Rains lead to closure of tourist spots in Nilgiris; Avalanche dam sluice gates opened
The Forest Department announced the tourist spots were closed owing to concerns over public safety due to heavy winds.
The Nilgiris district administration stated an average of 50.46 mm of rain were recorded across the district between Saturday evening and Sunday morning (July 26 and 27, 2025), with intense rains in Naduvattam, Parsons Valley, Porthimund, Avalanche, Upper Bhavani and moderate to heavy rain in parts of Gudalur and Pandalur.
Nilgiris Collector helps unearth hidden milestone in Nilgiris' history
The heavy rains had led to trees becoming uprooted along the Udhagamandalam to Gudalur Road, while boulders had also become dislodged and blocked the route to Melkowhatty. The National and State Highways Departments both mobilised men to immediately clear the blockages to traffic and traffic flow was restored soon afterwards.
Power outages were also reported across many places in Udhagamandalam, Gudalur and Manjoor towns owing to the rains accompanied by heavy winds.
Nilgiris district a hotspot for negative human-gaur interactions in Tamil Nadu: study
On Sunday (July 27, 2025), the Nilgiris district administration urged residents in Emerald, Nehru Nagar and other areas downstream of the Avalanche dam to not venture close to rivers and streams fed by the dam waters. The sluice gates of the dam were opened on Sunday morning at around 9.30 a.m.
Last weekend, the Pykara Dam had also reached full capacity and its sluice gates were opened. The TANGEDCO officials stated that they continued to monitor the capacities of other dams in the district, including Upper Bhavani to ensure the dam's safety.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


India Today
3 hours ago
- India Today
Uttarkashi tragedy: Did we not learn anything from the 2013 Kedarnath disaster?
Over the past decade, Uttarakhand has made visible progress in disaster management. From better forecasting tools to quicker mobilisation of response teams, the state has shown a growing commitment to protecting its people and strengthening swift response to the 2025 Uttarkashi tragedy reflects how far disaster response systems have come since the devastating floods in Kedarnath in 2013. But progress, though real, has not been rescue operations are faster, deep-rooted vulnerabilities—especially in hyper-local forecasting and infrastructure readiness, continue to expose remote communities to preventable losses. The Uttarkashi disaster occurred with little advance notice. Weather radars, even the best of them, offer limited foresight, sometimes just an hour or two, before such extreme localised rainfall events. In Dharali, where this tragedy struck, there was no hyper-local warning. That failure, while technically understandable, is not new. It happened in Kedarnath too. However, since 2013, the government has made significant strides toward building a more integrated Early Warning System (EWS).Multiple Doppler radars, expansion of the India Meteorological Department's forecasting infrastructure, and new protocols for inter-agency coordination have been introduced. These steps have laid the groundwork for better response capacity, even if full real-time microscale prediction remains out of reach. Yes, rescue teams did arrive swiftly this time, far quicker than in 2013. Relief operations began within hours, which is commendable. This faster response is the result of improved coordination between central and state agencies, as well as increased pre-positioning of disaster response teams in vulnerable districts during the while response has improved, preparedness still Kedarnath, warnings from the India Meteorological Department were either ignored or poorly acted upon. Uttarkashi's event, a decade later, continues that pattern in a new form, where the lack of hyper-local forecasting meets inadequate infrastructure, and once again, people in remote villages suffer the in the Himalayas do not always begin with the clouds; they often begin with unregulated construction, overburdened riverbanks, and mountains hollowed out by mining. Kedarnath exposed how unchecked development in sensitive zones multiplies zoning maps, controlling hotel construction near rivers, and assessing the environmental feasibility of current and planned hydropower projects should have been the focus of the years that have passed. Instead, hotels still dot the flood-prone zones of Uttarkashi, with little oversight and fewer safety checks. Disasters in the Himalayas do not always begin with the clouds. Photo: PTI The failure of the state's disaster warning and mitigation systems was widely acknowledged following the floods in Kedarnath. Stronger institutional coordination between the National Disaster Management Authority, State Disaster Management Authorities, and the India Meteorological Department was these organisations continue to operate roles are still unfilled. Resilient design, community involvement, and early warning infrastructure recommendations have been postponed or softened. Nevertheless, initiatives like Uttarakhand's state-specific action plans and the revisions to the National Disaster Management Plan do represent though the pace does not yet match the urgency, initiatives like the Common Alerting Protocol (CAP) and investments in satellite-based alerts demonstrate that things are moving in the right today, many remote villages depend on local knowledge—like the sound of rising rivers, the change in winds, or the whistling alerts shared between neighbours—because mobile alerts, sirens, or public announcements either don't reach them or are not trusted. The lack of communication coverage during the Uttarkashi incident, caused by power outages and broken networks, made this vulnerability government has piloted multi-platform alerting systems, including SMS, radio, and loudspeaker integration in high-risk districts, and these are beginning to reach more communities. Still, coverage remains patchy, and public trust in these alerts needs to be strengthened through community engagement. The Himalayas are fragile. This region, formed by the collision of tectonic plates, is geologically young and unstable. The rains are not new, but the damage they cause has been made worse by human intervention. Between 2000 and 2010 alone, nearly 4,000 hectares of forestland were diverted for 2012 and 2013, further tracts were opened up. Debris dumping, unchecked sand extraction, and river channel manipulation have altered watercourses, making floods more was no way to stop the Uttarkashi disaster, but we can reduce the harm it causes. That means reducing exposure by limiting settlements in high-risk zones, protecting river corridors, enforcing building codes, and designing infrastructure that respects water's guidance has improved—revised Central Water Commission rules and stricter environmental clearance procedures are steps forward—but weak enforcement undermines their effect. The 2000 order banning construction within 200 metres of riverbanks is still widely ignored, and court rulings to remove illegal structures have not always been second and growing risk comes from hydropower development. After Kedarnath, experts reviewed projects in the Bhagirathi and Alaknanda basins, yet many small hydropower schemes continue to be approved without cumulative environmental impact diversions and other alterations dry out river stretches and reduce ecological resilience; when floods come, these modifications amplify the damage. Strengthening oversight, insisting on cumulative assessments, and prioritising river health alongside energy needs will make communities safer. Resilient design, community involvement, and early warning infrastructure recommendations have been postponed. Photo: PTI Early warning systems in the Himalayas must move beyond one-size-fits-all solutions and become decentralised, layered, and rooted in community action. A single SMS is not enough in poor signal zones; what's needed are overlapping communication tools like radio, sirens, mobile alerts, and trained local volunteers. Pilot efforts in Uttarakhand are trying this hybrid approach, but they must now become standard practice across all vulnerable regions, with local people involved at every even the most precise forecasting cannot offset poor land-use choices—reckless construction, disrupted river courses, and unchecked mining continue to make fragile terrain even more vulnerable. While some improvements have taken place since Kedarnath in 2013, including quicker response and better coordination, events like the Uttarkashi cloudburst remind us that progress needs to be faster and more cannot be controlled, but our decisions around risk, development, and preparedness can still decide how much damage it causes.(This is an authored article. Dr Eilia Jafar is a seasoned expert in disaster management, governance, climate change adaptation, and gender inclusion. The views expressed are her own.)- EndsMust Watch


