Durban's R1. 75 billion strategy to revolutionise solid waste management
Image: File
The eThekwini Municipality's Cleansing and Solid Waste (CSW) unit reported that it was at a critical inflection point and is now developing a turnaround strategy for it.
This strategy is expected to cost approximately R1.75 billion over 10 years, with funding mobilised through reprioritisation, cost optimisation, and leveraging national reform-linked grants, the municipality stated in a report to the eThekwini Municipality Executive Committee (EXCO) recently.
The CSW reported that mounting financial deficits, declining infrastructure reliability, and growing service delivery backlogs have rendered the current solid waste business model unsustainable.
The municipality stated that the turnaround strategy for the CSW was developed in alignment with the National Treasury's Metro Trading Services Reform (MTSR) framework.
This is expected to transform CSW into a performance-driven, financially viable, and environmentally resilient municipal trading service with a single point of management accountability.
Video Player is loading.
Play Video
Play
Unmute
Current Time
0:00
/
Duration
-:-
Loaded :
0%
Stream Type LIVE
Seek to live, currently behind live
LIVE
Remaining Time
-
0:00
This is a modal window.
Beginning of dialog window. Escape will cancel and close the window.
Text Color White Black Red Green Blue Yellow Magenta Cyan
Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan
Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan
Transparency Transparent Semi-Transparent Opaque
Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps
Reset
restore all settings to the default values Done
Close Modal Dialog
End of dialog window.
Advertisement
Next
Stay
Close ✕
Ad loading
The strategy identifies a clear trajectory for reform under the three-phase national model: stabilise, recover, and transform.
The municipality explained in the report that the initial phase targets operational recovery and institutional clarity, while subsequent phases focus on cost-efficiency, financial sustainability, circular economy readiness, and customer trust.
The municipality has found that the current waste service value chain is highly linear, with over 98% of waste landfilled and minimal diversion. Other findings were: The CSW's average Operating Cost Coverage Ratio (OCCR) is 0.71, significantly below the sustainability threshold of 1.2. This indicates structural revenue shortfalls from high operational costs relative to tariffs.
Landfill closures and aging fleet infrastructure are driving up the city's three major cost centres: overtime, maintenance, and fleet hire.
Informal settlements and dense urban nodes remain underserviced, exacerbating illegal dumping and public health risks.
Data fragmentation, weak asset management systems, and outdated tariff models impair cost recovery and operational optimisation.
Institutional form lacks a single point of accountability, leading to fragmented leadership,
diluted performance, poor consequence management, and misalignment of the shift system versus the standard of services.
According to the municipality, the strategy introduces seven strategic focus areas (SFAs), each aligned with specific goals and causes of underperformance. They are: Single Point of Accountability (SPoMA) - Establish a dedicated, ringfenced utility structure for CSW with clear leadership and delegated authority.
Fleet and logistics optimisation - Renew and optimise fleet through predictive maintenance.
Route planning software and pooled vehicle reserves.
Financial sustainability and ringfencing - Introduce activity-based costing, tariff reform, and revenue protection measures.
Circular economy and diversion pathways - Expand recycling, establish MRFs, and integrate informal waste pickers to reduce landfill dependence.
Data and information systems - Deploy an integrated waste information system to drive evidence-based decision-making.
Environmental risk and compliance - Modernise landfill infrastructure and implement leachate and gas management to reduce environmental liabilities.
Customer engagement and trust - Improve service transparency, complaint resolution, and
community education to restore public confidence.
The municipality has a 10-year implementation roadmap embedded within the strategy, comprising 34 phased projects mapped to the strategically focused areas. Stabilise (Years 1-2): Core service restoration, institutional reform, data infrastructure, and financial diagnostics.
Recover (Years 3-6): Fleet replacement, tariff reform, separation-at-source expansion, and customer engagement rollout.
Transform (Years 7-10): Circular economy scaling, full system digitisation, and integrated
asset management.
The municipality stated that the strategy marks a decisive shift toward a professionally managed, financially sustainable, and socially accountable solid waste utility.
By executing this roadmap, the eThekwini CSW will address its service delivery backlogs, strengthen institutional capacity, and re-establish public trust-delivering universal, reliable, and future-ready waste services for all residents.
zainul.dawood@inl.co.za
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

IOL News
3 hours ago
- IOL News
SARS Commissioner Edward Kieswetter Begins Exit Talks as End of Term Approaches
SARS Commissioner Edward Kieswetter's tenure has been defined by efforts to restore efficiency, transparency and public credibility. A strong emphasis was placed on modernising operations and improving compliance levels across sectors. South African Revenue Service (SARS) Commissioner Edward Kieswetter has entered discussions regarding his departure from the organisation, with preparations now underway for a leadership transition once his current term concludes. Kieswetter was first appointed to head the revenue service in 2019. In 2023, President Cyril Ramaphosa extended his tenure by an additional two years. This decision came before the completion of his original five-year term and was widely viewed as a vote of confidence in his leadership. At the time of his appointment, Kieswetter faced the challenge of rebuilding public trust and organisational capacity at SARS, following a turbulent period marked by serious institutional decline. His predecessor, Tom Moyane, presided over an era often associated with the weakening of the institution during the height of State Capture. During that time, SARS experienced significant operational setbacks, a loss of skilled professionals, and declining morale among Kieswetter's leadership, SARS has seen notable improvements in revenue collection and governance. His tenure has been defined by efforts to restore efficiency, transparency and public credibility. A strong emphasis was placed on modernising operations and improving compliance levels across sectors. One of the major achievements during Kieswetter's time in office was the recovery of billions in unpaid taxes, with the agency reporting collection figures that surpassed expectations in several financial years. He has consistently attributed these outcomes to the commitment of SARS employees, as well as the strategic use of data and these successes, the path forward remains complex. The process of identifying a successor who can maintain the momentum of reform will be closely watched by stakeholders both within government and in the broader financial sector. Ensuring that the transition is managed carefully is seen as critical for sustaining investor confidence and tax compliance. The National Treasury and the Presidency are expected to play key roles in shaping the next phase of leadership at SARS. While no official announcement has been made regarding potential candidates, the internal planning suggests that the leadership change is being treated with significant has not publicly commented in detail on his plans following his departure, but sources close to the matter suggest he is committed to a smooth handover and continued support for the institution during the transition period. With the end of his extended term approaching, the focus now shifts to how SARS will navigate this leadership change while maintaining its recent progress in restoring the integrity and capability of the national tax authority.

