logo
Washington could be losing money as some drivers have been swinging free rides on SR 167 for years

Washington could be losing money as some drivers have been swinging free rides on SR 167 for years

Yahoo19-03-2025

The state may be losing millions of dollars because some drivers are getting a free ride on SR 167.
This is as we, too, learn for the first time — some HOT lane drivers are riding for free!
The HOT lanes on SR 167 are free if you don't have a Good to Go! transponder. That was news to us until today's monthly meeting of the Washington State Transportation Commission.
That's when we found out there are no license plate readers to force those drivers to pay the toll.
In fact, none of the drivers we talked to knew about this. With no license plate reader, those who don't have a transponder — aren't paying at all.
Some drivers in the HOT lanes on SR 167 are driving entirely for free.
Katelynne Lee of Eatonville says she has never gotten a bill, 'not for 167.' She said she did not know why.
In fact, KIRO 7 just uncovered it. Drivers don't need a passenger to avoid the toll in the HOT lanes if they don't have the Good to Go! transponder.
It was news to Marcellis Pipkin, too. He says he never pays a toll on SR 167 because he never drives in the HOT lanes since he is usually 'by myself.'
He was asked if he knew he could drive in the HOT lanes. 'By myself?' he asked. He confirmed he doesn't have a transponder so, there is no way to read his license plate. 'Oh,' replied Pipkin.
This came to light as the Washington State Transportation Commission was holding its monthly meeting. Most of the meeting was devoted to the toll rates that are increasing across King County and parts of Pierce County, but there was also a portion of the meeting dedicated to the plan to install license plate reading technology on SR 167, something that it has apparently never had in the seven years the state has been collecting tolls. That means there is no pay by mail.
Carl See, WTSC deputy director, was asked if they know how much money the state is losing.
'I'd have to refer you to WSDOT on that to talk about those kind of things,' See said. 'But it certainly is a problem with leakage, evasion... however you want to talk about that.'
Maybe so, but it was music to the ears of the drivers we talked to.
'I'm not mad at not paying,' said Pipkin, laughing. 'I'm not complaining about free.'
You could still get into trouble. The Washington State Patrol is supposed to enforce the law on this roadway, when they are here anyway.
We called the Washington State Department of Transportation (WSDOT) to follow up on this, but they told us they don't have that data right at hand.
So, we'll keep pushing until we get the answers.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Restoring access to this part of Mount Rainier could cost up to $785 million
Restoring access to this part of Mount Rainier could cost up to $785 million

Yahoo

time13 hours ago

  • Yahoo

Restoring access to this part of Mount Rainier could cost up to $785 million

It has been over a month since the Washington State Department of Transportation permanently closed the state Route 165 Carbon River Fairfax Bridge — and now it wants to hear the public's thoughts on how to move forward. The 103-year-old, single-lane bridge was the only way for the public to access key areas of Mount Rainier National Park, such as Tolmie Peak, Mowich Lake and Spray Park, from state Route 165. WSDOT closed the bridge on April 22 due to safety risks. In an online open house for the public, WSDOT has identified seven potential projects. Each project has different cost estimates and time frames. The options are to: Maintain the permanent bridge closure. Replace the bridge at its current location. Replace the bridge north of its current location. Replace the bridge south of its current location. Realign state Route 165 and place a new bridge near Carbonado. Realign state Route 165 to connect with state Route 162 near Crocker. Realign state Route 165 east of Wilkeson and Carbonado. WSDOT does not currently have funding for any of the options; all of the agency's estimated time frames would start from whenever officials are able to identify funding. The first option would simply remove the existing bridge and not build a new one, according to the open house. 'The existing bridge would remain closed to all users with a dead end in Carbonado,' WSDOT wrote. 'With this no-build option, the bridge would be removed. This work would take about three years to complete once funding is received.' It would cost between $35 million and $50 million to remove the current bridge, WSDOT estimates. The second option would remove the existing bridge and build a new one in its place. WSDOT estimates that it would take six years to remove the current bridge and do design, permitting and construction for a new one. This would cost between $80 million and $130 million. WSDOT's third option would build a new 650-foot bridge north of its current location and realign half a mile of state Route 165. 'This alternative would take about six years from receiving funding and would include removal of the bridge, design, right-of-way, permitting, and construction,' WSDOT wrote. The cost would be between $60 million and $100 million. WSDOT's fourth option would build a new 650-foot bridge south of its current location and 'would require a minor realignment' of state Route 165. This project would take six years and cost between $60 million and $100 million. The fifth option would reroute state Route 165 to the south of Carbonado, starting by Wilkeson-Carbonado Road. 'A new bridge would be built spanning the Carbon River south of Carbonado,' WSDOT wrote. 'West of the Carbon River, the new alignment would follow Lilly Creek and reconnect to the existing SR 165 alignment near Lilly Creek Road East.' This option would take about five years and cost between $465 million and $785 million. WSDOT's sixth option would realign state Route 165 and connect it to state Route 162 near Crocker. This option would not require building a new bridge over the Carbon River. 'The new alignment would follow Lilly Creek and connect to the existing SR 165 alignment near Lilly Creek Road East,' WSDOT wrote. This would take about seven years and cost between $440 million and $735 million. The seventh and final alternative would realign state Route 165 east of Wilkeson and Carbonado. 'It would reconnect to the existing SR 165 south of the current Fairfax Bridge,' WSDOT wrote. 'It would upgrade 12 miles of road to highway standards and include a new or upgraded Kolisch Road bridge over the Carbon River.' Two new bridges would be required on Kolisch Road and Wilkeson Creek, WSDOT said. This would take about six years and cost between $375 million and $610 million. WSDOT is running its online open house until June 17. Residents can submit their feedback online until then at There is also an in-person open house on June 11 at Wilkeson Elementary School from 5:30 p.m. to 7:30 p.m. 'These are drop-in style events; you are welcome to come and go at your convenience,' WSDOT wrote. 'The content of the in-person open houses will be the same as this online format, but you will also be able to speak with the project team and ask questions.' The open house is part of WSDOT's $1.5 million planning study about the future of the bridge.