New Indian Express
4 hours ago
- New Indian Express
Aluva river bridge track renewal to affect train schedules; two trains cancelled, several delayed
KOCHI: The final phase of track renewal works over Aluva river bridge no. 176 will be completed during the traffic regulations from Friday to Sunday. Two trains scheduled to leave on August 9 and 10 – train no. 66609 scheduled to leave Palakkad Junction at 07.20 hrs, and train no. 66610 scheduled to leave Ernakulam Junction at 14.45 hrs – will be fully cancelled. Train no. 22645 will be delayed en route for 1 hour 55 minutes on August 9 and 1 hour 20 minutes on August 10. Train no. 16308 will be delayed en route for 1 hour and 45 minutes on August 9 and 1 hour and 15 minutes on August 10. Train no. 17230 will be delayed en route for 1 hour on August 9 and 30 minutes on August 10. Train no. 20631 will be delayed en route for 25 minutes on August 10. Train no. 20910 will be delayed for 45 minutes en route on August 9. Train no. 13351 will be delayed for 25 minutes en route on August 9. Train no. 20632 scheduled to leave Thiruvananthapuram Central at 16.05 hrs will be rescheduled to leave Thiruvananthapuram Central at 16.50 hrs, with a delay of 45 minutes on August 9 and at 16.15 hrs, with a delay of 10 minutes on August 10. Passengers are requested to check the updated timings on the National Train Enquiry System (NTES) website/NTES mobile application and plan travel arrangements accordingly.


Economic Times
a day ago
- Economic Times
Rain to dampen Ekka weekend plans as wet weather, winds and cool temperatures sweep across Queensland
Synopsis Queensland is bracing for a wet and cold weekend. A large weather system is moving across the state. Showers and strong winds are expected. Central Queensland will likely receive the heaviest rainfall. Cities like Rockhampton and Gladstone may see significant rainfall. Brisbane could have a wet start to the Ekka weekend. Cooler temperatures are also forecast. TIL Creatives The BOM confirmed that showers had already started Thursday morning, August 7, in western and central areas in Queensland and would build across the east coast by the afternoon. Queensland is in for a rainy and chilly weekend as a large weather system moves across the state, bringing widespread showers, strong winds, and cooler-than-usual temperatures. A cloud band stretching over 3,000km from the Indian Ocean is interacting with a low-pressure system off the Queensland coast, which is expected to trigger significant rainfall across central and southern parts of the state. The Bureau of Meteorology (BOM) confirmed in a video posted on X that showers had already started Thursday morning, August 7, in western and central areas and would build across the east coast by the afternoon. Watch: National Weather Forecast 7 August 2025: Wet weather returns to parts of the east and west coasts Video current: 12pm AEST 7 August 2025. For the latest forecasts and warnings go to our website or the BOM Weather app. — Bureau of Meteorology, Australia (@BOM_au) August 7, 2025 Wet conditions are expected from Mackay southwards, including Brisbane. Central Queensland is likely to receive the heaviest falls, with local totals nearing 300mm in areas close to the low's path. Cities such as Rockhampton, Gladstone, and Yeppoon could each record more than 50mm of rainfall. Bundaberg may see up to 65mm over two days, while Hervey Bay is forecast to get 20mm on Friday and up to 50mm on could face a wet start to the Ekka weekend, with 20mm of rain expected and winds reaching up to 30km/h. According to a Sky News report, the Gold Coast may see around 95mm of rain from Friday to approaching system will also bring cooler temperatures. Thargomindah in the southwest is forecast to hit just 18°C on Friday, below its August average of 23.1° BOM has issued Coastal wind warnings for regions including the Sunshine Coast, Gold Coast, and Capricornia. Although hazardous surf alerts have been lifted, sea conditions are expected to remain rough into the are advised to keep umbrellas handy, stay updated on forecasts, and watch for localised flooding in high rainfall areas.