
Nuclear Fuels Commences 2025 Kaycee Uranium Project Drill Program
CSE:NF
OTCQX:NFUNF
VANCOUVER, BC, June 11, 2025 /CNW/ - Nuclear Fuels Inc. (CSE: NF) (OTCQX: NFUNF) ("Nuclear Fuels" or the "Company") announces the commencement of its 2025 drilling program, with an initial plan for at least 100,000 feet, at the Kaycee Uranium Project ("the Project") located in the Powder River Basin ("PRB") of Wyoming. The regional drilling conducted in late 2024 successfully identified two new zones of roll front-hosted uranium mineralization. Notably, the Outpost and Trail Dust Zones were discovered during the late stages of the 2024 program, and the Company is excited to follow up on these promising new areas during the 2025 drill program.
Highlights from the 2024 Regional Exploration Program (Nuclear Fuels NR January 29, 2025):
Drill hole LT24_050 returned 0.082% eU 3 O 8 over 6.5 feet for a total grade thickness ("GT") of 0.532, beginning at a downhole depth of 767.0 feet at the Outpost Zone;
At the Trail Dust Zone, located approximately 1.5 miles to the north of the Outpost Zone, drill hole LT24_037 returned 0.0553% eU 3 O 8 over 5.5 feet for a total hole GT of 0.304, beginning at a downhole depth of 886.0 feet;
The 2025 exploration program is now underway at the Project and will follow up on these results, as well as test other high priority targets;
This fully-funded exploration program consists of an initial 100,000 feet of rotary mud drilling, with results to be reported at a similar cadence to the 2024 drill program.
"Our 2025 drill program is designed to build on the discovery of the Outpost Zone and further test the potential of the Kaycee Project," said Greg Huffman, Chief Executive Officer. "This new zone of roll front-hosted uranium mineralization not only validates our geological model but also highlights the potential for further discoveries within this district. As we commence our 2025 drilling campaign, our priority is to delineate the extent of the Outpost Zone and assess its potential to contribute to future resources at Kaycee. We remain committed to advancing the Kaycee Project and delivering value to our shareholders through systematic exploration and development."
Strategic Transaction with Premier American Uranium Inc.
On June 5, 2025 the Company and Premier American Uranium Inc. (TSXV: PUR, OTCQB: PAUIF) announced that they have entered into an arm's length definitive agreement (Nuclear Fuels NR June 5, 2025), pursuant to which Premier American Uranium has agreed to acquire all of the issued and outstanding common shares of Nuclear Fuels by way of a court-approved plan of arrangement (the "Arrangement" or the "Transaction"). Under the terms of the Arrangement, shareholders of Nuclear Fuels will receive 0.33 of a common share of Premier American Uranium for each Nuclear Fuels Share held. Existing shareholders of Premier American Uranium and Nuclear Fuels will own approximately 59% and 41% (on a basic shares outstanding basis), respectively, of the pro forma outstanding PUR Shares on closing of the Arrangement. The Transaction will require approval by at least 66 2/3% of the votes cast by NF Shareholders and, if required by Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions, a simple majority of the votes cast by Nuclear Fuels Shareholders excluding certain interested or related parties, in each case by shareholders present in person or represented by proxy at a special meeting of NF Shareholders to be called in connection with the Transaction (the "NF Special Meeting"). The NF Special Meeting is expected to be held in the third quarter of 2025 and Closing of the Transaction is anticipated to occur in the third quarter of 2025.
Kaycee Uranium Project, Wyoming
The Kaycee Project in Wyoming's PRB, Nuclear Fuels' priority project, consists of 55 square miles of mineral rights over a 35-mile mineralized trend hosting 430 miles of identified roll fronts. The Kaycee Project is believed to be the only project in the PRB where all three known historically productive sandstone formations (Wasatch, Fort Union, and Lance) are mineralized and potentially accessible for ISR extraction. The Kaycee Project, under Nuclear Fuels, represents the first time since the early 1980's that the entire district is controlled by one company.
