logo
NMC to take down hoardings in 15 days, withdraws tender

NMC to take down hoardings in 15 days, withdraws tender

Time of India08-05-2025

Nagpur: The
Nagpur Municipal Corporation
(NMC) on Thursday assured it will remove all
advertisement banners
erected under a now-withdrawn tender within 15 days and fully adhere to the revised 2022 advertising rules going forward.In an affidavit filed before the Nagpur bench of Bombay High Court in response to PIL (No54/2024) filed by Citizen Forum for Equality through counsel Tushar Mandlekar, NMC stated that its commissioner decided to cancel the questioned tender process.
The civic body also confirmed that all hoardings installed under that tender will be dismantled within the stipulated period.The HC, on April 1, held that the NMC's reliance on Rule 29 of Corporation's earlier
Outdoor Advertisement Policy
of 2001 was misplaced. It directed that civic body's e-tendering for hoardings must conform to
Maharashtra Municipal Corporation
(Regulation & Control of the Display of Skysigns & Advertisements) Rules, 2022, not the outdated policy invoked earlier.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

KMC focuses on height of buildings in flight path
KMC focuses on height of buildings in flight path

Time of India

time14 hours ago

  • Time of India

KMC focuses on height of buildings in flight path

1 2 Kolkata: In the wake of the Ahmedabad tragedy, the Kolkata Municipal Corporation (KMC) buildings department has alerted the executive engineers in the boroughs to strictly adhere to the building height guidelines sent by Airports Authority of India (AAI). The AAI issues guidelines to KMC regarding building height restrictions around airports to ensure flight safety. These guidelines are based on the AAI's colour coded zoning maps (CCZM) and dictate permissible building heights within specific zones. Construction exceeding the permissible heights requires an NoC from AAI. According to a buildings department official, maximum vigilance will be maintained in the Cossipore-Dum Dum belt, which is closer to Kolkata airport, and the areas near Behala flying club. According to a modified building rule, the KMC executive engineers need to carefully pass even a G+1 building in the Cossipore-Dum Dum belt due to its proximity to the airport. As far as sanctioning plans in other city areas is concerned, KMC has asked the borough executive engineers to follow the CCZM and, in case of any doubt, refer the matter to seniors at the civic headquarters. "In most cases, we need to keep a check on G+4, G+5, and G+6 buildings located within the specified 20-km radius. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Any building crossing the approved height limit will require special sanction from us. We will take a decision in coordination with AAI," a civic official said. According to the Ministry of Civil Aviation (Height Restrictions for Safeguarding of Aircraft Operations) Rules, 2015, no construction or plantation activity is permitted within a 20-km radius of an airport's Aerodrome Reference Point (ARP) without clearance from authorities concerned. Builders, developers, and individual property owners must secure a mandatory NoC before undertaking any such activity. The NoC, once issued, remains valid for eight years and can be extended for a maximum of 12 years.

Consider setting up permanent consumer courts: SC to Centre
Consider setting up permanent consumer courts: SC to Centre

Time of India

time15 hours ago

  • Time of India

Consider setting up permanent consumer courts: SC to Centre

Nagpur: The Supreme Court recently directed the central govt to create a permanent adjudicatory framework comprising full-time staff and presiding officers for consumer disputes in India. The Centre was directed to submit an affidavit in three months on the feasibility of setting up a permanent consumer tribunal or court. It emphasised that consumer forums cannot be run on temporary tenure-based appointments. "We would only implore upon it to appreciate the pressing need for a permanent structure," the bench noted. The court, invoking powers under Article 142 of the Constitution, passed sweeping directions in a batch of appeals, while ruling on the legality and structure of consumer forums under the 2020 Rules. The SC directed that the new rules, to be notified within four months, must strictly follow earlier judgments in Rojer Mathew and Madras Bar Association cases and include a fixed five-year tenure. It also ruled that the selection committee must have a judiciary-majority composition. No written exam or viva voce will be needed for appointing or reappointing presidents and judicial members of state and district commissions, while such a process will be required only for non-judicial posts, in consultation with respective state service commissions. The SC upheld that only serving or retired district judges would be eligible for the post of district commission presidents. Once the new rules are in place, all states must complete recruitment under them within four months. Striking a Constitutional note, the bench stated, "Consumerism constitutes the very spirit of the Constitution," linking it with Articles 38, 39, and 47. It called consumer rights inalienable and remarked that consumer litigation is a form of public interest litigation, strengthening participatory democracy — a basic feature of the Constitution. The judgment also addressed three HC rulings from Bombay and Telangana concerning appointment procedures. It upheld the Bombay HC's decision to strike down parts of the 2020 Rules but modified certain aspects relating to reappointments and tenure clarifications. It also ruled that all serving appointees, whether selected before or after the Supreme Court's first ruling in the case in March 2023, may continue until the completion of fresh recruitment under the new rules. Tushar Mandlekar, assisted by Tejas Fadnavis, Astha Sharma and Anju Thomas, represented the original petitioner Mahendra Limaye, a Nagpur-based lawyer, while assistant solicitor general Aishwarya Bhati appeared for the central govt. Limaye had approached Nagpur bench of Bombay HC challenging an advertisement issued in May this year for recruitment of members or president in district and state consumer commissions in Maharashtra. The HC order stated, "Rule 6(1) of the Rules of 2020 is struck down on the ground that the same results in diluting the involvement of the judiciary in the process of appointment of the president and members of the state commission and the district commission. The said Rule is against the spirit of the decision of the Constitution Bench". The SC bench made it clear that existing appointees allowed to continue under this judgment will serve a four-year tenure, not the new five-year term. "We feel that the time has come to effect a change in mindset revamping the tenure of office in consumer fora," the judges observed.

