logo
In Faisalabad, Jica hands over water treatment plant

In Faisalabad, Jica hands over water treatment plant

FAISALABAD: A handover ceremony for the Grant Aid project 'The Project for the Improvement of Water Treatment Plant and Water Distribution System in Faisalabad' (grant amount: 4.094 billion yen) was held here on Wednesday.
Ambassador of Japan to Pakistan Akamatsu Shuichi, Chief Representative of Japan International Cooperation Agency (Jica) Pakistan Office Naoaki Miyata and Managing Director for Water and Sanitation Agency, Faisalabad Aamer Aziz attended the ceremony.
To address the water shortage issue, JICA provided technical cooperation from 2016 to 2019 and formulated the Water Supply, Sewerage and Drainage Master Plan with the target year of 2038. This Grant Aid project was selected as a priority project in the master plan.
This Grant Aid project upgraded and expanded the Old Jhal Khanuana water treatment plant and developed water transmission and distribution facilities, including the pipe network, tripling the water supply. This increase in water supply helps improve water services in Faisalabad. It also supports the achievement of SDG Goal 6: 'Ensure availability and sustainable management of water and sanitation for all.'
At the handover ceremony, Ambassador Akamatsu stated, 'I hope that all facilities installed under Japan's project will be fully utilized in a sustainable manner and that the expertise and experience gained will benefit the people in Faisalabad.'
Copyright Business Recorder, 2025

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Pindi's water demand outpaces supply
Pindi's water demand outpaces supply

Express Tribune

time25-05-2025

  • Express Tribune

Pindi's water demand outpaces supply

Six out of nine water filtration plants are in disrepair in Karachi city, where only 150 cylinders of chlorine are available each month. PHOTO: PIXABAY With an expansion in population, groundwater depletion and migration of people to the garrison city, Rawalpindi faces water availability challenges and urgently requires a multi-faceted approach. These approaches include expanding water storage capacity through dams and reservoirs, improving water distribution networks, promoting water conservation measures, and addressing issues like tanker mafia and infrastructure maintenance. Recognising these challenges, the city's civic agencies have been taking measures for the construction of new dams like Chahan and Daducha dams, and side by side steps for maintaining the storage capacity of existing Rawal and Khanpur dams. Managing Director (MD) of Water and Sanitation Agency (WASA) Muhammad Saleem Ashraf says the Garrison City needs a total water supply of around 51 Million Gallons Daily (MGD) in winter, 30.5 MGD of which is through 480 tube-wells, 10 MGD from the Rawal Dam and 6 MGD from the Khanpur Dam. The city has to face a shortfall of around 7 MGD in winter, which rises to around 19 MGD during summer, with the daily water demand reaching over 70 MGD, he added. Both the cantonments (Rawalpindi and Chaklala) also receive some 12 MGD water from the Rawal Dam, the WASA MD said. For overcoming the water shortage, Saleem says work is already underway on the Developing Resilient Environment and Advancing Municipal Services (DREAMS-I) project, funded by the Asian Development Bank (ADB). The project's overall scope involved the treatment and transportation of 14.5 MGD water from Chahan Dam to Rawalpindi city, besides the improvement and replacement of the city's existing water supply system, he added. Moreover, he said, the rehabilitation and upgradation of Rawal Lake filtration plants were also in process to supply an additional 5 MGD of water to the Garrison City. Similarly, he said, two new heavy pumps are being installed at the Khanpur Dam to increase water supply to 8 MGD. The project to provide a 24/7 water supply to three union councils of Khayaban-e-Sir Syed was also underway." This project (DREAMS) of public importance will be completed in two years instead of the stipulated period of three years," he added. The MD further said that work on the Chahan Dam treatment plant had been kicked off, which was expected to provide 10 MGD of water to Rawalpindi city. He said the feasibility of setting up the Daducha Dam had been included in the Punjab Annual Development Plan, which would hopefully provide 30.5 MGD water to meet the future needs of the city. As regards water losses, he said that water leakage and theft from the distribution network were major sources of water loss and needed to be addressed. He said the Punjab Government had banned the establishment of new car washing stations across the province. In compliance with the orders of the Lahore High Court (LHC), the Punjab Environmental Agency (EPA) had imposed a ban on non-essential use of underground water and violators, including car wash/service stations, would have to face heavy fines, he warned. Chief Executive Officer of the Rawalpindi Cantonment Board (RCB) Syed Ali Rizvi says the RCB provides some 1.50 MGD water to its residents from 55 tube wells, 11.28 MGD from the Khanpur Dam and 0.03 MGD from the Rawal Dam. The RCB's distribution network includes eight overhead reservoirs and 34 underground tanks, he says and adds the Board provides clean drinking water to the people through 52 filtration plants. MNA Malik Ibrar Ahmed says the construction of modern underground tanks having a capacity to store 1 MGD water has entered the final stage. The project aims to provide a lasting solution to the longstanding water shortage in local communities of RCB areas, ensuring improved supply and overcoming the seasonal scarcity, especially during the summer months. He says every year, with the onset of summer, the residents of Rawalpindi and Chaklala cantonments face severe water shortages due to the lack of storage facilities, but allocated funds are now being prioritised for the timely completion of the vital projects. The construction of underground tanks at Bhata Chowk, with a storage capacity of 200,000 gallons per day, and Gawalmandi, with a capacity of 100,000 gallons per day, are rapidly progressing, the MNA adds. Additionally, he adds, projects are underway at Naseerabad, Barf Khana Chowk, Ghazi Abad, Afshan Colony, Tench Bhatta, Tahli Mohri, and Wards 7, 8, 9 and 10 of the Chaklala Cantonment, each designed to store 50,000 gallons daily.

