logo
3-day Vidarbha Water Conference from June 7

3-day Vidarbha Water Conference from June 7

Time of India19-05-2025

1
2
Nagpur: The National Service Scheme of
Nagpur University
and Jankalyankari Samiti Nagpur will be jointly organizing
Vidarbha Water Conference
from June 7-9 at Vanamati Auditorium. The poster unveiling of the conference was done by chief minister Devendra Fadnavis.
Acting vice-chancellor Madhavi Khode Chaware, governor-nominated Management Council member Samay Bansod, Academic Council members Vijay Ilorkar and Shubhangi Nakshine were present during the poster unveiling.
The Vidarbha Water Conference will feature a Drinking Water Conference on June 7. A panel discussion on "challenges and solutions for drinking water in Vidarbha" will be held on the inaugural day. Research papers by students and water researchers will also be presented.
Agricultural Water Conference will be held on June 8, starting with a panel discussion on "current situation, problems, and solutions for agricultural water in Vidarbha". The second panel discussion on the same topic will be held along with a presentation of success stories of water management in Vidarbha. A screening and competition of reels created by students on "water issues and solutions in Vidarbha" will also be held.
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
[Click Here] 2025 Best Luxury Hotel Prices
Expertinspector
Learn More
Undo
The Industrial Water Conference is scheduled for June 9 and will involve a panel discussion on "water issues, challenges, and solutions in the industrial sector", followed by a second panel discussion. The awards ceremony and closing event will be held later in the day.
The advisory committee for the Vidarbha Water Conference includes Khode Chaware, VC of Gondwana University Prashant Bokare, Panjabrao Deshmukh Agricultural University, Akola, VC Sharad Gadakh, VC of Maharashtra Animal and Fishery Sciences University, Nagpur, Nitin Patil, VC of Laxminarayan Institute of Technology, Atul Vaidya, executive director of Vidarbha Irrigation Development Corporation, Rajesh Sontakke, director of CSIR-NEERI, Nagpur, S Venkata Mohan, deputy director of Agriculture Nagpur Division Umesh Ghatge, director of National Bureau of Soil Survey and Land Use Planning, Nitin Patil, and deputy director of Groundwater Surveys and Development Agency, Dr Chandrakant Bhoyar.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Maharashtra CM Devendra Fadnavis announces completion of Samruddhi highway; calls it historic, emotional moment
Maharashtra CM Devendra Fadnavis announces completion of Samruddhi highway; calls it historic, emotional moment

India Gazette

time12 hours ago

  • India Gazette

Maharashtra CM Devendra Fadnavis announces completion of Samruddhi highway; calls it historic, emotional moment

New Delhi [India], June 6 (ANI): Maharashtra Chief Minister Devendra Fadnavis on Friday announced the completion of the Hinduhrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg and stated that it was a historic and emotional moment. In a post on social media X, the CM wrote that the project was not just a road but a strong step towards a brighter future. 'A truly historic and emotional moment - the dream of a 'Samruddha' Maharashtra has come true! 'Hinduhrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg' is now complete --it's not just a road, but a strong step towards a brighter future. This was only possible because of the love and support of the people of Maharashtra!' the post read. On June 5, the CM had stated that the project would play an essential role in the development of the state and the highway would be a corridor of prosperity of the state. This highway will be connected to Vadhan Port shortly. Chief Minister Fadnavis said that land has been acquired for the Samruddhi Highway in record time. Due to this route, 24 districts of the state, including Vidarbha, Marathwada, and North Maharashtra, have been connected to JNPT port; now, this highway will be connected to Vadhan port. Rs 55 thousand 335 crore has been spent on this 701 km long highway. According to an official release, the 76-kilometre route of the Samruddhi Highway passes through Nashik and Thane districts. The Sahyadri mountain range in this area has made it a very difficult route for the Maharashtra State Road Development Corporation to overcome this engineering challenge. The tunnel near Igatpuri is eight kilometres long, the longest in the state, and the widest in the country. The Forest Department has decided to plant trees on the Palkhi route along the Samruddhi Highway. One thousand farm ponds have been created due to this highway. Along with this, water recharge arrangements have been made every 500 meters. (ANI)

Samruddhi highway, corridor of prosperity: Maharashtra CM Devendra Fadnavis
Samruddhi highway, corridor of prosperity: Maharashtra CM Devendra Fadnavis

