logo
MHADA invites tenders for cluster redevelopment of Kamathipura in South Mumbai

MHADA invites tenders for cluster redevelopment of Kamathipura in South Mumbai

Time of India13-06-2025
NEW DELHI: The
Mumbai Building Repairs and Reconstruction Board
, a unit of
MHADA
, will undertake the cluster redevelopment of the Kamathipura, South
Mumbai
.
A tender for the appointment of a construction and development agency for this project was issued on June 12.
The redevelopment of dilapidated cessed and non-cess buildings and plots in lanes numbered 1 to 15 in Kamathipura will be carried out in an integrated manner under Regulation 33(9) of the Development Control and Promotion Regulations (DCPR) 2034 through the Mumbai Building Repairs and Reconstruction Board.
The Kamathipura area, spread across 34 acres in South Mumbai, includes approximately 943 cess buildings in lanes 1 to 15, with around 6625 residential and 1376 non-residential tenants/residents, totaling 8,001. There are about 800 landowners in the area.
The buildings in this region are approximately 100 years old. The total net plot area of this region is approximately 73,144.84 sq meters. This project will provide permanent and rightful homes to 8001 tenants/residents who have been awaiting redevelopment for many years.
Through this initiative, residents will receive larger and safer homes along with well-planned infrastructure facilities. The project will also include commercial buildings and recreational grounds.
Additionally, through this project, 44,000 sq meters of land will be made available to MHADA through the selected bidder, resulting in a significant increase in the housing stock. The developer will receive 5,67,000 sq meters of development rights where housing stock of approximately 4,500 new housing units are expected to be constructed.
One housing unit of 500 sq ft area will be provided for land plots measuring up to 50 sq mete, two such units for plots measuring between 51 sq meter and 100 sq meter, three units for plots between 101 sq meter and 150 sq meter, four units for plots between 151 sq meter and 200 sq meter, and for every additional 50 sq meter beyond 200 sq meter, one additional unit of 500 sq ft will be provided to the landowners.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

From 160 Sq Ft To Sky-Rise: Over 500 Mumbai Chawl Families Get New Redeveloped Flats
From 160 Sq Ft To Sky-Rise: Over 500 Mumbai Chawl Families Get New Redeveloped Flats

News18

timea day ago

  • News18

From 160 Sq Ft To Sky-Rise: Over 500 Mumbai Chawl Families Get New Redeveloped Flats

Last Updated: Devendra Fadnavis inaugurates Worli BDD Chawl Redevelopment Project, providing 556 families with new high-rise apartments. Maharashtra Chief Minister Devendra Fadnavis on Thursday inaugurated the first phase of the Worli BDD Chawl Redevelopment Project as 556 families got possession of their 500-sq ft high-rise apartments. The key distribution ceremony took place in Mumbai in the presence of CM Fadnavis, Deputy Chief Ministers Eknath Shinde and Ajit Pawar, and other ministers and top officers. The phase of Worli BDD Chawl Redevelopment Project, carried out by Tata Housing in partnership with the Maharashtra Housing and Area Development Authority (MHADA), includes two completed towers of 40 floors each. The first phase covers residents from D and E wings of Building No. 01. Currently, 9,689 residents from 121 old chawls in Worli are set to be rehabilitated, with 65 per cent of the total land earmarked for this purpose, as per the report by India Today. The Bombay Development Department (BDD) chawl redevelopment — covering Worli, Naigaum in Dadar, and NM Joshi Marg — will transform the dilapidated structures into a modern urban habitat with 33 high-rise towers of 40 floors each. Once complete, 15,593 families will move from 160-sq ft homes to 500-sq ft apartments. The project, estimated at over Rs 17,000 crore, will create a self-contained township with facilities such as a commercial complex, schools, hospitals, gyms, hostels, and sustainable infrastructure including sewage treatment plants, solar energy systems and rainwater harvesting. MHADA will maintain the rehabilitated buildings for the next 12 years. Some historical sites within the BDD areas such as Jamboree Maidan and Ambedkar Maidan, will not be touched, but one of the original chawl buildings will be left intact and turned into a museum to preserve the heritage of BDD chawls that were built during the British era. The Bombay Development Department was set up by Sir George Lloyd, then Governor of Bombay Province, to tackle housing shortages amid rapid industrial growth. In 1937, Mahatma Gandhi spent a night with the Mehtar Samaj (sweepers) here. Dr BR Ambedkar, architect of the Indian Constitution, was also a frequent visitor. view comments First Published: August 15, 2025, 23:21 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

550 Mumbai chawl families receive keys of new redeveloped spacious apartments
550 Mumbai chawl families receive keys of new redeveloped spacious apartments