Washington's work zone speed camera program continues rollout
Washington's work zone speed camera program continues rollout

Yahoo

time2 days ago

  • Yahoo

Washington's work zone speed camera program continues rollout

The Brief Washington's "Work Zone Speed Camera Program" aims to reduce speeding and crashes in highway work zones. Since April, over 2,600 infractions have been issued, with most being first-time violations without fines. More cameras will be deployed next month, with the program running until June 2030. DUPONT, Wash. - Less than two months after launching, transportation officials are liking what they are seeing so far when it comes to the state's "Work Zone Speed Camera Program." Though some confusion exists among drivers through one work zone about the initiative. Created by a 2023 law, the WSDOT campaign rotates trailer-mounted cameras in various active highway work zones across the state to catch speeding drivers in hopes of slowing them down. WSDOT data shows an average of over 1,300 crashes have taken place annually around work zones over the past five years, with speeding being one of the main causes of those accidents. "Work zones are dangerous places in themselves, right? And then obviously having people drive through those work zones at a very high rate of speed also increases the danger for the workers and also the traveling public that goes through those work zones," said Kyle Miller, Program Manager for the camera project. The first camera launched in April, and another one rolled out this past week. Miller said the mobile cameras have moved around numerous work zones across Western Washington, including the Interstate 90/State Route 18 interchange project, fish passage work on U.S. Highway 12 in Grays Harbor County and work on Interstate 5 along Joint Base Lewis-McChord. "Anywhere where there's a worker – WSDOT, construction, some sort of project – we are able to use this solution," Miller said. "This tool is allowed to be used in any type of work zone – whether it's maintenance, whether it's an emergency, whether it's a big construction project you see on I-5 or I-90." According to Washington State Patrol data, 2,618 infractions have been issued since the program started. 2,504 of them were first-time violations that have no fine, while the remaining 114 infractions were second-time violations with a fine of $248. WSDOT is still compiling and analyzing data as the program is in its beginning phases, but Miller said work crews are reporting a difference in driver behavior. "When people see those signs, they appear to be slowing down from the feedback that I'm getting from the field itself – which is great, great news," he said. Many drivers through the Interstate 5 work zone said they support the idea of having a camera to slow people down for safety. Though a lot of them did not even know a camera could be there. "It's the first I've heard of it," said driver Tyler Hays from Chehalis. "I could see it being a good cause for the construction workers so people aren't exceeding the speed limit. It just keeps it safer for the construction workers who are just trying to do their jobs." "I've never seen it before," said DuPont resident Jinnori Serino. "It kinda just looks like part of the construction that is every day." Commuters through the area said while it is important to follow speed limits regardless of a camera, they would want to see more clear signage where one could be. "If your regular speed on the freeway, you're gonna keep going 70 – and especially if there's nothing that is significantly to show you that there's construction and a speed camera and whatnot," Serino said. "I think the speed cameras are okay, but only if people know that they're there," said Tacoma resident James King. "It should be to help people keep the speed limit so they'll keep themselves safe and those around them safe." WSDOT said they put up as many signs as possible alerting drivers to the camera's presence, as they want people to know to slow down. "This is not a gotcha in any way," said Assistant Communications Manager Amy Moreno. "We're actually happy when we don't generate infractions because people slowed down and that's a pretty successful deployment for us." As the rollout continues, Miller said more cameras will be launched next month, with work zones all across the state being discussed as new deployment locations. And as summer travel coincides with more road maintenance, it is in everyone's best interest to slow down. "This is not just about the worker's safety, it's also about the traveling public that goes through," he said. "Because ultimately, we really do want to make sure that everybody can come home safe." Miller said the program should have 15 cameras available to rotate across work zones within the next few years. The program is set to expire at the end of June 2030. The Source Information in this story came from Albert James, a television reporter covering state government as part of the Murrow News Fellowship program – a collaborative effort between news outlets statewide and Washington State University. Travis Decker manhunt: 'Remote' areas of 5 WA counties told to lock doors Former Army squadmate shares insight into Travis Decker's military past Miles Hudson found guilty on 2 counts of reckless driving in Seattle Key figures from Bryan Kohberger's youth summoned to Idaho for student murders trial Rochester dog training facility owner accused of killing employee during video shoot To get the best local news, weather and sports in Seattle for free, sign up for the daily FOX Seattle Newsletter. Download the free FOX LOCAL app for mobile in the Apple App Store or Google Play Store for live Seattle news, top stories, weather updates and more local and national news.

