logo
Community drug projects welcome Government funding of €1.9m for addiction treatment services

Community drug projects welcome Government funding of €1.9m for addiction treatment services

Irish Examiner25-04-2025
Community drug projects have welcomed Government funding of almost €1.9m over a three-year period to assist in the 'essential life-saving' work carried out by local organisations.
The monies will be allocated across six health regions and are focused on increasing drug treatment in local areas.
Minister for the national drugs strategy Jennifer Murnane O'Connor said the allocation of €1.89m was being made available through the Community Services Enhancement Fund.
'This funding represents another practical step in our efforts to strengthen the health-led response to drug use by enhancing access and delivery of drug services in the community, in line with the national drugs strategy,' she said.
'The six HSE health regions will each receive between €252,000 and €378,000 per year, with allocations based on population needs.'
The minister of state at the Department of Health said by making drug treatment available as part of primary care, the State was helping to 'reduce stigma of drug use' and meet the needs of those presenting.
Ms Murnane O'Connor said the programme for government committed to increase funding for drug addiction services, including local drug and alcohol taskforces.
She said the funding also aligned with the report of the Citizens' Assembly on Drugs Use, which reported in January 2024.
HSE clinical lead for addiction services Professor Eamon Keenan welcomed the announcement: 'This funding will enhance the delivery of drug and alcohol community services in the newly established HSE health regions across the country.
"This will allow evidence-based interventions to be provided in those areas of most need and these initiatives will be subject to measurements of outcomes, thus ensuring that the identified service need is met.'
The funding will be allocated on three-year cycle, with ongoing monitoring and evaluation.
The National Drug Treatment Reporting System (NDTRS), published by the Health Research Board, shows there were 13,104 cases in 2023, which is an increase of almost 50% from 8,922 in 2017.
Anna Quigley, coordinator of Citywide, a national group representing community drug projects, said: 'Citywide welcomes any additional funding that is made available for the essential life-saving work that is carried out by community drug projects across the country.
'There is very little recognition of the range and extent of the work they do on a daily basis, not only to support people who are using drugs, also their families and the wider community — our communities would be devastated without them.'
Ms Quigley added: 'However, we would emphasise the importance for the projects of having secure long-term funding that can be depended on and it is essential that the next national drugs strategy commits to putting this secure funding in place on a muti-annual basis.
'It is not acceptable that so many of our essential local services face into each new year with insecurity around funding levels and the resulting difficulties in planning ahead and recruiting staff.'
Read More
Opioid addiction three times higher in Dublin than the rest of Ireland, new study finds
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Our children bear the scars of Simon Harris's broken promises on scoliosis surgery
Our children bear the scars of Simon Harris's broken promises on scoliosis surgery

Irish Examiner

time15 hours ago

  • Irish Examiner

Our children bear the scars of Simon Harris's broken promises on scoliosis surgery

