logo
IAF Steps In For Relief Ops In Flood-Hit Uttarkashi

IAF Steps In For Relief Ops In Flood-Hit Uttarkashi

India.com3 days ago
The Indian Air Force (IAF) has deployed Chinook heavy-lift helicopters to carry out relief and rescue operations in disaster-hit areas of Uttarkashi district, following a severe cloudburst and mudslide that left several people stranded near Dharali village.
The state has been witnessing heavy monsoon-triggered disruptions, especially in its higher-altitude regions, prompting large-scale evacuation and relief operations led by multiple agencies. Two cloudbursts on Tuesday, one in Dharali and another in the Sukhi Top area near Dharali, caused widespread destruction, with Dharali bearing the brunt.
So far, 274 people have been rescued from Dharali, with the Indian Army, Indian Air Force (IAF), along with ITBP, NDRF, SDRF, BRO, and local volunteers engaged in a joint rescue and relief operation to search for the missing.
Three civilian deaths have been confirmed so far, while over 50 people are still reported missing, as per the administration. Meanwhile, Pushkar Singh Dhami visited Pauri Garhwal today to meet those who were rescued from disaster-hit areas of the district.
The Chief Minister assured the survivors that rescue and relief operations were underway at full speed with the support of the Army personnel. Speaking to mediapersons during his visit, CM Dhami said, "This disaster has caused a lot of damage. The entire area has been devastated. A cloudburst occurred here, and heavy rainfall took place... The road has been completely affected by landslides."
The Chief Minister shared details of the rescue efforts, saying, "190 people were rescued immediately on the same day... So far, 274 people have been rescued... Food supplies are being sent there... Army personnel are engaged in rescue operations..." Relief and rescue operations are continuing on a war footing, with the joint efforts from the Uttarakhand Police, SDRF, Army, ITBP and other relief agencies.
According to the Uttarakhand Police, the people rescued under the Uttarkashi Disaster Relief Operation were brought from Harshil to Jollygrant Airport, Dehradun, on Thursday by a Chinook helicopter. Medical check-ups are being conducted for all the evacuees at the airport.
Earlier today, CM Dhami also visited Sainji village and disaster-affected areas, meeting locals and assuring them of all possible help. He reviewed the relief and rescue operations from ground zero.CM Dhami reached the disaster-affected area within 24 hours of the disaster.
The CM also visited a hospital in Uttarkashi to meet people affected by the recent natural disaster. He inquired about their well-being and instructed doctors to ensure proper treatment for all victims.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Uttarkashi flash floods: Rescue operations enter day six; 1,308 people evacuated
Uttarkashi flash floods: Rescue operations enter day six; 1,308 people evacuated

New Indian Express

time2 hours ago

  • New Indian Express

Uttarkashi flash floods: Rescue operations enter day six; 1,308 people evacuated

DEHRADUN: Air rescue operations have resumed for the sixth day in disaster-hit Harsil and Dharali, Uttarkashi. 1,308 people had been safely evacuated so far. Indian Army's MI-17 and Chinook helicopters, alongside state choppers, tirelessly work on the mission, navigating the challenging mountainous terrain. State Disaster Management Secretary, Vinod Kumar Suman, informed TNIE that the Limchagad bridge's completion is a major boost to ongoing operations. This vital link connects the India-China border with the revered Gangotri Dham, and its opening is expected to greatly accelerate ground operations and aid movement into the affected zones. Chief Minister Pushkar Singh Dhami is personally overseeing rescue efforts "Our top priority is to safely evacuate every person and ensure they receive all necessary support," the Chief Minister stated. "The Limchagad bridge's completion is a significant step forward." With clearer skies and improved connectivity now established, relief work is expected to intensify. Six days after the devastating cloudburst in Harsil-Dharali, Uttarkashi, the grim search for those buried under metres of debris continues with agonizingly little success.

Over 1,000 rescued in Uttarkashi, search for missing continues on day 6
Over 1,000 rescued in Uttarkashi, search for missing continues on day 6