In 2023, Nuclear Fuels acquired the Kaycee Project from enCore Energy Corp., which retains a back-in right for 51% of the project by paying 2.5X the exploration costs and financing the Kaycee project to production (costs recoverable from production) upon Nuclear Fuels establishing a minimum 15 million pound eU 3 O 8 43-101 compliant resource.
Wyoming is a proven and prolific uranium producer with a pro-energy government and established regulatory regime for the permitting and extraction of uranium through ISR technology. Wyoming is one of the few "Agreement States" hosting ISR uranium deposits, where the federal government and the Nuclear Regulatory Commission have ceded regulatory authority to the state government, permitting and advancing uranium projects is more efficient and streamlined as compared to most other states. Wyoming, with over 250 million pounds of historic uranium production, ranks as the state with the second most uranium production to date; most of which has been through the ISR technology since 1990, predominantly from the PRB.
The technical content of this news release has been reviewed and approved by Mark Travis, CPG., a contractor to the Company, and a Qualified Person as defined in National Instrument 43-101.
About Nuclear Fuels Inc.
Nuclear Fuels Inc. is a uranium exploration company advancing early-stage, district-scale In-Situ Recovery ("ISR") amenable uranium projects towards production in the United States of America. Leveraging extensive proprietary historical databases and deep industry expertise, Nuclear Fuels is well-positioned in a sector poised for significant and sustained growth on the back of strong government support. Nuclear Fuels has consolidated the Kaycee district under single-company control for the first time since the early 1980s. Currently executing its 2025 drill program following successful 2023 and 2024 drilling, the Company aims to expand on historic resources across a 35-mile trend with over 430 miles of mapped roll-fronts defined by 3,800 drill holes. The Company's strategic relationship with enCore Energy Corp., America's Clean Energy Company™, offers a mutually beneficial "pathway to production," with enCore owning an equity interest and retaining the right to back-in to 51% ownership in the flagship Kaycee Project in Wyoming's prolific Powder River Basin.
Forward-Looking Information
The Canadian Securities Exchange has not reviewed this press release and does not accept responsibility for the adequacy or accuracy of this news release.
Certain information in this news release constitutes forward-looking statements under applicable securities laws. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements are often identified by terms such as "may", "should", "anticipate", "expect", "potential", "believe", "intend" or the negative of these terms and similar expressions. Forward-looking statements in this news release include, but are not limited to, statements relating to planned exploration programs and the results of additional exploration work in seeking to establish mineral resources as defined in NI43-101 on any of our properties. Forward-looking statements necessarily involve known and unknown risks, including, without limitation, risks associated with the completing planned exploration programs and the results of those programs; the ability to access additional capital to fund planned and future operations; regulatory risks including exploration permitting; risks associated with title to our mineral projects; the ability of the company to implement its business strategies; and other risks including risks contained in documents available for review at www.sedar.com under the Company's profile. Readers are cautioned not to place undue reliance on forward-looking statements as there can be no assurance that the plans, intentions or expectations upon which they are placed will occur. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement.
SOURCE Nuclear Fuels Inc.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Cision Canada
2 hours ago
- Cision Canada
MEREN ANNOUNCES AGM VOTING RESULTS
VANCOUVER, BC, June 12, 2025 /CNW/ - (TSX: MER) (Nasdaq-Stockholm: MER) – Meren Energy Inc. ("Meren" or the "Company") announces the voting results from the Company's annual general meeting of shareholders held today in Vancouver, British Columbia. View PDF version A total of 362,108,484 (53.61%) common shares were voted at the meeting, representing 53.61% of the votes attached to all the outstanding common shares of the Company as at Record Date April 24, 2025. Shareholders voted in favour of all items of business as follows: View PDF Election of Directors Shareholders elected the following nine (9) nominees to serve on the Company's board of directors until the next annual meeting of shareholders or until their successors are elected or appointed. The voting results were as follows: Appointment of Auditors Shareholders reappointed PricewaterhouseCoopers LLP as auditors of the Company for the upcoming year and authorized the directors of the Company to fix the remuneration of the auditor. The voting results were as follows: Votes For % For Withheld % Withheld 361,754,409 99.92 307,669 0.08 Advisory Resolution on Executive Compensation Shareholders approved management's approach to executive compensation (say on pay), as follows. About Meren Meren is a full-cycle Independent upstream oil and gas company with interests offshore Nigeria, Namibia, South Africa and Equatorial Guinea. Its main assets are producing and development assets in deepwater Nigeria operated by Majors. The Company holds a leading position in the Orange Basin including its effective interest in the Venus light oil project, offshore Namibia, and its direct interest in Block 3B/4B, offshore South Africa. Additional Information This information was submitted for publication, through the agency of the contact persons set out above, at 5:00 p.m. EDT on June 12, 2025. SOURCE Meren Energy Inc.