IOL News
2 days ago
- IOL News
eThekwini Municipality leads South Africa's energy transition with new electricity generation capacity
The Minister of Electricity and Energy, Dr Kgosientsho Ramokgopa, and eThekwini Mayor Cyril Xaba at the eThekwini Landfill Gas-to-Electricity project site in Durban. From left, eThekwini City Manager Musa Mbhele and far right, eThekwini Councillor Thembo Ntuli. Image: Zainul Dawood New electricity generation was on top of the cards for eThekwini Municipality on Friday. The Minister of Electricity and Energy, Dr Kgosientsho Ramokgopa, joined by the Mayor of eThekwini, Councillor Cyril Xaba, spoke about the outcome of the municipality's Section 34 application. Xaba said that a Section 34 Ministerial Determination is a crucial mechanism that empowers municipalities to procure new generation capacity to meet specific energy needs and enhance energy security. City officials and Ramokgopa also inspected the waste-to-energy plant in Springfield, Durban, that is owned by the municipality, highlighting the municipality's commitment to innovative and sustainable energy. Xaba regarded it as a historic announcement that marked a critical milestone in the eThekwini energy strategic roadmap, which seeks to enhance energy security by diversifying energy sources and reducing reliance on the national grid. 'We are not only celebrating the decision by the Minister of Electricity and Energy to authorise the city to develop new electricity generation capacity, but we are also affirming our commitment to lead South Africa's energy transition in a way that is secure, inclusive, and sustainable,' Xaba said He added that eThekwini was the first metro in the country to receive this determination to procure new electricity generation capacity directly from Independent Power Producers (IPPs). According to Xaba, this is a precedent-setting moment that reinforces the constitutional role of municipalities in ensuring they deliver quality services. Detailing the history behind it, Xaba said that in 2021, eThekwini responded to the national energy crisis and initiated its electricity procurement programme through the Municipal Independent Power Producer Procurement Programme (MPPPP). He said this decision was driven not only by necessity, but by a forward-looking vision of building a decentralised, diversified, and resilient municipal energy system. By July 2021, eThekwini issued a technology-agnostic Request for Information (RFI) to the market, targeting 400 megawatt (MW) of renewable energy. This move allowed eThekwini to engage industry stakeholders, assess investment appetite, and lay the groundwork for meaningful public-private partnerships. A year later, the municipality's 400 MW business case received full endorsement from the KwaZulu-Natal provincial government. Subsequently, the National Treasury approved the project, positioning eThekwini as a national pioneer in municipal-led power procurement. In 2023, the municipality convened the first Energy Transformation Summit and submitted a Section 34 Determination application, which received the full attention of Ramokgopa. By October 2024, Ramokgopa issued the draft Section 34 determination to NERSA, which launched public participation in March 2025. On Friday, the final approval of the Ministerial Determination gave the green light to move to the next phase of the Request for Proposals (RFP). The RFP for Solar PV will be issued in December 2025, with the construction expected by September 2027. Xaba said that the Gas-to-Power RFP will follow in 2026. He explained that this programme will allow eThekwini Municipality to procure 400 MW of new generation capacity - 100 MW Solar PV and 300 MW Gas to Power (GTP), with a focus on dispatchable, reliable, and low-carbon energy technologies. Our energy mix is clearly articulated in our Integrated Development Plan (IDP). [email protected] The Landfill Gas-to-Electricity project site in Springfield, Durban. Image: Zainul Dawood


Eyewitness News
2 days ago
- Eyewitness News
Morero says political instability to blame for Joburg's financial woes
JOHANNESBURG - Joburg mayor Dada Morero says political instability is partly to blame for the city's poor financial management. The finance minister recently wrote a scathing letter to Morero, threatening to cut off National Treasury funding if the city does not curb its excessive unauthorised, irregular, and wasteful expenditure. ALSO READ: Gauteng govt confident City of Joburg will host successful G20 Summit Since the 2021 local government elections, Johannesburg has had four different mayors, each with their own administration. In an interview with EWN , Morero said things are expected to improve now that the city has a stable coalition government. "We have also responded to the minister to say yes, the plans have always been there, except that there have been some weaknesses in implementation. For example, it took us longer to appoint a disciplinary committee, which we have now appointed and this was a result of change and instability of government, where you had changes that were happening constantly. Now that we have got a stable coalition, we are able to establish the disciplinary committee.'