Japan to help install smart water meters
Japan to help install smart water meters

Express Tribune

time19-05-2025

  • Express Tribune

Japan to help install smart water meters

The government of Japan has approved a grant of $3.5 million under its Economic and Social Development Programme for the installation of smart water meters and related equipment for the Water and Sanitation Agency (WASA). The agreement was signed in Islamabad between the Embassy of Japan and Pakistan's Economic Affairs Division. WASA Managing Director Amir Aziz shared these developments while speaking with media representatives. He said the project was part of broader efforts to support WASA's shift from a flat-rate to a metered billing system. The new system will include the installation of 8,400 smart water meters and aims to enhance the accuracy of billing, improve revenue collection, and increase efficiency in water distribution. Aziz also noted that the Japanese development agency JICA (Japan International Cooperation Agency) has completed a project titled "Construction of Distribution Center and Rehabilitation of the Old Jhal Khanuana Water Treatment Plant" at a cost of Rs7,250 million. Discussing other foreign-funded projects, the MD said WASA Faisalabad has revived three long-pending international initiatives. These include the French-funded "Extension of Water Resources for Faisalabad City – Phase II" project, valued at Rs14,636.928 million. According to Aziz, work on this project commenced with the signing of the contract on August 8, 2024, followed by site mobilization on October 8, 2024. The tender for transmission was opened on April 7, 2025, and technical evaluation is currently underway. Once completed, it is expected to serve around six million residents. Aziz also mentioned the Denmark-funded Eastern Wastewater Treatment Plant (Phase I) project, worth Rs56,036.79 million, which aims to build a 33 million gallons per day (MGD) treatment facility in Faisalabad. The government of Punjab granted administrative approval on April 16, 2025, and loan agreement formalities with Denmark are in progress. The project aligns with the United Nations Sustainable Development Goals (SDGs) 2030 targets. Regarding another JICA-assisted initiative, "Improvement of Management Capacity of Water Supply Sector in Faisalabad," Aziz stated that the project includes the digital monitoring of three overhead reservoirs and one disposal station. Remote operations have begun and assessments of tube-well equipment have been completed. The project is estimated to serve two million people. He further said the government of Punjab has also approved a new sewerage development package for Faisalabad city worth Rs10,810 million. Chaudhary Rasheed Ahmad, retired chief engineer of the Public Health Department and a water expert, has emphasized the urgent need to implement smart water metering systems in light of the growing depletion of water resources, shortage of potable water, and widespread wastage of drinking water by the public. He stated that smart metering could help prevent unnecessary use of water and contribute to its conservation. He pointed out that in many households, potable piped water is used extensively for non-essential purposes such as washing utensils and vehicles, resulting in significant pressure on groundwater reserves. Rasheed added that WASA Faisalabad currently has over 500,000 registered water consumers, and the installation of only 8,400 smart meters is insufficient to address the scale of the challenge. Member of the Provincial Assembly, Chaudhary Faqir Hussain Dogar, also underlined the issue, noting that the suspension of the Indus Waters Treaty by the Indian government has impacted Pakistan's water availability, exacerbating shortages in water bodies and canal systems.

Rawalpindi faces acute water crisis
Rawalpindi faces acute water crisis

Express Tribune

time18-05-2025

  • Express Tribune

Rawalpindi faces acute water crisis

As the summer begins and heatwave persists, residents of Rawalpindi city and cantonment areas are worried about bearing another spell of water scarcity as the mushroom growth of housing societies and rising population continue to exert extra pressure on this precious resource. Despite repeated claims of the civic agencies' masters to ensure a smooth water supply, water shortage and water rationing continue to leave consumers at the mercy of the growing tanker mafia. Name any area of the city, including Shah Nazar, Dhok Chiragh Din, Dhok Hassu, Ratta Amral, Dhok Ratta, Pir Wadhai, and one finds residents complaining of water scarcity or water rationing, with the supply and demand gap widening during summer. No matter that civic agencies remain on their toes during the peak season to meet the water needs of residents, they also face unavoidable challenges like water availability, construction of new reservoirs and ample funding. The Managing Director (MD) of the Water and Sanitation Agency (WASA), Muhammad Saleem Ashraf, says the Garrison city needs a total water supply of around 51 Million Gallons Daily (MGD) in winter, which is met through 480 tube-wells, Rawal Dam and Khanpur Dam. But, during summer, this demand rises to 70 MGD, so if the shortfall is around 7 MGD in winter, it rises to around 19 MGD in summer, he adds. Saleem further says it is understood that water demand increases during summer, and all resources are employed to ensure that consumers' problems are addressed. In this regard, he mentioned ongoing work on a project "Developing Resilient Environment and Advancing Municipal Services (DREAMS-I)" project, funded by the Asian Development Bank (ADB). "The project's overall scope involves treatment and transportation of 14.5 MGD water from Chahan Dam to Rawalpindi city, besides improvement and replacement of the city's existing water supply system," he said. Saleem also referred to the rehabilitation and up-gradation of Rawal Lake filtration plants to supply an additional five MGD of water to the Garrison City. "Similarly, two new heavy pumps are being installed at Khanpur Dam to increase water supply to eight MGD and provide a 24/7 water supply to consumers." He said the DREAMS project will be completed in two years instead of the stipulated period of three years, while work on Chahan Dam treatment plant has also been kicked off and is expected to provide 10 MGD of water to residents. "Moreover, the feasibility study for Dadhocha Dam has been included in the Punjab Annual Development Plan and will hopefully provide 30.5 MGD to Pindi residents." However, he was sceptical of consumers' behaviour who least bother about water conservation practices. Therefore, the Punjab government had banned the setting up of new car washing stations across the province. In compliance with the orders of the LHC, the Punjab EPA had imposed a ban on non-essential use of underground water and violators would be penalised accordingly.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store