Toronto Star
8 hours ago
- Toronto Star
Osisko Metals Intersects 0.33% Cu Over 258 Metres at Gaspé
Includes 15.6 Metres Averaging 1.47% Cu and 8.5 g/t Ag E Zone Skarn Returns 29.7 Metres Averaging 1.92% Cu and 15.2 g/t Ag Infill Drilling Continues to Extend Deposit at Depth Below 2024 MRE MONTREAL, June 12, 2025 (GLOBE NEWSWIRE) — Osisko Metals Incorporated (the 'Company or 'Osisko Metals') (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce new drilling results from the 2025 drilling program at the Gaspé Copper Project, located in the Gaspé Peninsula of Eastern Québec. Results for eight new holes are reported below, located at the southern end of the deposit defined in the 2024 Mineral Resource Estimate ('MRE', see attached map and November 14, 2024 news release). Highlights (see Table 1 below): Drill hole 30-1075, located in the south-eastern portion of the 2024 MRE model, intersected 258.0 metres averaging 0.33% Cu and 2.95 g/t Ag (including 15.6 metres averaging 1.47% Cu and 8.5 g/t Ag), and a second intercept at depth, below the base of the 2024 MRE model, of 96 metres averaging 0.54% Cu and 3.34 g/t Ag, extending mineralization to a vertical depth of 529 metres. Drill hole 30-1076, located along the southern limit of the 2024 MRE model, intersected 208.4 metres averaging 0.40% Cu and 2.61 g/t Ag (including 12.0 metres averaging 1.91% Cu and 9.6 g/t Ag), followed by a second intercept of 70.8 metres averaging 0.25% Cu and 2.15 g/t Ag, and a third intercept at depth, below the base of the 2024 MRE model, of 48.9 metres averaging 0.34% Cu and 2.78 g/t Ag, extending mineralization to a vertical depth of 548 metres. Drill hole 30-1068, located in the south-eastern portion of the 2024 MRE model, intersected 189.0 metres averaging 0.30% Cu and 2.62 g/t Ag. Drill hole 30-1070, located near the eastern limit of the 2024 MRE model, intersected 160.5 metres averaging 0.16% Cu and 1.92 g/t Ag, followed by a second intercept of 122.8 metres averaging 0.62% Cu and 4.86 g/t Ag (including 25.6 metres averaging 2.19% Cu and 16.9 g/t Ag at the level of the C Zone skarn), followed by a third intercept at depth, below the base of the 2024 MRE model, of 29.7 metres averaging 1.92% Cu and 15.2 g/t Ag at the level of the E Zone skarn, extending mineralization to a vertical depth of 629 metres. Drill hole 30-1075, located in the south-eastern portion of the 2024 MRE model, intersected 258.0 metres averaging 0.33% Cu and 2.95 g/t Ag (including 15.6 metres averaging 1.47% Cu and 8.5 g/t Ag), and a second intercept at depth, below the base of the 2024 MRE model, of 96 metres averaging 0.54% Cu and 3.34 g/t Ag, extending mineralization to a vertical depth of 529 metres. Drill hole 30-1076, located along the southern limit of the 2024 MRE model, intersected 208.4 metres averaging 0.40% Cu and 2.61 g/t Ag (including 12.0 metres averaging 1.91% Cu and 9.6 g/t Ag), followed by a second intercept of 70.8 metres averaging 0.25% Cu and 2.15 g/t Ag, and a third intercept at depth, below the base of the 2024 MRE model, of 48.9 metres averaging 0.34% Cu and 2.78 g/t Ag, extending mineralization to a vertical depth of 548 metres. Drill hole 30-1068, located in the south-eastern portion of the 2024 MRE model, intersected 189.0 metres averaging 0.30% Cu and 2.62 g/t Ag. Drill hole 30-1070, located near the eastern limit of the 2024 MRE model, intersected 160.5 metres averaging 0.16% Cu and 1.92 g/t Ag, followed by a second intercept of 122.8 metres averaging 0.62% Cu and 4.86 g/t Ag (including 25.6 metres averaging 2.19% Cu and 16.9 g/t Ag at the level of the C Zone skarn), followed by a third intercept at depth, below the base of the 2024 MRE model, of 29.7 metres averaging 1.92% Cu and 15.2 g/t Ag at the level of the E Zone skarn, extending mineralization to a vertical depth of 629 metres. Drill hole 30-1074, located in the south-central portion of the 2024 MRE model, intersected 118.5 metres averaging 0.26% Cu and 1.92 g/t Ag, and a second intercept of 167.2 metres averaging 0.22% Cu and 1.60 g/t Ag at depth below the base of the 2024 MRE model, extending mineralization to a vertical depth of 797 metres. Table 1: Drill hole mineralized intervals, see attached map for drill hole locations. Drill hole 30-1073 was drilled to the east of the 2024 MRE limit and did not intersect significant mineralization. Previously reported drill holes 30-1062 and 30-1066 were also collared to the southeast and to the east, respectively, of the 2024 MRE limit and these holes also failed to intersect significant mineralization, indicating that the deposit does not extend towards the