Not a mere proposal, Kerala government mulls equity partnership in Aranmula cluster project
Not a mere proposal, Kerala government mulls equity partnership in Aranmula cluster project

Time of India

time18 hours ago

  • Time of India

Not a mere proposal, Kerala government mulls equity partnership in Aranmula cluster project

Thiruvananthapuram: The proposed electronics manufacturing cluster project in the Aranmula wetlands by M/s TOFL Pathanamthitta Infra Ltd — the same company behind the scrapped Aranmula airport project — has now assumed more serious proportions with the state govt itself considering becoming an equity partner in it. The board of Kerala State IT Infrastructure Ltd (KSITIL)—the state's nodal agency for IT infrastructure—has approved key terms, including acceptance of 5% sweat equity — interest in return for labour towards upkeep or restoration — in the project and the appointment of a govt-nominated director on TOFL's board, to enter into the partnership. TOI on Monday reported that the state govt is weighing the cluster proposal on the very same 335-acre stretch of ecologically fragile paddy land and wetland that once sparked statewide protests over an airport proposed there. The present move raises serious questions about the state's policy consistency and environmental commitment, as the LDF govt had scrapped all clearances to the airport project in Nov 2016, in keeping with its election promise. Far from being just a proposal pending before the govt, the matter has now moved decisively forward. An internal note of the IT department quotes directly from KSITIL's board proceedings, stating, "the KSITIL board passed three resolutions in its 66th meeting approving the suggestion to accept sweat equity shares in M/s TOFL and to form a nominee director position as per Section 2(88) and Section 54 of the Companies Act, 2013, and Rule 8 of the Companies (Share Capital and Debentures) Rules, 2014. " It also notes that the proposal is "not only advantageous for the state's industrial growth" but also "indicates that the govt can invest and collaborate with the company." What underlines the gravity of this development is that KSITIL is a fully govt-owned company under the electronics and IT department, which functions directly under the chief minister. "Decisions taken by its board, especially regarding strategic investments, cannot be treated as routine. They are subject to detailed deliberation and political oversight at the highest level. This is not a vague idea awaiting vetting—it is a concrete board-approved strategy awaiting further action," a senior IT department official said on conditions of anonymity. The internal note makes it clear that the company, in exchange for equity participation, expects the state to provide a host of institutional and branding support. It outlines requests to declare the area as an industrial township under the Kerala Industrial Single Window Clearance Board and Industrial Township Act, 1999; establish a dedicated clearance board for fast-tracking statutory approvals; and extend rights to use Technopark's brand and trademarks for co-branding and marketing. KSITIL, as the govt's partner, has also promised to facilitate all infrastructure support, including electricity, water and internet connectivity. The note refers to the 2025 draft IT policy to justify the partnership approach: "As envisaged in the 2025 draft IT policy, joint development with private investors is to be promoted and full support and packages extended to such projects," the KSITIL MD states. These mark a significant deviation from a policy position that once seemed non-negotiable. The same ruling front, which made scrapping the Aranmula airport a cornerstone of its green politics, is now facilitating a project of similar scale, by the same company, on the same land, with even deeper financial and institutional alignment. Notably, the note makes no mention of a fresh environmental impact assessment (EIA) or public consultation processes, despite the well-documented ecological sensitivity of the region. The LDF earlier argued that the land comprised notified paddy fields and wetlands protected under the Kerala Conservation of Paddy Land and Wetland Act, but those concerns seem to have been sidelined in favour of large-scale infrastructure promotion. This pivot, from fierce opposition to institutional collaboration, is not just a political irony, but a moment of reckoning for the state's approach to environmental governance, investor engagement and public accountability.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store