It was 1pm when my six-year-old son Darragh looked at me and said: 'I have a really long day ahead of me, Mammy.' Most children that age say things like this when they are waiting for something exciting. For Darragh, it meant something else entirely. It was his way of telling me that the exhaustion and discomfort in his small body felt endless. This was during his first wait for scoliosis surgery. During that time, I watched my child's health unravel. Darragh became cachectic, a level of wasting usually seen in end-stage cancer. He was so underweight he no longer appeared on the children's growth charts. His curved spine was crushing his stomach, leaving him unable to eat enough to keep up with the calories he was burning just to survive. His body was working overtime simply to keep him alive. Scoliosis is not just a curve in the spine. It can affect every system in the body — lungs, heart, digestion, mobility. I learned this not from a textbook but from the daily reality of caring for my son. Washing his little body in the shower, I thought to myself: if I failed to care for him in the way the HSE was failing him, I would be in jail. Claire Cahill: We have seen every squandered opportunity, every cycle of promises and excuses, every resource wasted while children's conditions worsened. Picture: Conor Ó Mearáin/Collins We are not new to this fight. For 10 years, we have campaigned for better — for my child and for others. We have seen every squandered opportunity, every cycle of promises and excuses, every resource wasted while children's conditions worsened. In 2015, Darragh was placed on his first waiting list for surgery. In 2017, Darragh's story reached national television through RTÉ's Living on the List. Families like ours shared the suffering, the deterioration, the impossible waits. The country reacted with outrage. That same year, scoliosis delays were officially recognised by the Ombudsman for Children as a breach of children's rights. Then minister for health, Simon Harris stood in front of cameras and promised that no child would wait more than four months for surgery. We believed him. We believed change was coming. But in 2018, an outsourcing plan that could have helped clear the backlog failed. Sixty operations were tendered for, only 28 completed. Once again, precious resources were squandered through mismanagement, with consequences for children who were left to deteriorate. Now, in the most recent outsourcing effort, we are watching the same mistakes play out all over again — another cycle of lost opportunity and unnecessary harm. Only four surgeries have been completed this year, despite waiting lists continuing to grow. In 2023, the scandal took a darker turn. We learned of children being implanted with non-medical-grade devices and infection rates that were off the scale. The Ivy Report from the Ombudsman for Children told of a teenager who waited five years for spinal fusion, during which her curve worsened from 30 to over 135 degrees. Born with cerebral palsy, she suffered severe physical and mental decline while repeated concerns to her GP, consultant, and CHI went unanswered. The report showed how maladministration led to poor outcomes, a stark example of systemic failure that has cost children their health, and in some cases their lives. In 2024, the Spinal Management Unit was established, supposedly to improve communication with parents. Yet it consists of the same people, rotating chairs on the Titanic. My experience tells a different story from the promises. My son's July out-patient appointment was cancelled and we were never informed. Parents are expected to be mind-readers in a system that can barely manage the basics. A taskforce also exists, but not a single parent of a child currently in CHI has taken a seat, such is the depth of the mistrust. Why are we funding taskforces and management units that do not work? Children still waiting Today, in 2025, children are still waiting. My own son is once again back on a 'semi-urgent' waiting list, which is supposed to mean surgery within 13 weeks. He has been on that list since November 14, 2024. As I write this, it is now 39 weeks later — three times the promised timeframe. In April, we were told there was no date and no timeframe for surgery. For children like Darragh, semi-urgent means living with a spine that continues to curve because scoliosis does not wait for the system to catch up. For many children with congenital or early-onset scoliosis, surgery is not a one-off operation. They spend their entire childhoods on waiting lists, moving from one delay to the next. Each postponement causes further deterioration. Every lost month increases the risk of more invasive procedures, more pain, and poorer outcomes. Parents have been shouting out for years, warning of the grave danger to our children and the mismanagement of care and resources in CHI. We have presented evidence, told our children's stories, and pleaded for timely intervention. Our calls fell on deaf ears. What must happen now is beyond debate. CHI cannot be trusted to lead scoliosis services any longer. An independent inquiry is needed, along with external oversight of how every euro is spent. Time and again, they have shown themselves incapable of delivering safe, timely care. While they mismanaged resources, our children kept waiting for wheelchairs, for appointments, for surgery, and some waited so long that the chance for help was lost forever. Simon Harris will always be associated with that four-month promise because he has never delivered on it. The consequences of that broken promise are written in the physical and emotional scars our children carry. This is not about political point-scoring. A minister can publicly promise something that is the standard in other countries, fail to meet it year after year, and still go on to lead the Government. In the meantime, hundreds of children like Darragh remain in limbo, paying the price in lost mobility, worsening curves, and years stolen from childhoods. We do not need new targets that will be quietly forgotten. We need action on the promises already made. We need leadership that understands that 'urgent' means today, not next year. Under Simon Harris's watch, children have shouldered the life-altering consequences of delayed care, while he emerges politically unscathed. Out of respect for every child who has suffered or lost their childhood to these delays, he must now face his own consequences and step down. Every delay robs a piece of childhood that no surgery can restore.

