
Cochin University Admission Test 2025 Result To Be Out Today, Check Details
CUSAT CAT Result 2025 Date And Time: The Cochin University of Science and Technology (CUSAT) has officially announced the date and time for the declaration of the Common Admission Test (CAT) 2025 results. The final answer key was released on May 26, allowing students to review their responses and estimate their probable scores.
According to the university, the CUSAT CAT 2025 result will be announced on June 4 at 12:30 PM by Vice-Chancellor Dr Junaid Bushiri. Candidates who appeared for the exam will be able to check their results by visiting the university's official websites: results.cusat.ac.in or admissions.cusat.ac.in.
The CUSAT CAT 2025 was conducted in computer-based test (CBT) mode between May 10 and 12 for admission to various undergraduate and postgraduate programmes offered by the university.
Students seeking admission to specialised programmes such as BTech, Marine Engineering, and various postgraduate disciplines appeared for the exam.
CUSAT CAT 2025 Result: Here's How To Check
Visit the official website: admissions.cusat.ac.in
Click on the CAT 2025 result link and log in using your credentials
Once logged in, your result will appear on the screen
Download and print a copy for the counselling rounds
What's Next After the CUSAT CAT 2025 Results?
After the declaration of results, qualified candidates will be invited to participate in the CUSAT CAT 2025 counselling process, expected to begin later in June.
The counselling process includes:
Online registration
Choice filling of preferred courses and colleges
Document verification
Seat allotment
Payment of fees
Each programme at the university has a designated number of seats-for instance, Marine Engineering offers 80 seats, while Naval Architecture and Ship Building has 42 seats, including 15 specifically set aside for Indian Navy personnel.
Admission will be finalised based on candidates' merit, the number of seats available, and completion of document verification along with fee payment.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


NDTV
an hour ago
- NDTV
COMEDK UGET 2025 Result Announced; Rank Cards To Be Released At 2 PM Today
COMEDK UGET 2025: The Consortium of Medical, Engineering, and Dental Colleges of Karnataka (COMEDK) has officially declared the results of the Undergraduate Entrance Test (UGET) 2025. Candidates who appeared for the exam can access their rank cards from 2 PM today by logging into the official website, The COMEDK UGET 2025 exam, conducted on May 10, is a state-level entrance test for admission to various engineering programmes offered by over 150 participating institutions across Karnataka. The counselling process for qualified candidates is scheduled to begin from June 9, 2025. Steps To Download COMEDK UGET 2025 Rank Card Step 1. Visit the official COMEDK website - Step 2. Go to the "Candidate Login" section on the homepage Step 3. Enter your registered credentials (User ID and Password) Step 4. Submit the details to access your result Step 5. Download and print the rank card for future reference The exam comprised 180 objective-type questions divided across Physics, Chemistry, and Mathematics. Candidates were awarded one mark per correct answer, and there was no negative marking. Admission Process And Counselling With the results now declared, COMEDK will proceed with a centralised counselling process through a Single Window System to allocate seats in engineering colleges. Further details regarding the counselling schedule, document verification, and seat allotment will be available on the COMEDK website shortly. Counseling registration and document upload for the COMEDK UGET 2025 will commence on June 9, 2025, at 4 pm and will continue until June 18, 2025, at 2 pm. During this period, candidates are required to complete their registration and upload the necessary documents. Candidates are encouraged to regularly monitor their emails and the official website for further notifications, including counselling updates and documentation requirements.


Time of India
8 hours ago
- Time of India
Three-Month Runway Closure At IGI May Impact 200 Flights Daily
New Delhi: Flight operations will be impacted at Indira Gandhi International Airport when runway 10/28 is closed from June 15 to Sept 15 for upgradation. However, airport operator Delhi International Airport Limited clarified that only around 200 flights could be impacted daily. It has coordinated with airlines to reschedule 86 flights every day after cancelling 114 daily arrivals or departures during the period. DIAL CEO Videh Kumar Jaipuriar said on Friday that the upgradation work was likely to take around three months but would eventually benefit flyers in the fog season when visibility is reduced considerably. The runway is being closed to make it CAT-IIIB compliant to facilitate operations during dense fog in Delhi's winter. It was first closed for upgrades in April and May, but caused delays of hundreds of daily flights. Worsened by prevalence of easterly winds, which lowered the hourly landing capacity from 42 to 32 flights per hour, the runway had to be reopened to facilitate peak season flights. Delhi airport operates with four runways: 27/9, 10/28, 29R/11L and 29L/11R. DIAL said when runway 10/28 remains closed, runway 29R/11L will handle departures, 29L/11R will manage arrivals and runway 27/9 will serve both arriving and departing flights. During westerly winds, the three remaining runways can accommodate 42 arrivals and 42 departures per hour. However, when easterly winds prevail, the departure capacity remains at 42 per hour while the arrival capacity reduces to 32 per hour. Jaipuriar said Delhi airport handled around 1,450 flights daily, of which around 7.5% could be cancelled in the affected period. Normally, the airport sees an average of 3.5% cancellations. "It is just a little bit more than the normal average. It will not significantly disrupt the operations," Jaipuriar said. He said after consultation with all stakeholders, more flights have been shifted from peak hours to non-peak hours. "The difference is that the last time, we did not reschedule the flights, and there were delays due to the cascading effect," said Jaipuriar. DIAL earlier said that during peak fog season, only 15 flights landed every hour on the only CAT-3B compliant runway, but this upgradation work would double that number. DIAL said flights from big airports wouldn't face a major impact. For instance, the number of arrivals from Mumbai would only reduce from 56 to 54 per day and from Bengaluru, 38 to 36 daily. "The same flights that arrive at an airport fly back. Hence the same number of departures are impacted," Jaipuriar explained. Jaipuriar revealed that every hour of fog disruption took over three subsequent hours for operations to become normal because of safety issues because the space between two flights had to be maintained at a specific level. Get the latest lifestyle updates on Times of India, along with Eid wishes , messages , and quotes !


