logo
Signal upgrading works cause major delays on Komuter and ETS routes

Signal upgrading works cause major delays on Komuter and ETS routes

Scores of passengers crowd KL Sentral following delays caused by KTMB's signal migration works that began on Friday. (X pic)
PETALING JAYA : Train services on several KTM Komuter and Electric Train Service (ETS) routes are experiencing major delays due to signal system migration works that began on May 30 and are continuing until tomorrow.
Keretapi Tanah Melayu Bhd (KTMB), in a statement today, said the delays affected KTM Komuter services on the Pulau Sebang (Tampin)-Batu Caves, Pulau Sebang-Tanjung Malim-KL Sentral routes, as well as ETS services.
Bernama said the signal migration works were being carried out between the Kepong and Salak Selatan stations to ensure a more efficient and safer signalling system.
KTMB said the works were part of Phase 1 of the Klang Valley Double Track (KVDT) infrastructure upgrade project.
KTMB chief operating officer Zain Mat Taha extended apologies to passengers affected by the delays.
Phase 1 of the KVDT project, which began in 2015, involved the rehabilitation of tracks and railway systems along the Rawang-Salak Selatan and Simpang Batu-Sentul routes, covering 110km.
Phase 2, covering a 140km stretch from Salak Selatan to Seremban, and Kuala Lumpur to Port Klang, commenced in February 2023 and is expected to be completed by 2029.
Since the start of the track rehabilitation and upgrade works, KTM Komuter services have been operating at 30-minute intervals, as only a single track is available in the affected sections under repair.
The upgraded, modern signalling system is expected to help reduce train service intervals.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Police: Kelantan's crime index up by 15.1pc in 2024, notable increases in rapes and theft
Police: Kelantan's crime index up by 15.1pc in 2024, notable increases in rapes and theft

Malay Mail

time20 minutes ago

  • Malay Mail

Police: Kelantan's crime index up by 15.1pc in 2024, notable increases in rapes and theft

KOTA BARU, June 4 — Kelantan recorded a 15.1 per cent rise in its crime index in 2024, driven mainly by increases in violent and property-related offences, according to state police chief Datuk Mohd Yusoff Mamat. He stated that a total of 2,296 cases were reported between January and December last year, up from 1,994 cases in 2023, representing an increase of 302 cases. Violent crime rose by 8.5 per cent from 390 to 423 cases, while property crime climbed 16.7 per cent from 1,604 to 1,872 cases, he added. 'Among the most concerning trends is the spike in rape cases, which rose 20.7 per cent, from 130 in 2023 to 157 cases last year,' said Mohd Yusoff during the 2025 Kelantan Police Chief Town Hall Discussion, themed 'Youth Awareness: Preventing Social Ills, Shaping the Future', held at Universiti Malaysia Kelantan. Armed robbery without firearms also increased by 25.6 per cent from 43 to 54 cases, while assault cases saw a more modest rise of 6.8 per cent from 147 to 157 cases. At the same time, several violent crimes recorded significant drops. Murder cases fell by 55.6 per cent from nine to four, and armed robbery involving firearms dropped 60 per cent from five to two instances. In the property crime category, theft remained the most significant contributor with 732 cases in 2024, up 50.9 per cent from 485 cases the previous year. House break-ins also rose sharply by 41.7 per cent with 628 cases, while car thefts increased by 23.3 per cent from nine to 12. However, motorcycle thefts declined significantly by 46.9 per cent from 128 cases in 2023 to 68 last year. — Bernama

Penang CM promises minimal traffic disruptions as major projects including LRT, PSI take shape
Penang CM promises minimal traffic disruptions as major projects including LRT, PSI take shape

Malay Mail

time24 minutes ago

  • Malay Mail

Penang CM promises minimal traffic disruptions as major projects including LRT, PSI take shape

EORGE TOWN, June 4 — The Penang state government has assured that effective traffic management strategies will be implemented to minimise disruptions during the construction of upcoming large-scale projects. Chief Minister Chow Kon Yeow said the projects including the Penang South Islands (PSI) project, the Mutiara Line Light Rail Transit (LRT) and the Juru-Sungai Dua Elevated Highway may cause temporary traffic congestion but it is a part of the development process. 'Many years ago when our team visited Gamuda in Kuala Lumpur, where they were at that time implementing the LRT project, we were introduced to the various traffic management strategies and a programme that they managed at that time during the construction phase. 'I believe all contractors appointed for this massive project in Penang will take note of traffic dispersal and the key consideration is to maintain the number of lanes during construction, despite having to take away certain parts of the roads away from the vehicles, additional space would have to be created so that the original number of lanes will be retained,' he said. Chow said this while responding to questions during the Malaysian International Chamber of Commerce and Industry (MICCI) Northern Annual Luncheon Dialogue 2025, here today and also attended by MICCI Northern Branch Chairman Datuk Brian Tan Guan Hooi together with 200 attendees from various industries and related sectors. With proper traffic management and patience from all road users, Chow is confident the state government will be able to mitigate and make travelling more comfortable despite the congestion. He also confirmed that the Penang LRT project is expected to begin in the third quarter of this year, with completion projected within six to seven years, while the Juru—Sungai Dua Elevated Highway is scheduled to commence by the end of the year. Prime Minister Datuk Seri Anwar Ibrahim in tabling Budget 2025 on October 18 last year, announced several projects in Penang, including the Juru—Sungai Dua Elevated Highway, Mutiara Line LRT, the expansion of Penang International Airport (LTAPP) and the Batu Kawan Industrial Park 3 project. The 29.5-kilometre Mutiara Line LRT will feature 21 strategically located stations and is designed to enhance connectivity between Penang Island and the mainland, reduce road congestion, and improve overall accessibility. Meanwhile, Chow also noted that the state-led PSI project continues to make progress with some 60.71 hectares of land already reclaimed over the past 18 months. He said the state government is awaiting 'good news' from the federal government regarding the incentive packages for potential purchasers of the land for industrial development. PSI or Silicon Island, with a land area of 930.78 hectares, is a reclamation project owned by the Penang government. — Bernama

Transport minister: CCTV suggests Taiwanese national's fall at Puchong LRT station was accidental, police to investigate
Transport minister: CCTV suggests Taiwanese national's fall at Puchong LRT station was accidental, police to investigate

Malay Mail

time38 minutes ago

  • Malay Mail

Transport minister: CCTV suggests Taiwanese national's fall at Puchong LRT station was accidental, police to investigate

PUTRAJAYA, June 4 — Transport Minister Anthony Loke said today a closed-circuit television recording showing a Taiwanese national falling onto the Puchong LRT station track yesterday indicated it was an accident, and the matter is now under police investigation. 'A report was presented by Prasarana yesterday and it was an accident whereby the person may have not been aware about the platform and the incident was captured on CCTV,' Loke said at a press conference here. 'So we know that it was an accident but let the police do their investigation. The CCTV recording will be shared with the police so they can conduct a detailed probe.' MORE TO COME

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store