Increasing use of agency staff by HSE for care of older people 'a healthcare risk', advocates warns
Increasing use of agency staff by HSE for care of older people 'a healthcare risk', advocates warns

Irish Examiner

time21 hours ago

  • Irish Examiner

Increasing use of agency staff by HSE for care of older people 'a healthcare risk', advocates warns

A doubling of agency staff use for older people's services by the HSE is a healthcare risk and the "canary in the coalmine", warning of serious problems, Age Action has warned. It follows a report in the Irish Examiner showing money paid to agencies in this sector almost doubled from €64.5m to €118.9m last year. Despite pledges to rein this in, it reached €52.1m spent already by May. Camille Loftus, head of advocacy and public affairs with Age Action, said she was disturbed but not surprised by the findings. 'A reliance on agency staff in healthcare services is a healthcare risk,' she said. If you look at instances where there have been errors, failure in care, medical misadventure, you will find very frequently that the use of agency staff was a factor. She stressed this was not because temporary workers might not be qualified, but 'it does mean they are not familiar with the healthcare setting in which they're working'. She suggested if a nursing home or homecare service was short-staffed enough to need agency help, they were unlikely to have time to offer thorough training on the day. 'If you can see a pattern where a sector in the health service is heavily staffed by people who are not full-time employed, that is an indication of a problem and it is absolutely a risk,' she said. Low salaries are common in social care for older people, especially in nursing homes, she added. 'We saw the kind of failures that can occur when a provider is consistently understaffed in that RTÉ Investigates programme on nursing homes,' she said. 'At least part of that problem was persistent understaffing. You will remember that horrific scene of that woman standing there with a man desperate to use the bathroom, and she knowing she couldn't leave over 20 people unattended — that's an understaffing problem.' Undercover footage shot at two homes run by Emeis Ireland was shared by RTÉ in June to widespread outrage. In general, Ms Loftus said: 'When you're dealing with residents where dementia might be an issue, a constant turnover of staff where people don't know residents' preferences is worrying. It's risky, it makes it more likely something will go wrong for the patient. The pressures are only likely to continue, with the projected rise in people living longer. She raised concerns about how this is being managed by the HSE and Government. 'The agency staffing numbers are like a canary in the coalmine, it's a warning to us that in this system — which we all think is creaking at the seams — that those fissures are becoming critical now,' she said. The HSE said agency staff were used to cover holidays, sick leave or maternity leave, as well as when short-staffed. It acknowledged recruitment as a challenge, saying this was the case for health services worldwide now. The data was released by the HSE to Sinn Féin health spokesman David Cullinane. He criticised the HSE's staff policy — pay and numbers strategy — as ineffective, calling for 'an ambitious and realistic workforce plan'.

Do Not Swim notices issued for two popular Wexford beaches due to high levels of bacteria
Do Not Swim notices issued for two popular Wexford beaches due to high levels of bacteria

Irish Independent

timea day ago

  • Irish Independent

Do Not Swim notices issued for two popular Wexford beaches due to high levels of bacteria

The latest sampling conducted as part of the Council's normal monitoring of bathing water quality, showed elevated levels of bacteria at the beach. Following consultation with the HSE, it is necessary to issue 'Do not swim' warning notices at the above beaches in accordance with the Bathing Water Quality Regulations 2008 and in the interest of public health. Further samples have been taken, and results are expected on Saturday, August 16, 2025 at which stage the bathing prohibition notices will be reviewed. In addition, the Council's Environmental Technical Team are investigating the matter. The Do Not Swim notices have been posted at Rosslare Strand and Ballyhealy beaches. Bathing water quality results for 19 Wexford beaches sampled over the 2025 to date bathing season, have been mainly excellent as published on the EPA operated website Wexford County Council advises members of the public visiting the above beach to 'please abide by the public notices advising against swimming.' Further updates will be issued through the media and via the Council's website and more information on bathing water quality can be obtained on

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store