east. The deposit remains open to the south and southwest. ARTICLE CONTINUES BELOW All holes were drilled sub-vertically into the altered calcareous stratigraphy which dips 20 to 25 degrees to the north; true widths are estimated at 90-92% of reported widths. The L1 (C Zone) the L2 (E Zone) skarn/marble horizons were intersected in most holes, as well as intervening porcellanites (pale green to white potassic-altered hornfels) that host the bulk of the disseminated copper mineralization. The November 2024 MRE was limited at depth to the base of the L1 skarn horizon (C Zone), and all mineralized intersections below this horizon represent potential depth extensions to the deposit, to be included in the next scheduled MRE update in Q1 2026. Mineralization occurs as disseminations and veinlets of chalcopyrite and is mostly stratigraphically controlled in the area of Needle Mountain, Needle East and Copper Brook. As expected, no significant molybdenum mineralization was encountered in porcellanites in the latter areas, but high grades (up to 0.4% Mo) were locally obtained in both the C Zone and E Zone skarns. The bulk of the molybdenum mineralization occurs in veinlet stockworks further north at Copper Mountain, where true porphyry copper-style mineralization occurs, forming a distinct secondary mineralized zone that is characterized by widespread, continuous copper-molybdenum stockwork mineralization radiating from the central source of hydrothermal fluids, i.e. the Copper Mountain porphyry intrusion. At least five vein/stockwork mineralizing events have been recognized at Copper Mountain, which overprint earlier skarn/porcellanite-hosted mineralization throughout the Gaspé Copper system. The 2022 to 2024 Osisko Metals drill programs were focused on defining open-pit resources within the Copper Mountain stockwork mineralization, leading to the May 2024 MRE (see May 6, 2024 press release). Extending the resource model south of Copper Mountain into the poorly-drilled primary skarn/porcellanite portion of the system subsequently led to a significantly increased resource, mostly in the Inferred category (see November 14, 2024 press release). The current drill program is designed to convert the November 2024 MRE to Measured and Indicated categories, as well as test the extension of the system deeper into the stratigraphy and laterally to the south and southwest towards Needle East and Needle Mountain respectively. Qualified Person Mr. Bernard-Olivier Martel, P. Geo. is the Independent Qualified Person responsible for the technical data reported in this news release and he is a Professional Geologist registered in the Province of Quebec. ARTICLE CONTINUES BELOW ARTICLE CONTINUES BELOW Quality Assurance / Quality Control Mineralized intervals reported herein are calculated using an average 0.12% copper lower cut-off over contiguous 20-metre intersections (shorter intervals as the case may be at the upper and lower limits of reported intervals). Intervals of 20 metres or less are not reported unless indicating significantly higher grades. Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.'s preparation facility in Sudbury. Sample preparation details (code PREP-31DH) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for copper, molybdenum and silver. About Osisko Metals Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals sector, with a focus on copper and zinc. The Company acquired a 100% interest in the past-producing Gaspé Copper mine from Glencore Canada Corporation in July 2023. The Gaspé Copper mine is located near Murdochville in Québec ' s Gaspé Peninsula. The Company is currently focused on resource expansion of the Gaspé Copper system, with current Indicated Mineral Resources of 824 Mt averaging 0.34% CuEq and Inferred Mineral Resources of 670 Mt averaging 0.38% CuEq (in compliance with NI 43-101). For more information, see Osisko Metals' November 14, 2024 news release entitled ' Osisko Metals Announces Significant Increase in Mineral Resource at Gaspé Copper '. Gaspé Copper hosts the largest undeveloped copper resource in eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec. In addition to the Gaspé Copper project, the Company is working with Appian Capital Advisory LLP through the Pine Point Mining Limited joint venture to advance one of Canada ' s largest past-producing zinc mining camps, the Pine Point project, located in the Northwest Territories. The current mineral resource estimate for the Pine Point project consists of Indicated Mineral Resources of 49.5 Mt averaging 5.52% ZnEq and Inferred Mineral Resources of 8.3 Mt averaging 