India Today

time2 days ago

  • India Today

550 Mumbai chawl families receive keys of new redeveloped spacious apartments

Mumbai's century-old Worli BDD chawls saw a major shift on Thursday as 556 families received keys to their new 500-sq ft high-rise apartments under the long-pending redevelopment project. Residents are moving from cramped 180-sq ft rooms to modern 2-BHK homes, some offering sea redevelopment, carried out by Tata Housing in partnership with the Maharashtra Housing and Area Development Authority (MHADA), includes two completed towers of 40 floors each, with work on other buildings larger Bombay Development Department (BDD) chawl redevelopment — covering Worli, Naigaum in Dadar, and NM Joshi Marg — is estimated at over Rs 17,000 crore. Once complete, 15,593 families will transition from 160-sq ft homes to 500-sq ft apartments. Amenities in the new towers include a rainwater harvesting system, rooftop solar panels, automatic corridor light sensors, and planned parking month, residents were given a preview of "tower life" during an orientation session, which included guidelines such as not storing footwear or belongings in many, the day was the fulfilment of a decades-long wait. Ravindra Mayekar, 58, whose 75-year-old mother is among the beneficiaries, said, "We have been waiting for this house to be completed for years. It's a dream come true. People should stay in these houses and not sell them to others. This is gold which we should leave for our next generation".Others, still awaiting possession, expressed mixed feelings. Stayawan Bankar, who lives in an old building next to the construction site, said, "Construction is ongoing next to our building. Due to this, mosquito infestation has increased. Last year my daughter was admitted to the hospital twice. My dream of having a family is complete, now waiting for the dream of a house to be completed".For the Kulkarni family, Thursday was an emotional milestone. "It's my grandmother's deeds that we have got this house today. Since I was growing up I have been hearing that Worli BDD will be redeveloped. To see it happening is a dream come true. My family plans to stay here," said 22-year-old Varad to local property agent Santosh Singh, Worli's real estate rates range from Rs 60,000 per sq ft for regular flats to Rs 1.25 lakh for luxury units."In case of Worli BDD, because it's a redeveloped building, it will cost around Rs 30,000 to Rs 40,000 per sq ft even if made well. So the costing will be at Rs 2 crores per flat as a middle-class person can't pay more than," he the new homeowners, the move marks the beginning of a new chapter — one that transforms a 100-year-old community into a modern vertical neighborhood.- Ends IN THIS STORY#Mumbai

Mumbai's East–West road link realised after 2 decades with SCLR extension
Mumbai's East–West road link realised after 2 decades with SCLR extension

Indian Express

time2 days ago

  • Indian Express

Mumbai's East–West road link realised after 2 decades with SCLR extension

Nearly 22 years after the idea was first proposed and almost Rs 1,000 crore spent, Mumbai's urban planners are finally seeing the realisation of a long-standing vision of a partly elevated road that connects the city's two lifelines, the Eastern Express Highway (EEH) and the Western Express Highway (WEH). On Thursday, the last leg of the Santa Cruz Chembur Link Road (SCLR) project, featuring Asia's first curved cable-stayed bridge, was inaugurated, promising seamless, signal-free connectivity between the two Express Highways. However, with an expense of around ₹1,000 crore and years of delays, experts warn that instead of solving Mumbai's traffic woes, the extension may move the problem further down the road. The evolution of the Santacruz-Chembur Link Road (SCLR) In the 1990s, when Mumbai's transport infrastructure was almost entirely north-south oriented, city planners envisioned a series of east-west link roads to break this rigid travel pattern. Among them was the SCLR, aimed at easing connectivity between the city's two arterial roads, EEH and the WEH. Before SCLR and other link roads, commuters travelling to and from western suburbs to eastern suburbs or Navi Mumbai had to rely on longer, congested routes such as Jogeshwari-Vikhroli Link Road, Andheri-Kurla Road, or take a detour from Sion with journeys that could take up to 90 minutes to two hours during peak hours. To address this, a 6.5 km SCLR was commissioned in 2003 under the World Bank-funded Mumbai Urban Transport Project, with a budget of Rs 115 crore and a projected completion date of November 2004. However, work was severely delayed due to issues with the rehabilitation of project-affected residents, particularly occupants of 13 Maharashtra Housing and Area Development Authority (MHADA) buildings. Besides, constructing the road over busy railway lines proved to be a major logistical hurdle. A 560-metre flyover over LBS Marg was opened to the public on August 10, 2012, nine years after the project was initiated. The entire stretch finally became operational in April 2014, with the cost having quadrupled to Rs 450 crore. In its complete form, SCLR connects Dr Hans Bhugra Junction in Santacruz East to Amar Mahal Junction near the EEH, skirting Mumbai University's Vidyanagari Campus, crossing Mithi River, LBS Marg, and passing near Lokmanya Tilak Terminus. Why was the SCLR extension needed? While the original SCLR was built to provide East-West connectivity, it fell short of directly reaching the WEH, ending instead near Hans Bhugra Marg, far from efficient traffic dispersal points. The rise of Bandra-Kurla Complex (BKC) as a commercial hub worsened the traffic situation, leading to severe gridlocks near Vakola Junction and Hans Bhugra Marg. To address this, the Mumbai Metropolitan Region Development Authority (MMRDA) launched the SCLR Extension project in 2016: as a 5.4 km elevated corridor from Kapadia Nagar near CST Road (Kurla) with a landing directly on the Western Express Highway close to Panbai International School, at an initial estimated cost of Rs 450 crore. The project, originally expected to be completed in three years, also faced delays. In February 2023, a 3 km two-lane bridge was opened. However, the most complex component extending to 1.66 km was inaugurated on Thursday. It includes the final 215-metre-long cable-stayed bridge. This unique bridge rises 25 metres above the WEH and features a 100-metre sharp curvature, making it Asia's first of its kind. It bypasses the congested Vakola Junction, allowing vehicles to reach the WEH directly, offering a signal-free ride between EEH and WEH. The cost spiralled to Rs 650 crore. Will it bring relief to commuters? The inauguration of the final phase is expected to provide major relief to commuters, especially during peak hours. However, experts are cautious about celebrating too soon. The previous experience with SCLR shows that each new link often shifts the bottleneck rather than resolving it. Transport expert Ashok Datar voiced skepticism about long-term benefits. 'There is a saying that instead of trying to cover the world with leather, one should wear leather shoes. SCLR's extension is an attempt to cover the world in leather. All that is being done is that a congestion point is being pushed further ahead of the road. How many extensions will you do while ignoring easier and cheaper solutions like having dedicated bus corridors on Mumbai's roads? That is a far cheaper option than building such roads,' Datar said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store