India Today

time7 hours ago

  • India Today

Over 1,000 rescued in Uttarkashi, search for missing continues on day 6

Relief and rescue operations continue for the sixth consecutive day in the Dharali area of Uttarakhand's Uttarkashi following a devastating cloudburst that triggered flash floods and landslides, which claimed lives of five people. All stranded tourists in the affected region have been safely evacuated as part of the coordinated rescue efforts by the Indian Army, state government and other agencies under Operation Zindagi. #WATCH | Uttarkashi, Uttarakhand: Search and rescue operation underway in the Dharali-Harsil area following a cloudburst. ANI (@ANI) August 10, 2025advertisementAccording to a statement from the Indian Army, 33 helicopter sorties conducted by Army and civil aviation teams have evacuated 195 civilians, while nearly 200 tourists were safely escorted through landslide-prone zones and transported from the Harsil helipad on Saturday. Chief Minister Pushkar Singh Dhami confirmed that over 1,000 people have been rescued and all injured individuals have been transferred to medical facilities. To further streamline the evacuation process and ensure the efficient delivery of relief materials, an aerial corridor has been established between Uttarkashi and to the District Information Officer, health services are being provided to affected residents, while water supply and electricity have been restored in parts of Harsil, Mukhwa and to clear debris and restore road access in Dharali are underway, though connectivity remains severely disrupted. A five-kilometre stretch of road beyond Gangnani has been entirely washed away and adverse weather conditions are resulting in delays in some air operations, hindering the speed of relief and evacuation teams continue intensive search operations in both Harsil and Dharali, focusing on locating any remaining missing persons. Several labourers trapped near Gangotri due to blocked routes and rising water levels have been successfully rescued and transported to Harsil for shelter and medical Indian Army's medical teams have already treated 35 individuals, and additional relief supplies are being airlifted from Dehradun. Over 1.4 tonnes of food have been delivered, with more supplies expected to arrive in the coming 9 August, road connectivity to Harsil, which had been completely severed, was restored. The Bailey bridge at Limchigad, which will reconnect the Rishikesh-Gangotri National Highway (NH-34), is in its final stages of completion. This bridge replaces a previous structure destroyed by the floods. The Border Roads Organisation (BRO) and Indian Army engineers are leading the bridge construction efforts and are also working to clear roads between Gangotri and Uttarkashi. A temporary 330-foot cableway is being built to provide passage where roads remain submerged or M S Dhillon informed that locating those trapped beneath the debris remains the primary focus of the rescue operations today. advertisement"Since August 5, the army, state government, and other agencies have been working continuously. Today, we are concentrating on finding individuals buried under the debris caused by the cloudburst. We are using ground-penetrating radar to detect human or metal objects buried beneath the earth. Satellite communication systems have also been established," Dhillon said.#WATCH | Uttarkashi, Uttarakhand: On the ongoing search operation in the Dharali-Harsil area following a cloudburst, Brigadier M S Dhillon says, "Since the 5th August, the army, state government, and other agencies have been continuously working on rescue and relief operations. ANI (@ANI) August 10, 2025In addition to the ongoing operations, the state government has formed a three-member committee to assess the damage, supervise rehabilitation and recommend long-term solutions. The committee will submit a preliminary report within one week. The committee comprises: Surendra Pandey, Revenue Secretary (Chair); Ashish Chauhan, CEO, Uttarakhand Civil Aviation Authority; and Himanshu Khurana, Additional Secretary (Finance). The Chief Minister also announced immediate financial assistance of Rs 5 lakh each for the families of the deceased and those whose homes were completely destroyed in Dharali. Affected families will also receive ration supplies for six months.- Ends advertisementIN THIS STORY#Uttarakhand

Video: Army builds 90-ft Bailey bridge in Uttarkashi to reconnect flood-hit areas
Video: Army builds 90-ft Bailey bridge in Uttarkashi to reconnect flood-hit areas

India Today

time8 hours ago

  • India Today

Video: Army builds 90-ft Bailey bridge in Uttarkashi to reconnect flood-hit areas

The Indian Army, in a swift mission in the cloudburst-hit Dharali area of Uttarakhand, has constructed a crucial Bailey bridge, restoring connectivity to cut-off regions and facilitating the transport of rescue teams and relief supplies to stranded bridge, built jointly by the Army and the Border Roads Organisation (BRO) after an overnight operation, now awaits the construction of approach roads to allow vehicles to reach Dharali, where four people were killed, and scores remain missing and stranded after a flash flood washed away the village days along the Gangotri National Highway, the Bailey bridge spans the Limchagad between Gangnani and Dharali. With a load capacity of nearly 50 tonnes, it is expected to significantly aid rescue operations in the challenging Himalayan terrain. 'It is a 90-foot triple-single Bailey bridge. The work is almost complete, with only minor finishing tasks pending, which will be done shortly,' BRO Commander KVN Raja Kumar told India Today at the site, just before construction was Secretary Shailesh Bagauli said that until the approach roads are repaired, horses and mules should be used to transport essential supplies to the affected villages. He has also directed officials to ensure the supply of 2,000 litres of diesel per day to Dharali and to facilitate the delivery of LPG cylinders to those impacted. Authorities are also clearing blockages along the highway at Songad, Dabrani, Harsil, and Dharali on a war footing. However, heavy rains on Sunday morning hampered helicopter evacuations of stranded evacuation efforts began on Wednesday, more than 1,000 people had been airlifted by Saturday evening from around Dharali and Harsil, where an Army camp also suffered damage in the flash floods, leaving nine personnel missing.- EndsInputs by Anjilee Istwal in DharaliTune InMust Watch IN THIS STORY#Uttarakhand

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store