ROAD REPORT: Bids opening July 2 for Adams Co. Schoonover Road project
ROAD REPORT: Bids opening July 2 for Adams Co. Schoonover Road project

Yahoo

time2 days ago

  • Yahoo

ROAD REPORT: Bids opening July 2 for Adams Co. Schoonover Road project

Jun. 6—Key points: * Work starting to ramp up on road projects throughout the region. * Schoonover Road project in Adams County should start in August. OTHELLO — Bids will be opened July 2 for the first phase of the rebuilding of Schoonover Road, with construction tentatively scheduled for early August. The first phase is a section about eight miles north of Ritzville; among other things, Schoonover Road connects Ritzville and Odessa. "This is a reconstruction that is widening (the road), with a new subbase and surfacing with asphalt, drainage facilities and safety rail where needed," said Adams County Engineer Scott Yaeger in an earlier interview. "We're very excited to get that going," he said Tuesday. Schoonover Road is a multi-phase project; total cost for the first phase is about $3.13 million. A project to surface a section of Lind-Hatton Road in Adams County is entering its final phase. Yeager said guardrails will be installed next week in the project area, about five miles north of State Route 26 between South Damon Road and Phillips Road to the BNSF Railroad tracks. Repaving is scheduled to start June 12, with a second coat applied a week later, Yaeger said. Total project cost is about $3.12 million. People traveling on Highway 2 north of Wenatchee will encounter some delays between Leavenworth and Peshastin, beginning Monday. Traffic signal cameras and pedestrian safety upgrades will be installed at the intersection of Peshashtin's main street and Highway 2. Contractors also will be working on the Wenatchee River bridge on Highway 2 in Leavenworth. The project is scheduled for a maximum of10 working weekdays, according to a press release from the Washington Department of Transportation. Crews will be working from 7 a.m. to 6 p.m. Monday through Thursday. Crews will be working the night of June 12-13 from 6:30 p.m. to 7 a.m. Some projects are ongoing, some getting close to conclusion and others continuing throughout the construction season. Crack-sealing is continuing on Moses Lake streets, as well as work on sidewalks and gutters on Westshore Road west of Moses Lake. A misunderstanding led to some confusion about the Vantage Bridge project, which — as cross-state drivers know — is continuing with one lane open in each direction in June. Originally the WSDOT announced all four lanes of the bridge would be open in June. Actually, traffic will be restricted to one lane in each direction Monday through Friday throughout the month of June. All lanes will be open on weekends. Two lanes will be open in each direction over the July 4 weekend, July 3 through 8. But after July 8, the construction schedule shifts, Lott said, and one lane in each direction will be closed through the end of the construction season in November. The exception will be Labor Day weekend, Aug. 28 through Sept. 2, when both lanes will be open in each direction.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store