhd, were surprised when the Prime Minister stopped his speech and asked them if the housing project had preschools and a school within its vicinity. Anwar did this midway into his speech during the groundbreaking ceremony of Residensi Aman Madani in Bandar Sri Permaisuri here Wednesday (Aug 6). Also present at the event was Dr Zaliha Mustafa, Minister in the Prime Minister's Department (Federal Territories), and Bandar Tun Razak MP Datuk Seri Dr Wan Azizah Wan Ismail, who is also the Prime Minister's wife. Anwar said that all housing projects must ensure that basic education facilities are part of the plan as education is a basic need of every household. Anwar said that parents who buy new houses should not have to walk far to send their toddlers to nurseries or kindergartens and children should not have to go far to get to schools. 'Urban developments should include schools, childcare, and health facilities. We cannot plan cities without thinking about the needs of the people. We should not build houses without schools nearby. Projects should be monitored directly by the Prime Minister to ensure they follow this concept. 'If we want to be responsible leaders, we must act on the people's complaints. We must uphold integrity. Do not approve projects solely just because we claim to be 'clean'. Being clean also means being efficient. Corruption and commissions must be eradicated,' said Anwar. He said that parents should not have to worry about their children getting to and from schools, if schools are nearby or within the vicinity of the housing project. 'All housing projects should have preschools and schools incorporated as part of their plan. If there are no schools already existing nearby, then there must be dedicated vertical schools (for the community). 'Next Monday (Aug 11), the developers, contractors, the FT minister and project planners must brief me on where the schools and preschools are. 'I don't mind the attacks on me in Parliament but we must do the necessary to attend to the people's needs. 'We need both primary and secondary schools. If there are no schools nearby, at least one block in the area must be allocated for educational purposes. A second block should be reserved until all conditions are met. If we want vertical schools, we must ensure proper facilities and planning,' said Anwar. He said that developers should address the reality on the ground, especially of urban dwellers who need houses but earn only so much. 'Many urban parents earn only RM2000 to 3000 per month. Kindergartens are too far - some up to 2km away. I've instructed that kindergartens be located within buildings. If not, this needs to be corrected by the city planners. The goal is to allow parents to work peacefully, knowing their children are safe and nearby. 'The urban poor need our focus. In many cases, the urban poor outnumber rural poor. Programmes should be aimed at them. The government should reduce costs, increase wages, and prioritise public service effectiveness. "I appreciate the city's efforts in building more stalls for small traders. About 85% of Federal Territory residents buy from these small stalls. We shouldn't neglect them while building tall luxury towers. Let's not only beautify the city but also support everyday livelihoods,' said Anwar. In the Residensi Aman Madani project, housing developer Danau Lumayan will develop 3,438 units of affordable housing in Bandar Sri Permaisuri, Cheras. The affordable housing project, with a gross development value (GDV) of approximately RM1.01bil, will be known as Residensi Wilayah Aman Lumayan. The project, which comprises three phases — Phase 1, Phase 2A, and Phase 2B — will be fully completed within five years.

China ramps up military activity around territory
China ramps up military activity around territory

Malaysia Sun

time32 minutes ago

  • Malaysia Sun

China ramps up military activity around territory

Taipei [Taiwan], August 6 (ANI): Taiwan's Ministry of National Defence detected 16 Chinese military aircraft, six Chinese naval vessels and one official ship operating around its territorial waters as of 6 am (local time) on Wednesday. Of the 16 sorties, eight crossed the median line and entered Taiwan's northern and eastern ADIZ (Air Defence Identification Zone). In a post on X, the MND said, '16 sorties of PLA aircraft, 6 PLAN vessels and 1 official ship operating around Taiwan were detected up until 6 a.m. (UTC+8) today. 8 out of 16 sorties crossed the median line and entered Taiwan's northern and eastern ADIZ. We have monitored the situation and responded.' Earlier on Tuesday, 12 sorties of PLA aircraft, five PLAN vessels and one official ship were operating around its territory. MND wrote on X, '12 sorties of PLA aircraft, 5 PLAN vessels and 1 official ship operating around Taiwan were detected up until 6 a.m. (UTC+8) today. 8 out of 12 sorties crossed the median line and entered Taiwan's northern and eastern ADIZ. We have monitored the situation and responded.' The frequent incursions and maritime operations reflect rising tensions between Taiwan and China, a relationship long fraught with geopolitical strain. Taiwan, officially known as the Republic of China (ROC), governs itself independently with its own distinct political and economic systems. However, China continues to claim Taiwan as part of its territory under the 'One China' principle, insisting there is only one China with its capital in Beijing. The dispute's roots trace back to the end of the Chinese Civil War in 1949, when the ROC government fled to Taiwan after the Communist Party, led by Mao Zedong, took control of mainland China. Since then, Beijing has maintained its goal of reunification, using military, diplomatic, and economic means to apply pressure on Taiwan and diminish its international space. Despite these efforts, Taiwan maintains its de facto independence, backed by strong public support, and continues to assert its sovereignty amid ongoing external pressures. The MND regularly monitors and publicly reports such military movements to ensure transparency and national security awareness. (ANI)

No nuclear decision before 2030
No nuclear decision before 2030

New Straits Times

timean hour ago

  • New Straits Times

No nuclear decision before 2030

KUALA LUMPUR: Malaysia will not commit to developing a nuclear power plant until after 2030, Deputy Prime Minister and Minister of Energy Transition and Water Transformation Datuk Fadillah Yusof said today. Speaking at the Driving the Green Energy Transition event by MBSB, Fadillah confirmed that nuclear energy remains in the research and evaluation phase, and no firm decision has been made. "No, we have not decided. The decision will only come after 2030, after we study the whole regulation, the technologies and so on," he told reporters after MBSB's Driving the Green Energy Transition here today. His remarks come in the wake of the 13th Malaysia Plan (13MP), which outlines a preliminary roadmap for nuclear development, including a nuclear energy programme targeted for 2031. Fadillah said that public acceptance, safety, and environmental considerations will be central to any future decision. "It can only be implemented when there's public acceptance. All aspects have to be considered: the safety, the social well-being of the people, and of course the environmental perspective," he explained. He reaffirmed that safety and security would remain non-negotiable in any decision involving nuclear power. "Safety and security are critical for us. So we have to evaluate everything first. It's too early to say whether we will use it or not," he said, adding that the current phase is focused purely on analysis and study to determine whether nuclear can or should be implemented in Malaysia. Fadillah also touched on the potential return of Malaysian nuclear experts currently based overseas, should the country decide to proceed with a nuclear power project in the future. "Once we have decided to build the nuclear plant, we will bring all the diaspora back to the country," he said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store