Hindustan Times
8 hours ago
- Hindustan Times
Delhi airport runway closure to affect 200 flights daily
Delhi's Indira Gandhi International (IGI) airport will cancel 114 flights daily and reschedule another 86 during a three-month runway closure from June 15 to September 15, airport operator Delhi International Airport Limited (DIAL) announced on Friday. The plan, developed after detailed deliberations with airlines and other stakeholders, aims to prevent a repeat of the widespread chaos that erupted in April when the same runway maintenance work was attempted without adequate coordination. Also Read: Major flight disruptions on cards for Delhi airport | Here's why DIAL said that while it has rescheduled 86 flights to non-peak hours, 114 flights (57 arrivals and 57 departures) will be cancelled daily when runway 28/10 undergoes upgradation work to make it CAT-IIIB compliant for the upcoming fog season. 'We are better prepared now for this exercise and detailed deliberations and stakeholder consultations were held in the last few weeks,' DIAL chief executive officer Videh Kumar Jaipuriar said on Friday, acknowledging that these adjustments were not made previously, which led to the April chaos. Also Read: Operations hit at Delhi's IGI airport amid massive dust storms, 14 flights diverted The first attempt to upgrade runway 28/10 in April had to be aborted within four weeks after flight schedules descended into chaos. The airport became unable to handle its daily load of flights, a situation made worse due to unseasonably high spells of easterly winds, which reduced the hourly arrival rate from 42 flights per hour to 32 flights per hour. The month of May is regarded as the peak of the summer season, including vacation travel, followed by travel surges in the pre-winter and winter months that feature a number of festivals and the wedding season. Operations on runway 28/10 resumed on May 6, almost a month after it shut down, following directions from the ministry of civil aviation (MoCA) citing passenger inconvenience. The ministry had directed that upgradation work resume in June with proper planning. 'For every one hour where flights are delayed, it takes three hours for the flight schedule to become normal, as there is a cascading effect on the remaining schedule,' Jaipuriar explained, highlighting why proactive cancellations are necessary this time. The airport typically handles close to 1,450 flights daily, meaning around 7.8% of all flights will be cancelled on a daily basis—marginally above the typical 3-4% daily flight cancellations. 'So this is just marginally above average,' Jaipuriar said. The plan involves shifting more flights from peak hours to non-peak hours to reduce possible impact during the closure period. 'Earlier, we were seeing only 25-26 flights landing in some off-peak hours,' Jaipuriar said, explaining how better distribution of flight movements will help manage the constraints. Key domestic airlines – IndiGo, Air India, SpiceJet and Akasa Air – did not respond to requests for a comment. Officials close to the matter, who asked not to be named, revealed that IndiGo will be cancelling 33 daily flights, while Air India will have to cancel 25 flights daily. Delhi airport operates four runways: 27/9, 28/10, 29R/11L and 29L/11R. Following closure of 28/10, runway 29R/11L will handle departures, 29L/11R will handle all arrivals, and runway 27/9 will be hybrid, handling both arrivals and departures. If westerly winds prevail, the three operational runways will handle 42 arrivals and 42 departures each per hour. However, in case of easterly winds—which caused major problems in April—they will be able to handle 42 departures but only 32 arrivals. The period of works will coincide with the monsoon season, when wind patterns can vary and force the airport into orienting operations for the easterly winds scenario. DIAL said flights from major airports have not been impacted significantly, with only a 4-8% reduction in daily flights. For Mumbai, arrivals will decrease from 56 to 54; for Kolkata, from 22 to 21; for Ahmedabad, from 21 to 19; for Bengaluru, from 38 to 36; for Chennai, from 20 to 19; and for Patna, from 13 to 12. 'The same flights that arrive at an airport depart back, so the same number of departures are also impacted,' Jaipuriar explained. Runway 28/10 requires closure for two key works: making it CAT-IIIB compliant so flights can land in very dense fog spells, and upgrading the existing Instrument Landing System (ILS). 'Even if it finishes by September 15, work will be done before the festive season starts. Ultimately, it will benefit fliers in the fog season, when visibility becomes extremely low,' Jaipuriar said. Currently, during peak fog conditions, only 15 flights can land every hour on the airport's only CAT-III B compliant runway. This upgrade work will allow 30 flights to land every hour, significantly improving winter operations when Delhi's dense fog typically causes widespread flight delays. DIAL said it shared a slot adjustment plan with airlines on April 25, with airlines providing feedback in the first and second weeks of May. The finalised slots and plan were submitted to the ministry on May 22 and subsequently to the Directorate General of Civil Aviation, which evaluated and approved the plan.