
Finally, city to get all-weather swimming pool, C&D waste plant in Ludhiana soon
Ludhiana: A few much-awaited projects of the civic body are ready for inauguration and will be handed over to the public soon. Work on the all-weather swimming pool and construction and demolition waste plant is complete while the basketball court is near completion.
Officials said that it will take another week to complete the remaining work.
The construction and demolition (C&D) waste plant set up in Dhandhari was initially conceived under the Smart City Mission but was taken up under the Swachh Bharat Mission due to increase in its cost and change in the structure. The project cost was estimated at Rs 2.69 crore, but the site allocated for the project turned out to be a dumpsite, because of which authorities needed to construct pillars and remove the trash.
This led to escalation of the project cost. Finally, the tender was awarded for Rs 7.30 crore, with an additional Rs 2.20 crore spent on machinery, which was purchased under the Smart City Mission.
The plant constructed by the civic body will have the capacity to process at least 100 tons of construction waste per day. Officials said that after crushing the waste, the contractor will manufacture multiple products, like tiles.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Explore Home Solar Installation Careers and Training Options
LocalPlan
Search Now
Undo
The C&D waste plant is urgently needed in the city, as frequent construction work results in heaps of rubble lying everywhere. The civic body attempted to designate places where people could dispose of waste, but it did not work, and waste can even be seen in green belts.
The all weather swimming pool was also a longstanding demand in the city, where residents did not have a place to swim during the winter months. Only a few clubs and private places have all-weather pools.
Swimming enthusiasts, especially players, were unable to practise. The all-weather pool has been constructed near Rakh Bagh, adjoining the older MC pool, which remains operational in the summer. The pool has been constructed under the Smart City Mission at a cost of Rs 5.82 crore.
It is 4.5 feet deep on one side and 6 feet on the other.
The third project is the basketball court in Guru Nanak Stadium, costing Rs 14.38 crore under the Smart City Mission.
It will take another week to complete the work. This project has missed several deadlines already and now, two courts are almost ready.
MC commissioner Aaditya Dachalwal said, "The swimming pool is ready and if anyone wants to use it, they can go ahead. We have also conducted trial runs of the C&D waste plant, which will start shortly. However, the basketball court will take time. It will also start in some time."
Now that the MC has constructed sports infrastructure, including a table tennis court, basketball court, and all-weather swimming pool, officials plan to hand over the projects to private bodies for proper maintenance.
Ludhiana: A few much-awaited projects of the civic body are ready for inauguration and will be handed over to the public soon. Work on the all-weather swimming pool and construction and demolition waste plant is complete while the basketball court is near completion. Officials said that it will take another week to complete the remaining work.
The construction and demolition (C&D) waste plant set up in Dhandhari was initially conceived under the Smart City Mission but was taken up under the Swachh Bharat Mission due to increase in its cost and change in the structure.
The project cost was estimated at Rs 2.69 crore, but the site allocated for the project turned out to be a dumpsite, because of which authorities needed to construct pillars and remove the trash.
This led to escalation of the project cost. Finally, the tender was awarded for Rs 7.30 crore, with an additional Rs 2.20 crore spent on machinery, which was purchased under the Smart City Mission.
The plant constructed by the civic body will have the capacity to process at least 100 tons of construction waste per day.
Officials said that after crushing the waste, the contractor will manufacture multiple products, like tiles. The C&D waste plant is urgently needed in the city, as frequent construction work results in heaps of rubble lying everywhere. The civic body attempted to designate places where people could dispose of waste, but it did not work, and waste can even be seen in green belts.
The all weather swimming pool was also a longstanding demand in the city, where residents did not have a place to swim during the winter months.
Only a few clubs and private places have all-weather pools. Swimming enthusiasts, especially players, were unable to practise. The all-weather pool has been constructed near Rakh Bagh, adjoining the older MC pool, which remains operational in the summer. The pool has been constructed under the Smart City Mission at a cost of Rs 5.82 crore.
It is 4.5 feet deep on one side and 6 feet on the other.
The third project is the basketball court in Guru Nanak Stadium, costing Rs 14.38 crore under the Smart City Mission.
It will take another week to complete the work. This project has missed several deadlines already and now, two courts are almost ready.
MC commissioner Aaditya Dachalwal said, "The swimming pool is ready and if anyone wants to use it, they can go ahead. We have also conducted trial runs of the C&D waste plant, which will start shortly. However, the basketball court will take time. It will also start in some time."