5.64% ZnEq (in compliance with NI 43-101). For more information, see Osisko Metals ' June 25, 2024 news release entitled 'Osisko Metals releases Pine Point mineral resource estimate: 49.5 million tonnes of indicated resources at 5.52% ZnEq'. The Pine Point project is located on the south shore of Great Slave Lake, Northwest Territories, close to infrastructure, with paved road access, an electrical substation and 100 kilometers of viable haul roads. For further information on this news release, visit or contact: Don Njegovan, President Email: info@ Phone: (514) 861-4441 Cautionary Statement on Forward-Looking Information This news release contains 'forward-looking information' within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as 'expects', or 'does not expect', 'is expected', 'interpreted', 'management's view', 'anticipates' or 'does not anticipate', 'plans', 'budget', 'scheduled', 'forecasts', 'estimates', 'potential', 'feasibility', 'believes' or 'intends' or variations of such words and phrases or stating that certain actions, events or results 'may' or 'could', 'would', 'might' or 'will' be taken, occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains forward-looking information pertaining to, among other things: the tax treatment of the FT Units; the timing of incurring the Qualifying Expenditures and the renunciation of the Qualifying Expenditures; the ability to advance Gaspé Copper to a construction decision (if at all); the ability to increase the Company's trading liquidity and enhance its capital markets presence; the potential re-rating of the Company; the ability for the Company to unlock the full potential of its assets and achieve success; the ability for the Company to create value for its shareholders; the advancement of the Pine Point project; the anticipated resource expansion of the Gaspé Copper system and Gaspé Copper hosting the largest undeveloped copper resource in eastern North America. ARTICLE CONTINUES BELOW ARTICLE CONTINUES BELOW Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: the ability of exploration results, including drilling, to accurately predict mineralization; errors in geological modelling; insufficient data; equity and debt capital markets; future spot prices of copper and zinc; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of mining equipment and positive relations with local communities and groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company's public disclosure record on SEDAR+ ( under Osisko Metals' issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward- looking information, whether as a result of new information, future events or otherwise, other than as required by law. A photo accompanying this announcement is available at:


Cision Canada
9 hours ago
- Cision Canada
Perpetua Resources Announces Upsizing of Previously Announced Bought Deal Public Offering of Common Shares
BOISE, Idaho, June 12, 2025 /CNW/ - Perpetua Resources Corp. (Nasdaq: PPTA) (TSX: PPTA) ("Perpetua Resources" or the "Company") announced today that as a result of excess demand, it has agreed with the syndicate of underwriters led by National Bank of Canada Financial Markets and BMO Capital Markets, on behalf of themselves and a syndicate of underwriters (the "Underwriters") to increase the size of its previously announced bought deal financing. Perpetua Resources will now issue 24,622,000 common shares, no par value, of the Company (the "Common Shares") at a price of US$13.20 per Common Share (the "Offering Price") for aggregate gross proceeds of approximately US$325 million (the "Offering"). National Bank of Canada Financial Markets and BMO Capital Markets are acting as joint lead bookrunning managers for the Offering. In connection with the Offering, Paulson & Co. Inc. has entered into an agreement to purchase US$100 million of Common Shares in a private placement (the "Private Placement") at the Offering Price. Perpetua Resources has also granted the Underwriters an option (the "Option") to purchase up to an additional 3,693,300 Common Shares representing up to 15% of the number of Common Shares to be sold pursuant to the Offering. The Underwriters have 30 days from the closing of the Offering to exercise the Option. In connection with the Offering, an underwriting agreement has been entered into by and among Perpetua Resources, National Bank of Canada Financial Markets and BMO Capital Markets as representatives of the several Underwriters (the "Underwriting Agreement"). In the event that the Option is exercised in full, the aggregate gross proceeds of the Offering will be