India Gazette

timea day ago

  • India Gazette

Samruddhi highway, corridor of prosperity: Maharashtra CM Devendra Fadnavis

Nashik (Maharashtra) [India], June 5 (ANI): Maharashtra Chief Minister Devendra Fadnavis on Thursday said that the Hindu Hridaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg will play an essential role in the development of the state. This highway will be a corridor of prosperity for the state. This highway will be connected to Vadhan Port shortly, and CM Fadnavis added it. Chief Minister Fadnavis said that land has been acquired for the Samruddhi Highway in record time. Due to this route, 24 districts of the state, including Vidarbha, Marathwada, and North Maharashtra, have been connected to JNPT port; now, this highway will be connected to Vadhan port. Rs 55 thousand 335 crore has been spent on this 701 km long highway. According to an official release, the 76-kilometre route of the Samruddhi Highway passes through Nashik and Thane districts. The Sahyadri mountain range in this area has made it a very difficult route for the Maharashtra State Road Development Corporation to overcome this engineering challenge. The tunnel near Igatpuri is eight kilometres long, the longest in the state, and the widest in the country. The Forest Department has decided to plant trees on the Palkhi route along the Samruddhi Highway. One thousand farm ponds have been created due to this highway. Along with this, water recharge arrangements have been made every 500 meters. Solar energy will be generated along this highway, and work on a 35 MW project is underway. GAIL has laid a gas pipeline along the highway. Gas can be delivered to the newly developed Steel City Gadchiroli through this. Religious and tourist places are also connected through this route. Chief Minister Shri said the third bridge over Vashi Creek will help facilitate traffic. Fadnavis. Technology has been used to make the highway accident-free. One hundred structures have been created to prevent wildlife from moving on this highway. Such a structure has been built for the first time in the country. Due to this, the movement of wild animals is going on without interruption, said the Chief Minister. Shaktipeeth Highway will be built in the coming days. According to Fadnavis, this highway will help change Marathwada's economic picture. Deputy Chief Minister Shinde said that the Samruddhi Highway will save time, pollution, and fuel. This highway will boost agriculture, tourism development, and industrialisation. An environment-friendly highway will be a game changer in the state's development. He also expressed his belief that it will boost the development of the Nashik district. Samruddhi Highway will be beneficial for Marathwada, Western Maharashtra, and the Konkan region; similarly, Shaktipeeth Highway will be useful. Necessary basic facilities will be provided to the passengers on this highway. Deputy Chief Minister Eknath Shinde also appealed to drivers to follow the speed limit while driving. Wishing the World Environment Day, Deputy Chief Minister Pawar said that this year, a target of planting 10 crore saplings has been set for environmental conservation. After this highway, other projects in the state will also be accelerated, he said. Deputy Chief Minister Pawar praised the officers, employees, and workers who had worked hard on this project. On this occasion, officers and employees of the Maharashtra State Road Development Corporation, along with citizens, were present. Chief Minister Fadnavis held the inauguration of the final phase of Samruddhi Mahamarg and Thane Bay Bridge No. 3 South Channel on Sion Panvel Highway through a videoconferencing system. Deputy Chief Minister Eknath Shinde, Deputy Chief Minister Ajit Pawar, School Education Minister Dadaji Bhuse, and Public Works Minister Shivendrasinh Raje Bhosale were present at the occasion. (ANI)

CM targets planting 10cr saplings this yr to boost forest cover
CM targets planting 10cr saplings this yr to boost forest cover

Time of India

time2 days ago

  • Time of India

CM targets planting 10cr saplings this yr to boost forest cover

Mumbai: Chief minister Devendra Fadnavis on Wednesday set a target of planting 10 crore saplings in the current year to enhance the forest cover across the state. "We will have to launch a people's tree plantation movement to achieve the target of green Maharashtra in a time-bound period. Next year too, we will plant an equal number of saplings," Fadnavis said. He held a marathon meeting with senior bureaucrats, all divisional commissioners and collectors, on drafting a strategy for enhancing the forest cover. Additional chief secretary (forest) Milind Mhaiskar made an impressive presentation on the measures to be taken for enhancing forest cover in a time-bound period. While the current forest cover is 21.25%, additional 240 crore saplings will have to be planted to achieve the target of 33% forest cover. According to a senior bureaucrat, every department has been given a specific target, which will be completed before the ensuing monsoon. "We have set a target of 11 crore saplings. In view of our past experience, it should not be difficult to achieve the target," he said. The bureaucrat said earlier, it was found that acute shortage of labour, shortage of funds — from 2017-18 labour bills worth Rs 30 crore — have not been paid. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Promoções imperdíveis de voos baratos Voos | Anúncios de Pesquisa Saiba Mais Undo In several villages, resolutions have not been passed in the gram sabha. Labour from outside of the tehsil do not report for work. There is a delay on the part of the central government to release daily wages. Labours are reluctant to record attendance two times every day and above all, labours prefer non-governmental jobs. All of this has hit the tree plantation drive. The forest department has proposed massive tree plantations on both sides of the national highways and roads being constructed by state road development corporation. "If we have to achieve the target of 33% forest cover, then tree plantation should become a movement. For the 33% target, we will have to enhance our speed," said Fadnavis.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store