Now that the MC has constructed sports infrastructure, including a table tennis court, basketball court, and all-weather swimming pool, officials plan to hand over the projects to private bodies for proper maintenance.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
27 minutes ago
- Time of India
Archbishop Udumala Bala receives pallium from Pope Leo XIV
Visakhapatnam/Vatican City: In a solemn liturgical ceremony held at St. Peter's Basilica in the Vatican, Pope Leo XIV conferred the pallium on archbishop Udumala Bala of Visakhapatnam , symbolizing his authority and unity with the Holy See as the Metropolitan Archbishop. The Holy Eucharist marking the conferral took place on Sunday, June 29, at 9:30 am Rome time, coinciding with the feast of saint Peter and saint Paul — a traditional occasion for bestowing the pallium on newly appointed metropolitan archbishops. Archbishop Bala, in a message stated: "The Holy Eucharist of the conferral of the pallium on me by Pope Leo XIV took place at St. Peter's Basilica, Vatican. I offered prayers as I received this symbol of communion with the holy father and my pastoral mission as metropolitan archbishop of Visakhapatnam." The pallium — a narrow band of white wool with six embroidered crosses — is worn over the shoulders and signifies both the archbishop's role as a shepherd within his province and his connection with the papacy. It is traditionally conferred only by the pope. Archbishop Bala, who leads the ecclesiastical province of Visakhapatnam, had assumed his role earlier this year. The province includes several suffragan dioceses across Andhra Pradesh. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Bring home all new SP160 & get an instant cashback up to ₹5000# Honda Learn More Undo The ceremony was attended by other metropolitan archbishops from around the world, with Pope Leo XIV presiding over the liturgy. The conferral of the pallium serves as both a symbol of pastoral responsibility and a visible expression of the archbishop's fidelity to the mission of the universal church.


Time of India
an hour ago
- Time of India
Over 60,000 found ineligible under Delhi government's Women's Pension Scheme after verification drive
Over 60,000 beneficiaries have been found ineligible under the Delhi government's Women's Pension Scheme following a large-scale verification exercise conducted by the Women and Child Development (WCD) Department, officials on Monday said. This scheme provides a monthly financial assistance of Rs 2,500 to widowed, divorced, separated and destitute women. However, a door-to-door verification drive launched in November last year uncovered widespread discrepancies. As a result, the names of over 60,000 ineligible recipients have now been removed from the beneficiary list, an official told PTI. "The verification revealed several instances where women no longer met the eligibility criteria but continued to receive the pension. These included remarried women claiming to be divorced, employed women drawing assistance despite a steady income and others who no longer resided at their registered addresses," he said. The official said that "a number of beneficiaries were found to be ineligible under the existing norms of the scheme". Live Events "The verification drive has been completed in all districts and necessary corrections have been made to the database," he said, adding this exercise has enabled us to ensure that the pension is provided only to those who genuinely qualify for it. The official said the verification process, conducted by the Anganwadi workers, covered nearly 4.25 lakh beneficiaries. Pension payments have been discontinued for those found ineligible and resumed for verified beneficiaries. At present, around 3.65 lakh women are receiving regular pension under the scheme, he added. The official further said that the initiative was not intended to withdraw support from genuine applicants but to eliminate fraudulent claims and strengthen accountability. "Correcting the beneficiary list is essential to uphold the integrity of the welfare system, it also helps avoid diversion of funds and ensures that deserving women are not deprived of timely assistance," he added. This scheme was introduced in 2007-08 to provide a regular source of income to economically weak widows. It supported 6,288 women with Rs 600 per month in the first year. Over time, the benefit amount was increased and eligibility was expanded. Currently, eligible applicants must be at least 18 years old, residents of Delhi for five or more years and belong to families with an annual income not exceeding Rs 1 lakh. The Delhi government spends nearly Rs 1,140 crore annually on the scheme on 3.65 lakh beneficiaries.


India Today
4 hours ago
- India Today
Andhra's remote tribal hamlet gets road, school after India Today report
Days after India Today highlighted the plight of the Solubongu tribal hamlet in Andhra Pradesh's Alluri Seetharamaraju district, officials swung into action. The district administration visited the remote village, took cognisance of the issues, and initiated road construction work. A special school for the village has also been tribal residents, who had long struggled with poor connectivity, broke into laughter and celebrated with traditional Dinsa dances, thanking officials for their swift District Collector of Alluri Seetharamaraju district personally visited Solubongu and oversaw the road work from Veerabhadrapet to the village. Officials from the Tribal Welfare Department and Sarva Shiksha Abhiyan also visited the hamlet. Solubongu, located under Anantagiri mandal's Pinnikota panchayat, is home to 16 families of the Nuka Dora tribe, with a population of years, 12 children from the village had to cross the three-kilometre Raiwada reservoir by boat and then walk another two kilometres to reach Thamarabba MPP School. This posed serious risks, especially during illnesses and tribals welcomed the officials with flower garlands and felicitated them. As part of immediate relief, Araku Tribal Welfare EE Venugopal Rao sanctioned Rs 3 crore for constructing a gravel road to the village. The work was ceremoniously launched by local elders breaking coconuts and offering prayers to Dippala Sarva Shiksha Abhiyan District Coordinator Dr. R Swaminaidu announced that the Collector had ordered the establishment of a special school in Solubongu. An educational volunteer was appointed to start classes immediately, and five children from Classes 3, 4, and 5 will also be enrolled at Pinnikota Tribal Welfare School starting said they would provide clothes, needles, books, and other facilities for the children. The villagers said that due to the efforts made in the media, 'new lights have come to our village' and that 'even today we celebrated as if we had complete independence.'They added, 'Our situation is that we have to go on a three-kilometer boat when we get fever and tie a drum from there. Our children are always living in a situation where they are worried about what will happen.'- Ends IN THIS STORY#Andhra Pradesh