approximately US$374 million. The Company intends to use the proceeds of the Offering and the Private Placement as part of a comprehensive financing package for the development of the Company's Stibnite Gold Project (the "Project") in conjunction with the previously announced application for up to US$2 billion in project financing submitted to the Export-Import Bank of the United States ("EXIM") in May 2025. The Company intends to designate the proceeds of the Offering and the Private Placement toward equity requirements for the EXIM debt financing, with any additional funds intended to support exploration activities, working capital and general corporate purposes. EXIM's due diligence on the Company's application is ongoing and is conditional upon successfully completing the due diligence and underwriting process. If the due diligence process is successful, the Company anticipates closing the debt financing in 2026. The Offering is expected to close on or about June 16, 2025. Closing of the Offering will be subject to a number of customary conditions to be included in the Underwriting Agreement. The Offering to the public in the United States is being made pursuant to the Company's effective shelf registration statement on Form S-3 (File No. 333-266071) (the "U.S. Registration Statement"), including a base prospectus, previously filed with the Securities and Exchange Commission (the "SEC"). The Offering in the United States will be made only by means of a prospectus and related prospectus supplement meeting the requirements of Section 10 of the Securities Act of 1933, as amended. You may obtain these documents for free by visiting EDGAR on the SEC's website at Alternatively, copies of the U.S. Registration Statement, preliminary prospectus supplement and base prospectus may be obtained from National Bank of Canada Financial Markets, 130 King Street West, 4 th Floor Podium, Toronto, Ontario M5X 1J9, by email at [email protected] or by telephone at (416) 869-8414. The Offering may also be conducted in Canada and in offshore jurisdictions on a private placement basis in accordance with applicable securities laws. The Company intends to rely on the exemption in section 602.1 of the TSX Company Manual in respect of the Offering and the Private Placement as an eligible interlisted issuer. The Private Placement is expected to close concurrently with the closing of the Offering and is subject to customary conditions, including the completion of the Offering, but the Offering is not contingent upon the consummation of the Private Placement. The sale of the Common Shares under the Private Placement will not be registered under the Securities Act of 1933, as amended. Since neither the fair market value of the Common Shares to be acquired by the Paulson (an insider of the Company), nor the consideration for the Common Shares paid by Paulson, exceeds 25% of the Company's market capitalization as calculated in accordance with MI 61-101 (as defined below), the Private Placement is exempt from the formal valuation and minority approval requirements of Multilateral Instrument 61-101 - Protection of Minority Security Holders in Special Transactions ("MI 61-101") pursuant to subsections 5.5(a) and 5.7(1)(a) of MI 61-101. No securities regulatory authority has either approved or disapproved the contents of this news release. This news release does not constitute an offer to sell or the solicitation of an offer to buy Common Shares, nor shall there be any sale of these securities in any jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such jurisdiction. About Perpetua Resources and the Stibnite Gold Project Perpetua Resources Corp., through its wholly owned subsidiaries, is focused on the exploration, site restoration and redevelopment of gold-antimony-silver deposits in the Stibnite-Yellow Pine district of central Idaho that are encompassed by the Stibnite Gold Project. The Stibnite Gold Project is one of the highest-grade, open pit gold deposits in the United States and is designed to apply a modern, responsible mining approach to restore an abandoned mine site and produce both gold and the only mined source of antimony in the United States. Perpetua Resources has been awarded a Technology Investment Agreement of US$59.2 million in Defense Production Act Title III funding to advance construction readiness and permitting of the Stibnite Gold Project. Antimony trisulfide from Stibnite is the only known domestic reserves of antimony that can meet U.S. defense needs for many small arms, munitions, and missile types. CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS