logo
Blue Bridge expected to close for 90 days this summer

Blue Bridge expected to close for 90 days this summer

Yahoo2 days ago

HENDERSON, Ky. (WEHT)- Repairs to safeguard the iconic Blue Bridge in downtown Owensboro are scheduled to begin this summer.
Owensboro Davco residents displaced by fire welcomed in Bowling Green
The repairs will happen on both sides of the Ohio River and will include a new concrete driving surface. The repairs will require a 90-day closure, which is expected to begin after the Fourth of July holiday. Prep work is scheduled to begin on Monday, June 9, with single lane closures across the bridge lasting through June 11.
The full closure will begin after the July 4 weekend to replace the bridge deck, make concrete repairs, and repair bridge joints. While the entire project is slated to last through November, the Kentucky Transportation Cabinet is limiting the actual bridge closure to 90 days or less and plans to conduct any work that does not require a full closure outside of that time period to reduce impacts on traffic.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Police respond to major car crash in South Sacramento
Police respond to major car crash in South Sacramento

Yahoo

time2 hours ago

  • Yahoo

Police respond to major car crash in South Sacramento

( — The Sacramento Police Department is responding to a major car crash in South Sacramento. Around 11:38 p.m., SPD said a major collision near Florin Road and Greenhaven Drive is impacting traffic. Officers advised travelers to use alternate routes. Additional information will be provided as it becomes available. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Single-lane closures scheduled for Victory Boulevard Widening Project
Single-lane closures scheduled for Victory Boulevard Widening Project

Yahoo

time3 hours ago

  • Yahoo

Single-lane closures scheduled for Victory Boulevard Widening Project

YORK CO., Va. (WAVY) – Starting June 9, long-term single-lane closures will be in effect on Victory Boulevard as a part of the Virginia Department of Transportation's (VDOT) roadway widening project. The left westbound lane between Hampton Highway and George Washington Memorial Highway will be closed, as well as the inside left-turn lane between Victory Boulevard and George Washington Memorial Highway. The closures are expected to be in place through early July, with additional closures on Victory Boulevard from 9 a.m. and 3 p.m. and 8 p.m. to 6 a.m. when needed. For more information on the project visit the link here. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store