OR INFORMATION Investors should be aware that the EXIM Letter of Interest ("LOI") is non-binding and conditional, and does not represent a financing commitment. A funding commitment, if any, is conditional upon successfully completing the due diligence and underwriting process, which may not be completed on the expected timeline, or at all. If the Company's application is approved, there can be no assurance that the EXIM financing will be for the full amount indicated in the LOI or the increased amount requested in the application, or that the approved EXIM financing will be sufficient for the Company to commence construction of the Project. Further, release of funding under any such commitment would be subject to the satisfaction of certain conditions and covenants by the Company. Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-Looking Information includes, but is not limited to, disclosure regarding the conduct of the Offering and Private Placement; the granting of the Underwriters' over-allotment option; the anticipated use of proceeds from the Offering and Private Placement; the occurrence of the expected benefits from the anticipated use of proceeds from the Offering, Private Placement, EXIM financing and royalty financing disclosure regarding the review process, anticipated timing and potential outcome of the Company's EXIM financing application; the amount of potential debt financing available to the Company; the eligibility of the Project for funding under the MMIA and CTEP initiatives; our ability to fully fund the construction of the Project and related financial assurance obligations; our ability to successfully implement and fund the Project; and the occurrence of the expected benefits from the Project, including providing a domestic source of antimony, national defense benefits, creation of jobs and environmental benefits. In certain cases, Forward-Looking Information can be identified by the use of words and phrases or variations of such words and phrases or statements such as "anticipate", "expect", "plan", "likely", "believe", "intend", "forecast", "project", "estimate", "potential", "could", "may", "will", "would" or "should". In preparing the Forward-Looking Information in this news release, Perpetua Resources has applied several material assumptions, including, but not limited to, assumptions that the EXIM application will be reviewed and approved within the expected timeframe at the amount equal to or higher than the amount indicated in the LOI; that the Company will be able to satisfy the conditions to obtain a funding commitment from EXIM and to receive committed funds when needed; general business and economic conditions will not change in a materially adverse manner and that permitting and operations costs will not materially increase; and that we will be able to discharge our liabilities as they become due and continue as a going concern. Forward-Looking Information are based on certain material assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Perpetua Resources to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. Such risks and other factors include, among other things, risks related to delays in the EXIM application review process; any approved amount of EXIM financing may not be sufficient to commence construction of the Project; risks related to unforeseen delays in the review and permitting process, including as a result of legal challenges to the ROD or other permits; risks related to opposition to the Project; risks related to increased or unexpected costs in operations or the permitting process; risks that necessary financing will be unavailable when needed on acceptable terms, or at all, as well as those factors discussed in Perpetua Resources' public filings with the SEC and its Canadian disclosure record. Although Perpetua Resources has attempted to identify important factors that could affect Perpetua Resources and may cause actual actions, events or results to differ materially from those described in Forward-Looking Information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. For further information on these and other risks and uncertainties that may affect the Company's business and liquidity, see the "Risk Factors" and "Management's Discussion and Analysis of Financial Condition and Results of Operations" sections of the Company's filings with the SEC, which are available at and with the Canadian securities regulators, which are available at Except as required by law, Perpetua Resources does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. SOURCE Perpetua Resources Corp.